My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3202 20TH ST VERIZON WIRELESS ANTENNA 2020-02-24
>
Address Records
>
20TH ST
>
3202
>
VERIZON WIRELESS ANTENNA
>
3202 20TH ST VERIZON WIRELESS ANTENNA 2020-02-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2020 2:35:00 PM
Creation date
2/24/2020 2:33:52 PM
Metadata
Fields
Template:
Address Document
Street Name
20TH ST
Street Number
3202
Tenant Name
VERIZON WIRELESS ANTENNA
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL NOTES: ABBREVIATIONS: <br /> 1. THE PROPOSED INSTALLATION WILL BE UNMANNED AND DOES NOT REQUIRE POTABLE WATER OR AFF ABOVE FINISHED FLOOR JT JOINT <br /> SEWER SERVICE. AFG ABOVE FINISHED GRADE LAM LAMINATED <br /> AFS ABOVE FINISHED SLAB LF LINEAL FOOT <br /> 2. THE PROPOSED INSTALLATION IS UNMANNED AND IS NOT FOR HUMAN HABITATION(NO HANDICAP ALUM ALUMINUM MANUF MANUFACTURER <br /> ACCESS IS REQUIRED) AB ANCHOR BOLT MAX MAXIMUM <br /> ,. L ANGLE MECH MECHANICAL <br /> 3. OCCUPANCY IS LIMITED TO PERIODIC MAINTENANCE AND INSPECTION,APPROXIMATELY 2 TIMES PER ARCH ARCHITECTURAL MH MANHOLE <br /> MONTH,BY VERIZON TECHNICIANS. BTS BASE TRANSMISSION SYSTEM MM MILLIMETER - <br /> BLDG BUILDING MIN MINIMUM <br /> 4. NO NOISE,SMOKE,DUST OR ODOR WILL RESULT FROM THIS PROPOSAL. BM BEAM MISC MISCELLANEOUS <br /> BOT BOTTOM MPH MILES PER HOUR O <br /> 5. OUTDOOR STORAGE AND SOLID WASTE CONTAINERS ARE NOT PROPOSED. B.O. BOTTOM OF MTL METAL <br /> BOC BOTTOM OF CONCRETE NIC NOT IN CONTRACT <br /> 6. ALL REFERENCES TO SPECIFIC STANDARDS FOR THIS PROPOSAL ARE UNDERSTOOD TO BE THE LATEST BOS BOTTOM OF STEEL NOM NOMINAL <br /> VERSION. CJ CONTROL JOINT NTS NOT TO SCALE <br /> CENTER LINE OC ON CENTER <br /> 7. THE TENDERED MUST UNDERGO A SITE VISIT TO CAREFULLY EXAMINE AND UNDERSTAND THE SCOPE OF Cc.LG CEILING OD OUTSIDE DIAMETER . <br /> THE WORK REQUIRED BEFORE BID SUBMISSION.NO COMPENSATION IN ANY FORM WILL BE PAID FOR CLR CLEAR OH OVERHEAD <br /> EXPENSES RESULTING FROM FAILURE TO DO SO. CMU CONCRETE MASONRY UNIT OPNG OPENING <br /> COL COLUMN OPP OPPOSITE <br /> 8. IF THE SPECIFIED EQUIPMENT CAN NOT BE INSTALLED AS SHOWN ON THESE DRAWINGS,THE CONC CONCRETE PCS PERSONAL COMMUNICATION SYSTEM <br /> CONTRACTOR SHALL PROPOSE AN ALTERNATIVE INSTALLATION FOR APPROVAL BY THE CONSTRUCTION CONST CONSTRUCTION R PLATE <br /> 1111/1 <br /> MANAGER. CONT CONTINUOUS PR PAIR <br /> CTR CENTER PSI POUNDS PER SQUARE