My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/11/12 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/11/12 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2020 10:54:59 AM
Creation date
3/3/2020 10:52:15 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/12/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET • • -• <br /> PROJECT TITLE: <br /> Award construction contract Consent COUNCIL BILL <br /> 11 <br /> and authorize the Mayor to X Action Originating Department Public Works <br /> sign the contract with Seahurst First Reading Contact Person Peter Berger <br /> Electric,Inc. for the"Water Second Reading Phone Number (425) 257-8858 <br /> Filtration Plant Programmed Third Reading FOR AGENDA OF Nov 12, 2014 <br /> Logic Controllers Replacement Public Hearing <br /> Project" Initialed by: <br /> Department Head = , <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s) <br /> Approval <br /> 6133 Lake Chaplain Summary of bid PW <br /> Road, Sultan, WA tabulations. <br /> Amount Budgeted $1,900,265.00 <br /> Expenditure Required $1,118,677.27 Account Number(s): UP 3361 • <br /> Budget Remaining $172,750.73 <br /> Additional Required $0 • <br /> DETAILED SUMMARY STATEMENT: <br /> Two project bid proposals were received for construction of the Water Filtration Plant PLC Replacement <br /> Project.The bids,which include sales tax,range from a low bid of$1;118,677.27 to a high bid of <br /> $1,364,580.00. The Engineer's estimate,including sales tax,was $1,046,461.75. The low bid proposal from <br /> Seahurst Electric, Inc. was found to meet all contract bidding requirements. <br /> Total expenditures requested to date,including this request for construction award, are $1,727,514.27. The <br /> • <br /> budget remaining is $172,750.73. <br /> FCO I t1E �DATTOi`z: <br /> _'it,'ard construction contract and authorize the Mayor to sign the contract\,-vitiet Seahurst E1 c iic.y-illc. for the <br /> Vv FP PLC Replacement Project in the amount of$i,i.18,677.2 7, including Washington State sales tax. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.