My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/08/27 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/08/27 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2020 11:34:16 AM
Creation date
2/25/2020 11:31:40 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/27/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 4 <br /> PROJECT TITLE: <br /> (1) Amendment No. 2 to PSA X Briefing COUNCIL BILL# <br /> with Gray and Osborne for Proposed Action Originating Department Public Works <br /> additional project support,and Consent Contact Person Peter Berger <br /> Call for Construction Bids for Action Phone Number 425.257.8858 <br /> Lake Chaplain South Dam First Reading FOR AGENDA OF Aug 27,2014 <br /> Tunnel Decommissioning Second Reading <br /> Project. Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA db <br /> Council President Offi—) <br /> Location Preceding Action Attachments Department(s) Approval <br /> Water Filtration Plant PSA, 12/05/11,7/11/12 Amendment No. 2 (two Public Works <br /> 6133 Lake Chaplain Amend No.1 copies) signed by <br /> Road, Sultan WA 12/09/12,12/19/12 consultant <br /> Amount Budgeted $600,000 <br /> Expenditure Required $ 33,680 Account Number(s): UP-3585 <br /> Budget Remaining $525,390 <br /> Additional Required Account Number(s): UP-3585 <br /> DETAILED SUMMARY STATEMENT: <br /> Additional time and engineering services are required for Gray & Osborne, Inc. to complete the design <br /> portion of the Water Filtration Plant South Lake Chaplain Tunnel decommissioning project. Amendment#2 <br /> will provide project permitting and construction administration support and extend the professional services <br /> contract through December 31st, 2015. The current Professional Services Agreement expires December 31, <br /> 2014. Construction is scheduled to be completed in 2015. The total project budget is $600,000, design <br /> ($90,000) and construction ($510,000). This amendment is for an additional $33,680 in design costs to bring <br /> the PSA total to $74,610. <br /> Further, the decommissioning project is now ready for construction bids. This project will safely <br /> decommission the original tunnel penetrating the Lake Chaplain South Dam. <br /> RECOMMENDATION(Exact action requested of Council): Authorize the Mayor to sign Amendment No. <br /> 2 to the Professional Services Agreement with Gray and Osborne for additional project support services in <br /> the amount of$33,680.00, and Authorize Call for Construction Bids for the Lake Chaplain South Dam <br /> Tunnel Decommissioning Project. <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.