INCH <br /> 9. CONTRACTOR IS RESPONSIBLE FOR FIELD MEASUREMENTS TO CONFIRM LENGTHS OF CABLE TRAYS, DIA/0 DIAMETER PSF POUNDS PER SQUARE FOOT <br /> ELECTRICAL LINES,AND ANTENNA CABLES. DTL DETAIL PT PRESSURE TREATED <br /> 111.1111 <br /> (E) EXISTING RAD RADIUS <br /> 10. ROUTING OF ALL CONDUITS,CABLES,CABLE TRAYS,ETC.IS INDICATED AS PROPOSED LOCATIONS ONLY. EA EACH RD ROOF DRAIN <br /> CONFIRM THE EXACT ROUTING WITH THE ON-SITE CONSTRUCTION MANAGER PRIOR TO THE START OF EJ EXPANSION JOINT REINF REINFORCED/REINFORCING <br /> WORK. ELEC ELECTRIC/ELECTRICAL REQ'D REQUIRED <br /> EL ELEVATION RM ROOM <br /> 11. ALL DAMAGE OR OPENING UP OF THE EXISTING STRUCTURE MUST BE MADE GOOD TO THE EQ EQUAL RAN RIGHT OF WAY <br /> PRE-CONSTRUCTION CONDITION OR BETTER. EW EACH WAY SCHED SCHEDULE <br /> EXP EXPANSION SECT SECTION <br /> 12. INSPECTION OF COMPLETED WORK IS REQUIRED BEFORE COVERING UP.PROVIDE A MINIMUM OF 72 EXT EXTERIOR SF SQUARE FOOT LDC I sNrreying <br /> HOURS NOTICE TO CONSULTANT. FD FLOOR DRAIN SIM SIMILAR Engineering <br /> FIN FINISH SQ FT SQUARE FOOT Planning <br /> 13. REMOVE AND CLEAN UP ANY DEBRIS OR MATERIAL FROM THE SITE THROUGHOUT THE DURATION OF THE FIN FLR FINISH FLOOR SS STAINLESS STEEL <br /> CONTRACT ON A DAILY BASIS AND UPON COMPLETION OF THE WORK AS DIRECTED BY THE FLR FLOOR STD STANDARD ---Woodinville <br /> 8021Avenue NE 1851 Central el 5,P101 <br /> CONSTRUCTION MANAGER. FTG FOOTING STL STEEL Woodinville, <br /> .WA 9808 Kent,WA WOO <br /> GA GAUGE STRUC STRUCTURAL TeWO06.180 wnw.2OCroryso,e E9ssmz2e93 <br /> 14. OBTAIN AND PAY FOR ALL ELECTRICAL PERMITS AND INSPECTIONS REQUIRED FOR COMPLETION OF GALV GALVANIZED TEMP TEMPORARY <br /> WORK AND ACCEPTANCE.PROVIDED CERTIFICATES TO THE CONSTRUCTION MANAGER VERIFYING THAT GYP GYPSUM THK THICK <br /> THE WORK CONFORMS TO THE REQUIREMENTS OF ALL CODES AND AUTHORITIES HAVING JURISDICTION. GB GYPSUM BOARD T.O. TOP OF DATE: 2-28-19 <br /> HM HOLLOW METAL TOS TOP OF STEEL DRAWN BY: KTL <br /> 15. PROVIDE VERIZON WITH A WRITTEN WARRANTY,EFFECTIVE FOR ONE YEAR AFTER DATE OF HOR HORIZONTAL TOC TOP OF CONCRETE CHECKED BY: RBH <br /> ACCEPTANCE.FOR THE COMPLETE INSTALLATION REPAIR OR REPLACE ANY DEFECTS ARISING DURING HR HOUR TYP TYPICAL <br /> ' THIS PERIOD AT NO EXTRA COST TO VERIZON. HT HEIGHT UNO UNLESS NOTED OTHERWISE <br /> " HVAC HEATING VENTILATION AIR CONDITIONING VERT VERTICAL SUBMITTALS <br /> 16. NO