My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1001 N BROADWAY Geotech Report 2018-01-02 MF Import
>
Address Records
>
N BROADWAY
>
1001
>
Geotech Report
>
1001 N BROADWAY Geotech Report 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:13:57 PM
Creation date
2/28/2020 9:05:44 AM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
1001
Address Document Type
Geotech Report
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.�.� .. ..t�s <br />� <br />.—vr..�..w..rnw�..vr�.eeyp�i�t' _ <br />J-736 . • <br />Page 7 <br />material. Loose FILL soils (as encout�tered in the area of <br />test pit TP-7) should also be stripped to, denser fill or natur- <br />al soils. Organically contaminated stripped, soils shou;d be <br />stockpiled.and removed from the site or orherwise wasted and <br />not reused as structural fill. <br />The mounded rubble piles present on the site are unsuitable for <br />fill and should be cleared and wasted from the site. <br />Existing concrete foundation wall, slabs, walkway or curbs, <br />aad asphaltic pavements, should be broken up and removed from <br />the site, or incorporated into structural fill. Utilizing con- <br />crete and/or asphalt fragments as structural fill materials <br />would require that each piece be no larger than 6 inch maximum`.. <br />size and that the fragments be completely surrounded by a soil <br />matrix. Utility structures located below the gzound surface <br />such as manholes, pipes and conduits should be overexcavated <br />and removed if discovared during construction. Reco�endations <br />concerning backfilling and compaction are presented in the fol- <br />lowing section "Structural Fill". <br />The valley area at the northeast end of the site will be wet <br />and will :esult in a mired and difficult working surface for <br />construction equipment. Drainage provisions should be implement- <br />ed at the earliest possible time during site preparation <br />such that the area is allowed to drain as much as possible. We <br />suggest that a series of shallow herringbone ditches be exca- <br />vated draining into a central �ditch running along the axis of <br />the valley bottom to a discharge area off the siCe. <br />After the valley area has been drained, cleared, and stripped <br />, of organic rich soils, a perme�ble granular working surface <br />should be placed over the entire surface of the lowland area <br />� (generally below elevation 75 feet) which will receive structural <br />fill. The granular material should consist of predominantly sand <br />J <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.