Laserfiche WebLink
5 INSPECTION REPORT <br /> A,�_ _12/_ G8 -D15 <br /> Date Permit: <br /> 7 Contractor: <br /> Owner: l___ Q_ , Plci,7 .. Villa. <br /> Site Address:_____WO 1t21 <br /> • •F INSPECTION REQUESTED <br /> ELECTRICAL BUILDI MECHANICAL PLUMBING <br /> ❑Temp Service ■UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork den_ ootin. ' ❑Rough In ❑Rough In <br /> ❑Slab/Conduit i2 Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ■ " • . al Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final � ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: _.CQ7)-601.0242 <br /> ►� APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ oK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> El OK FOR C.O. VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION–24 hour notice required <br /> Inspector: K. Date: 1 r 3 <br /> EIR(10/06) DATABAR,INC. <br />