My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
700 35TH ST 2020-02-24
>
Address Records
>
35TH ST
>
700
>
700 35TH ST 2020-02-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2020 3:41:36 PM
Creation date
2/24/2020 3:41:03 PM
Metadata
Fields
Template:
Address Document
Street Name
35TH ST
Street Number
700
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
37 SPR-E20-327-WHT-AC Module 12.1 kW PV Array- 11840w AC Max Output <br /> NOTES: <br /> 4 branch circuit @ 12, 12, 8, 5 AC modules: 1.ALL AC PV MODULES SHALL BE CONNECTED WITH MANUFACTURER SUPPLIED CONNECTORS. <br /> SYSTEM INCLUDES RAPID 2.INVERTER BRANCH CIRCUIT TRANSITION BOX SHALL BE LOCATED ON THE ROOF AND NEMA 3R <br /> —SPR E20-327- SHUTDOWN AND REQUIRED RATED. <br /> ACPV LABELING. RAPID SHUTDOWN 3.ALL WIRES FROM ROOF TRANSITION BOX TO AC COMBINER PANEL SHALL BE 10AWG.THWN-2 AND <br /> AC Modules IN CONDUIT TO MEET NEC CODE AND LIMIT VOLTAGE DROP TO LESS THAN 2%. <br /> 240AC11.3ac IS INITIATED BY LOSS OF 4.WIRING IN DC CIRCUITS TO BE RATED 600V-90C,EXPOSED CABLES SUNLIGHT RESISTANT. <br /> 5.PV SYSTEM Voc SHALL NEVER EXCEED 600 VDC. <br /> max output UTILITY POWER. 6.PRODUCTION METER&PV SYSTEM DISCONNECT SHALL BE LOCATED NEXT TO NET-METER. <br /> �,. ����� T ♦��r�►� ..,�►* 7.PV MODULE,AND RACKING CONTINUOUS GROUNDING CONDUCTOR SHALL BE 10AWG MINIMUM. <br /> •�i♦i♦:♦1 '�a♦i A'i �� �•��� .k'� MARKING/LABELING <br /> +A 0s; ► kir �iVi aso ••••0 's; PER NEC 690/705 200 amp service <br /> ♦t Iiil ► ♦♦4 G'4I F•#• •fl ♦#i4 �• I <br /> ;Z;44� y! i� +, � �i •3� SOLAR kWh METER <br /> •.•. •..'r47' ., I �A1O. 2 k♦.Asti♦' •♦*I '•"�' 8 Meter#: 231984 <br /> AC AC AI Ar I ,e _ <br /> Modul= I Module'1 I Module 1 I Mod 11 120/240 VAC 10 <br /> See I I I I L1 L2 FROM UTILITY <br /> detail — <br /> at right I I I I #4AWG CU 9 r e' "e_) <br /> / I I I I OR _�„,--GREATER — 0 SPR-E20-327-WHT-ACPV MODULE <br /> �' �--- L1 L2�-•--•--,• <br /> A� A► I I N IO <br /> ►i♦i4 I :,I �14c 1 ♦•♦4AA�, . I I • I Existing <br /> 'iii ♦♦♦i ' 4i 1 44 �i I OQ ♦ Module DC <br /> ►. I x '1 I +►� +a 100 am o .._ Bonding <br /> ►♦♦♦♦�' W oa �+A` ,.� ♦♦i �A( �� • Jum er input <br /> �. 411 '0=110' I.IG :I 1'4 ,I 01 1 � 4I utility G I P <br /> o. 411 I •V, • i .i ♦ �y AC I 200 / <br /> disconnects ' N I <br /> I (locking, Siemens _ _ DC <br /> I I visible 200A 50A 'I:1 1:I <br /> break) PV AC Panel "0 <br /> I I I Service 14-50R AC <br /> I I <br /> #4AWG CU OR Disconnect o <br /> I GREATER n Q <br /> I I I 240 VAC 1 o oO <br /> Grounding <br /> AC 60HZ, conductor �' <br /> AC I Ai I /1,1 49.3AAC(max) (terminals (L1 L2 <br /> Module Module 11840Wmp n ri GEC Inverter AC output: <br /> P <br /> 12 I I Mod le 8 I Mod le 5 a 320watts,240vac/1.33A <br /> 12 A A G <br /> 14. <br /> i� C': l''' <br /> ♦ � <br /> II ,,... i. Q I Existing <br /> •� �s• . ' I.1.)I ♦► 1 I N' Groundin <br /> g <br /> . .. • 4•• Al ! Electrode <br /> •►♦ -c • ♦O ♦a• .,,,p, _ <br /> System <br /> L L <br /> i 1 i <br /> 1 1 1 II- 20A <br /> 1 1 1 I 1 <br /> 1 1 1 I L 1 <br /> ----) <br /> 1 1 1 I 2 I J 20A <br /> — <br /> I I I I I 6/1 1 I I I - 20A <br /> L—.! I— <br /> I <br /> L <br /> 1—41 G 20A monitor <br /> �1 7 j ��j T <br /> _ SUPER Utility District: PROPERTY OF Sunergy <br /> Y Y VISORSnoPUD Systems L -1'STEMS <br /> 10awg EQUIPMENT 100am4546 Leary Way NW <br /> NEMA p ac Jurisdiction: Customer:Witte Seattle,WA 98107 <br /> GROUND 3R roof Combiner Everett Project: <br /> MODULE EQUIPMENT panel: <br /> GROUND—UL listed/NEC junction Drawn By: 12.1kW SunPower-ACPV Photovoltaic system <br /> box Location: Jon Lange,NABCEP site Address, Tide/Part/Descrition: <br /> compliant,SunModo NEXT TO <br /> Ground system Electrical ard Lamb,MSEE ineer: 700 35th StPV <br /> Y NET METER ELECTRICAL <br /> Date:10/10/19 Everett,WA 98201 CONFIGURATION DRAWING <br /> Signatures: <br /> Engineer: <br />
The URL can be used to link to this page
Your browser does not support the video tag.