My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12815 19TH AVE SE 2020-02-24
>
Address Records
>
19TH AVE SE
>
12815
>
12815 19TH AVE SE 2020-02-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2020 2:07:28 PM
Creation date
2/24/2020 2:07:09 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
12815
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FOR •FFICE USE •NLY PERMIT# O\ g � \ 11 <br /> BUILDING PLANNING <br /> BldgT l/Addn/Rem Size Zoning Classification <br /> Garage Size Overlay/Agreement <br /> VALUATION Nonresidential Use <br /> Number of Stories Residential Use <br /> a <br /> Occupancy Group Proposed No.of Dwelling Units: <br /> Occupant Load Total No. of Dwelling Units: <br /> Basement No_ Yes_ Fin / Unfin Landscape or Planning Inspection <br /> Type of Construction needed before final? Yes_ No <br /> Existing Sprinkler System? Yes No_Unk_ Planning Inspector: <br /> Fire Sprinkler Required Yes— No Phone#: <br /> Reason Approved by: Date: <br /> Existing Fire Alarm Yes_ No UnkHistoric Approved by: Date: <br /> Fire Alarm Required Yes— No_ School Mitigation Reqd? Yes No_ <br /> Reason Everett School Dist Mukilteo School Dist <br /> RCW 64.55 MF worksheet req'd for permit? Yes_ No #of Net New Units: <br /> Add'I RCW 64.55 docs required prior to final?Yes_ No_ Calculated School Impact Fee: <br /> Architectural Approved By/Date: School Impact Fee Credit: <br /> Structural Approved By/Date: Total School Impact Fee Owed: <br /> l le& fe'eei:( aria 7e. `'VI IC!U/i 1 , Comments: <br /> Iib� f?di�1V <br /> ntake OK by: Intake OK by: Ok to route — Hold _ <br /> Make this a"W"Permit? Yes No <br /> PUBLIC WORKS . • <br /> FEES ::. INTAKE: Checked By: Date: <br /> Plan Check Fee Comments: <br /> Building Permit <br /> Surcharge High Hazard Sites(Dental/Medical,Animals,Mortuary,etc-Review for RPBA) <br /> Additional Plan Check ® Public Works/Sys Dev/Traffic Mit./RPBA-NOT REQUIRED <br /> Plumbing Fee 0 Route for Public Works Review(bldg folder, PW Worksheet) <br /> Mechanical Fee 0 Public Works Permit-Concurrent Review(separate green folder) <br /> Ping Bldg Review Fee PW REVIEW: PW Reviewer: Date: <br /> Water Fee 0 PW Permit Approved-PW <br /> Sewer Fee 0 See PW Review Worksheet <br /> Systems Dev. Fee 0 PW Permit Not Required <br /> Traffic Mitigation Fee <br /> Public Works Fee FIRE DEPARTMENT <br /> School Mitigation Fee Update/New Sprinklers Yes_ No_ Existing Bldg._ <br /> Update/New Detection -Yes_ No_ Existing Bldg._ <br /> Update/New Chemical Yes_ No_ Existing Bldg._ <br /> Update/New Fire Service Yes_ No_ Existing Bldg. <br /> Approved by: Date: <br /> Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.