Laserfiche WebLink
GROUNDING KEYED NOTES <br /> 15 79•E't0 EXISTING GROUND RING AT BASE OF MONOPOLE(FIELD VERIFY). <br /> OEXISTING MGB AT BASE OF MONOPOLE.0 <br /> 03 EXISTING AGB AT ANTENNAS.0 <br /> O4 EXISTING AGB CONNECTED TO MGB WITH(2)#2 BTCW. all <br /> AniI % PROPOSED VERIZON ANTENNA PER PLAN,TYP. <br /> = <br /> i <br /> 0EXISTING MONOPOLE. 0 <br /> QCONNECT PROPOSED ANTENNA&RRUS UNITS WITHMk <br /> #2 BTCW TO AGB(TYPICAL AT EACH ANTENNA). N <br /> •- <br /> ii. <br /> 1 0 <br /> 1 l <br /> GENERAL GROUNDING NOTES <br /> F 1. ALL DETAILS ARE SHOWN IN GENERAL TERMS.ACTUAL INSTALLATION <br /> AND CONSTRUCTION MAY VARY DUE TO SITE SPECIFIC CONDITIONS. OP <br /> © 2. ANY METAL OBJECTS WITHIN 6 FEET OF THE EXTERNAL GROUND RING <br /> SHALL BE GROUNDED. <br /> O 3. ALL GROUND CONNECTIONS SHALL BE CADWELD AND CLEANED <br /> THOROUGHLY THEN COVERED WITH TWO(2)COATS OF SHERWIN <br /> x x 7 WILLIAMS GALVANTE PAINT B350W3 OR EQUAL.SEE 1/E-2.0 FOR Surveying <br /> / 1// , Et�� 4. ALL WIRES SHALL BE COPPER THHN/THWN.ALL GROUND WIRE SHALL / <br /> Engineering <br /> i�4 1 0� LDI� g <br /> BE GREEN INSULATED WIRE ABOVE GROUND. Planning <br /> +_, �1 / 3. ALL ELECTRICAL CADWELD AND MECHANICAL CONNECTIONS SHALL <br /> / Q HAVE NON-OXIDATION COMPOUND APPLIED TO CONNECTION. v�61�9 <br /> 4 e <br /> •.,%;:;:„..:.;® / 4. ALL MATERIALS AND CADWELD MOLDS,SHOTS,ETC.SHALL BE <br /> 0011""f-- <br /> / s FURNISHED AND INSTALLED BY CONTRACTOR UNLESS OTHERWISE <br /> le <br /> � :: � •'�[-1: NOTED. <br /> . 1 • 0 \�� ( 5. REFER TO DIVISION 16 GENERAL ELECTRIC;GENERAL ELECTRICAL DATE: 2-28-19 <br /> ‘ PROVISION AND COMPLY WITH ALL REQUIREMENTS OF GROUNDING <br /> I Q f DRAWN BY: KTL <br /> I STANDARDS. <br /> Iy A J,� � \\)/1 <br /> /� , 6. NOTIFY CONSTRUCTION MANAGER IFTHEREARE ANY DIFFICULTIES CHECKEDBY: RBH <br /> 1 ,. „ . ,,,. ! s.Kr' .�' �T._ _ �. ® / / INSTALLING GROUNDING SYSTEM DUE TO SITE SOIL CONDITIONS. <br /> • 4 r1 _ _ / y 7. USE PANT SCHEME FOR LOADING GROUNDS ON MGB AS DISCUSSED IN SUBMITTALS <br /> / I NSTD 119,33&36. <br /> ,• •• `\\`\ ' <br /> 4r, I, \ \\ `\ / / REV DATE DESCRIPTION BY <br /> ) .. ` \,,1 ®./ / �i © 1 2-2&19 PRELIMINARY CONSTRUCTION KTL <br /> AL CONSTRUCTION AAL <br /> ` v� \ \ .TJ✓ = / 3 10.029.89 RECD:PLATFORM MOUNT AAL <br /> I / / ♦. <br /> 1 L i \\� GROUNDING LEGEND 6828 <br /> CI <br /> \ REGISTERED <br /> a I I MB '444, <br /> `' \ �'°I tip I �" %%j GROUND BAR .• ARCHITECT <br /> \ • <br /> �y —___ • L I a� ' \\ • QQ GROUND INSPECTION WELL �• <br /> RICHAR• AL <br /> SIC HA IYASHINGTL <br /> I ` ...K �t • COPPER GROUND ROD ry..f <br /> L __--I L ```� �// EXPIRES:8-20-21 <br /> — 1 ,''�,� © ♦ COMPRESSION LUG <br /> 1 'r, I't " ' ��� nU !:'�`�` CADWELD CONNECTION <br /> APPROVAL STAMP <br /> SI � ii11 �r! I � I � i, 1 , � SIDE SPLICE CADWELD <br /> 2 I II `5- - _ <br /> c I 3• FIELD VERIFY&TIE INTO EXISTING GROUNDING SYSTEM <br /> r <br /> PROPRIETARY INFORMATION <br /> =L..iI <br /> s. THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION <br /> 6 I I DOCUMENTS IS PROPRIETARY BY NATURE.ANY USE OR DISCLOSURE <br /> tIL 1 OTHER THAN THAT WHICH RELATES TO VERIZON SERVICES ARE STRICTLY SITE <br /> PROHIBITED. <br /> SEA GARFI ELD-4 RX <br /> x 3200 20TH ST <br /> 5 I EVERETT,WA98201 <br /> T <br /> b I SHEET TITLE <br /> •I I .I I SCHEMATIC GROUNDING PLAN <br /> a SHEET NUMBER <br /> SCHEMATIC ANTENNA GROUNDING PLAN 1 /! i � E-� •0 <br /> 22"x34"SCALE:1/2"=1' I 11"x17"SCALE:1/4"=1'-0" <br />