Laserfiche WebLink
DAILY FIELD REPORT Inspection Date <br /> 10/28/2019 <br /> AAR TESTING AND INSPECTION, INC. <br /> 7126 180th Ave NE, Suite C101 Report Number <br /> Redmond,WA 98052 LDC102819 <br /> 425-881-5812 <br /> CLIENT INFORMATION PROJECT INFORMATION <br /> Contact Hud Allworth Project No. 19-648 <br /> Company Northwest Handling Systems, Inc. Project Name Snohomish County PUD <br /> Address 1100 SW 7th Street Address 1802 75th ST SW <br /> City Renton City Everett <br /> Contractor Pacific Construction Permit No. B1909-022 <br /> INSPECTION TYPE(S) STRUCTURE(S) / LOCATION(S) <br /> 2 Proprietary Anchors-Mechanical Pallet Racking Baseplate anchorage for 10 rows as noted on sheet BOD-01 <br /> Proprietary Anchors-Dowels <br /> U Other <br /> Weather Temperature(°F) Start Time End Time <br /> Overcast 35 07:00 AM <br /> DRAWINGS/ DOCUMENTS REFERENCED <br /> BOD-01, SRE 1, Structural calculations and ESR#1917 <br /> INSPECTION OBSERVATION / REMARKS <br /> Verified anchors to be Hilti KB-TZ, 1/2"x 5-1/2". Verified minimum embedment of 3-1/4". Torque was tested with calibrated wrench and was <br /> found meeting the 40 foot pound requirement. <br /> 2 Items inspected are in conformance with approved plans,specifications and jurisdictional requirements <br /> Teajalam (TJ) Gounden <br /> Loren Chandler <br /> 10/28/2019 <br /> 661A29FE-A134-4162-AB51-54FE68626814 <br />