My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/11/19 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/11/19 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2020 11:15:48 AM
Creation date
3/3/2020 11:12:45 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/19/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET .1 3 <br /> PROJECT TITLE: <br /> Award construction contract Consent COUNCIL BILL# <br /> and authorize the Mayor to X Action Originating Department Public Works <br /> sign the contract with Seahurst First Reading Contact Person Peter Berger <br /> Electric,Inc. for the"Water Second Reading Phone Number (425)257-8858 <br /> Filtration Plant Programmed Third Reading FOR AGENDA OF Nov 12, 2014 <br /> Logic Controllers Replacement Public Hearing <br /> Project" Initialed by: <br /> Department Head = ' <br /> CAA • ' > <br /> Council President <br /> Location Preceding Action Attachments Department(s) <br /> Approval <br /> 6133 Lake Chaplain Summary of bid PW <br /> Road, Sultan,WA tabulations. <br /> Amount Budgeted $1,900,265.00 <br /> Expenditure Required $1,118,677.27 Account Number(s):UP 3361 <br /> Budget Remaining $172,750.73 <br /> • <br /> Additional Required $0 <br /> DETAILED SUMMARY STATEMENT: <br /> Two project bid proposals were received for construction of the Water Filtration Plant PLC Replacement <br /> Project.The bids,which include sales tax, range from a low bid of$1,118,677.27 to a high bid of <br /> $1,364,580.00. The Engineer's estimate, including salesatax,was $1,046,461.75.The low bid proposal from <br /> Seahurst Electric, Inc. was found to meet all contract bidding requirements. <br /> Total expenditures requested to date, including this request for construction award,are $1,727,514.27. The <br /> budget remaining is $172,750.73. <br /> • <br /> RECOMMENDATION: <br /> Award construction contract and authorize the Mayor to sign the contract with Seahurst Electric, Inc. for the <br /> WFP PLC Replacement Project in the amount of$1,118,677.27, including Washington State sales tax. <br /> 41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.