My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BHC Consultants 2/24/2020
>
Contracts
>
6 Years Then Destroy
>
2021
>
BHC Consultants 2/24/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2020 9:19:59 AM
Creation date
2/27/2020 9:19:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
BHC Consultants
Approval Date
2/24/2020
Council Approval Date
2/12/2020
End Date
12/31/2021
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Engineering Analysis Potable Water Pump Stat
Tracking Number
0002242
Total Compensation
$588,785.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett <br /> Deliverables <br /> 1. Up to five (5) hard copies and one (1) electronic copy (Adobe PDF format) of 60, and 90 <br /> Percent plans, specifications, and OPCC. Plans to be submitted as half-size prints. <br /> 2. One (1) electronic copy (Adobe PDF format) of 60 and 90 Percent Design Submittal <br /> Record of Comment. <br /> 3. Up to five (5) hard copies and one (1) electronic copy (Adobe PDF format) of Final <br /> Construction Bid Documents, stamped and signed. <br /> 4. One (1) electronic copy (Adobe PDF format) of meeting minutes, as necessary. <br /> Task 400 — Bid Assistance <br /> Objectives <br /> This effort shall assist the City during the bidding process. <br /> BHC Services <br /> 1. Up to three (3) BHC staff personnel to attend pre-bid meeting. <br /> 2. Provide technical review and responses to contractor's request for information (RFIs). <br /> 3. Submit bid documents to Builder's Exchange. <br /> 4. Assist the City in preparing addendums. <br /> 5. Assist the City with verifying bids. <br /> City of Everett Responsibilities <br /> 1. Advertise the project in the DJC and local newspaper(s). <br /> Assumptions and Meetings <br /> 1. BHC to attend pre-bid meeting. <br /> 2. BHC to attend bid opening. <br /> 3. BHC to respond up to eight (8) RFIs. <br /> 4. BHC to help prepare up to two (2) addendums. <br /> Deliverables <br /> 1. RFIs. <br /> 2. Addendum(s) as needed. <br /> Task 500 — Engineering Services During Construction <br /> Objective <br /> Support the City during construction. <br /> BHC Services <br /> 1. Up to three (3) BHC staff personnel to attend pre-construction meeting. <br /> 2. Address RFIs. Respond in writing to up to 30 RFIs. <br /> 3. Review technical submittals: Review and respond to up to 30 submittals. <br /> Scope of Services 7 [ow■ <br />
The URL can be used to link to this page
Your browser does not support the video tag.