My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 2/18/2020
>
Contracts
>
6 Years Then Destroy
>
2022
>
TranTech Engineering LLC 2/18/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2020 9:52:47 AM
Creation date
2/25/2020 9:52:13 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
2/18/2020
End Date
12/31/2022
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Bridge Engineering Support
Tracking Number
0002238
Total Compensation
$47,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Deliverables <br /> • Signed hard copies of all load rating reports for each bridge will be submitted to the City <br /> for inclusion in the individual bridge files. The electronic bridge record in the <br /> Washington State Bridge Inventory will also be updated with the new load rating <br /> information. <br /> Assumptions <br /> • TranTech will work from the as-built plans and the inventory inspection report to provide <br /> the most accurate condition for the load rating calculations. Field visits will be performed <br /> with the approval of the City if questions cannot be resolved through consultation with <br /> City Bridge Inspectors or other City personnel. <br /> • Existing load rating analysis will be reviewed and utilized to the fullest extent possible. <br /> • Some existing load rating analysis may be of little or no use for the update process <br /> requiring a complete re-rating. <br /> • It is assumed that no substructure load rating will be performed. Should it be determined <br /> that this additional evaluation is necessary due to deterioration of the substructure <br /> elements,the City will be contacted for approve of the additional work. <br /> Incidental Work <br /> TranTech will review and, if necessary, correct bridge inventory and bridge file information as <br /> part of the load rating task. This work will be in accordance with the latest FHWA list of <br /> Common Data Errors. This work will be conducted as part of the process of gathering the <br /> information required to perform the load rating updates and shall be considered incidental to that <br /> work. In addition, TranTech will provide Federal Bridge Program compliance advice and <br /> guidance wherever possible. <br /> The City of Everett Engineering On-call Services Page 3 <br /> TRANTECH ENGINEERING <br />
The URL can be used to link to this page
Your browser does not support the video tag.