Laserfiche WebLink
• <br /> Work Activity Work Order Page 2 <br /> 1/22/2020 9:36 <br /> Issued By BRP BIGLEY,RYAN P. <br /> Issued Department PW PUBLIC WORKS <br /> Date Issued 12/27/2019 <br /> Fund 401 Accounts Program Function Activity <br /> Program UT3473 19 3 <br /> Title CONVERT.75 INCH 1815 75TH ST SE UT3473-19-3 <br /> Work Order No 20193021 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 12/27/2019 Time 13:56 Original WO Billing <br /> Completed By Time Follow Up? <br /> Problem Details <br /> CONVERT.75 INCH CURBSTOP TO.75 INCH SETTER WITH METER AND <br /> BOX. FLAT TO METER PROJECT. <br /> Structure ID StrTyp Activity Compl Date Comments <br /> WS0785J052 WASRVC YES 12/31/2019 <br /> Address 1815 75TH ST SE <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference 75TH ST S.E.,1815 <br /> Location <br /> Material Costs Billing <br /> Type Mater No Description Quantity Cost Date War <br /> M BOX000154347 BOX METER MOLDED PLASTIC W/DI LID 11"X 18" (SMALL) 1 75.564 01/02/2020 PM <br /> M COUP34142747 COUPLING 3/4 CTS COMPRESSION X 3/4 MIP.871-.879 1 11.785 01/02/2020 PM <br /> M METE34141847 METER 5/8 X 3/4 NEPTUNE W/E-CODER R900I CU FT STUB ANTENNA 1 210.297 01/02/2020 PM <br /> M VALV34008348 VALVE METER 3/4 LOCKWING ANGLE METER VALVE SWVLNUT X 3/4FIP 1 66.452 01/02/2020 PAP <br /> Total Material Cost $364.10 <br /> NA Costs <br /> Type . Na No Description Quantity Cost Billing Date War <br /> NA N/A TOPSOIL .12 3.554 01/02/2020 <br /> Total NA Cost $3.55 <br /> Total Cost $367.65 <br />