DEVIATIONS FROM DESIGN SHOWN ON THESE DRAWINGS IS ALLOWED WITHOUT WRITTEN APPROVAL INSUL INSULATION W/ WITH REV DATE DESCRIPTION BY <br /> FROM THE CONSULTANT.FAILURE TO OBSERVE THIS RULE MAY RESULT IN CONTRACTOR CORRECTING INT INTERIOR WWM WELDED WIRE MESH 1 2-28-19 PRELIMINARY CONSTRUCTION KTL <br /> THE INSTALLATION AT THEIR EXPENSE. <br /> 2 41-19 FINAL CONSTRUCTION ML <br /> 3 10-2319 REM PLATFORM MOUNT AAL <br /> 17. THE CONTRACTOR SHALL COMPLY WITH ALL LOCAL AND NATIONAL CODES,REGULATIONS AND SAFETY <br /> REGULATIONS.ALL OSHA REGULATIONS,ALL PUBLIC AND MUNICIPAL AUTHORITIES,AND ANY UTILITY <br /> 1 COMPANIES'REGULATIONS AND DIRECTIVES. <br /> el 18. THE DRAWINGS AND SPECIFICATIONS ARE A GENERAL DIRECTIVE FOR THE SCOPE OF WORK.EXACT <br /> DIMENSIONS AND LOCATIONS MAY CHANGE IN THE FIELD.THE CONTRACTOR IS TO VERIFY THE <br /> FLi <br /> DIMENSIONS AND LOCATIONS AND REPORT ANY AND ALL DISCREPANCIES TO REPRESENTATIVE.ANY <br /> o M- INOR ERRORS AND OMISSIONS IN THE DRAWINGS AND SPECIFICATIONS DOES NOT EXCUSE THE 882, REGISTERED <br /> ti <br /> CONTRACTOR FROM COMPLETING THE PROJECT AND IMPROVEMENTS IN ACCORDANCE WITH THE ARCHITECT <br /> INTENT OF THESE DOCUMENTS. <br /> lo ARCHITECT <br /> ET <br /> 19. VERIFICATION THAT EXISTING MONOPOLE CAN SUPPORT THE PROPOSED ANTENNA COAX AND RICH•- AZ <br /> ADDITIONAL EQUIPMENT LOADING IS TO BE DONE BY OTHERS. <br /> STATE OF WASHIIGTON1 ,0 <br /> 20. ANTENNA AZIMUTHS SHOWN ON THESE DRAWINGS ARE BASED ON TRUE NORTH.ALL AZIMUTHS MUST BE <br /> h <br /> EXPIRES:8-20-21 4 <br /> VERIFIED WITH THE CORRECT RFDS PRIOR TO CONSTRUCTION. <br /> U <br /> APPROVAL STAMP <br /> i <br /> LEGEND AND SYMBOLS: <br /> i CHAIN LINK FENCE X X <br /> CEDAR FENCE ❑ ❑ <br /> POWER P <br /> 6 U- NDERGROUND POWER uGP <br /> c TELCO T <br /> U- NDERGROUND TELCO uGT SITE <br /> 27 OVERHEAD POWER OH <br /> I BOUNDARY -- <br /> CENTERLINE — SEA GARFIELD-4 RX <br /> c REVISION BUG AL, <br /> // 3200 20TH ST <br /> o / EVERETT,WA 98201 <br /> E- LEVATION A F2 hPROPOSED ELEVATION l/ <br /> 0'-0"AGL SHEET TITLE <br /> i GENERAL NOTES <br /> D- ETAIL NUMBER e <br /> ''^ 1 S- HEET NUMBER X --t-A*.-------,A.A.--A.-- <br /> © CCell2 Business Days Before You Dig <br /> a SECTION BUG an 1-800-424-5555 SHEET NUMBER <br /> Utllties Underground Location Center <br /> L'2 <br /> (MONTANA,WABHINGTHIIJGTON) G-1 .0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.