Laserfiche WebLink
EXHIBIT C <br /> REIMBURSABLE EXPENSES <br /> Description Analysis TAT No. Rate($) Amount($) <br /> SAT Asbestos Analysis PLM 7d 50 10 500.00 <br /> SAT—Pt Count 400 PLM 10d 16 50 800.00 <br /> EMSL Lead Paint Chips FAA lad 30 10 300.00 <br /> Field Expenses and Supplies 1 300 300.00 <br /> Report—Print, Scan,Copy, Prep 2 100 200.00 <br /> Mileage—Portal to Site to Laboratory 260 0.55 88.00 <br /> Direct Cost Mark-up (15%) 2188.00 0.15 328.00 <br /> Reimbursable Contingency 500.00 <br /> $3,016.00 <br /> Key <br /> 1. TAT—Turnaround Time for Analysis <br /> 2. PLM—Polarized Light Microscopy <br /> 3. FAA—Flame Atomic Absorption <br /> Page 1 of 1 <br />