My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1121 SE EVERETT MALL WAY EVERETT POLICE DEPT SOUTH PRECINCT 2020-03-06
>
Address Records
>
SE EVERETT MALL WAY
>
1121
>
EVERETT POLICE DEPT SOUTH PRECINCT
>
1121 SE EVERETT MALL WAY EVERETT POLICE DEPT SOUTH PRECINCT 2020-03-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2020 9:13:31 AM
Creation date
3/6/2020 9:13:19 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1121
Tenant Name
EVERETT POLICE DEPT SOUTH PRECINCT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 17,2019 <br /> EVERETT Mr.Tony Lee <br /> City of Everett <br /> WASHINGTON Public Works Department <br /> 3200 Cedar Street <br /> Everett,WA 98201 <br /> RE: South Precinct—Roof Replacement Project—Roof Insulation <br /> Dear Mr. Lee, <br /> Drawings and specifications are currently being prepared for the South Precinct Roof iI <br /> Replacement Project. I have been working with Adam Clark of 2812 Architecture and <br /> William Clark of Sarnafil on this project. We have been trying to increase the thickness <br /> of the roof insulation, but,after a site meeting this morning it became clear that we will <br /> not be able to achieve that goal. <br /> The reason we need to maintain the existing 2"thick roof insulation is as follows: <br /> 1. Snohomish County 911 occupies the second floor and the Police Department <br /> occupies the first floor. Both are 24 hour,seven days a week operations. Disruption <br /> to Snohomish County 911 operations is not an option. <br /> 2. Natural gas lines and electrical power to the HVAC Units are hard plumbed and run <br /> on top of the roof. These items can't be raised without taking the HVAC Units out of <br /> service for hours and possibly days. <br /> 3. The communication lines that run from the Snohomish County 911 to the antenna <br /> tower are heavy and can only be raised a small amount. <br /> 4. A new parapet wall would need to be constructed at the perimeter to cover the <br /> edge of the new insulation. Securing the parapet to the wall with roto hammering <br /> and bolts would not be an option. <br /> 5. The existing roof drains are located away from the roof edge with no overflow <br /> drains. The existing overflow system is the low perimeter edge. Adding insulation <br /> will negate the existing overflow system. <br /> 6. Insulating the underside of the roof is not an option due to disruptions it would <br /> create to Snohomish County 911 operations. <br /> Given the current set of circumstances it is not feasible to provide more than the <br /> existing 2"of roof insulation. Should Snohomish County 911 relocate in the future,and <br /> the second floor became unoccupied,that would be the ideal time to reconsider the <br /> Facilities Administration insulation package for the second floor and roof. Additional insulation would become a <br /> Q2730 Wetmore Ave,Ste.9E code requirement of the second floor tenant improvements. <br /> Everett,WA 98201 <br /> Based on the above I am requesting your approval to submit 2"thick roof insulation for <br /> © <br /> 425.257.6290 the South Precinct—Roof Replacement Project. <br /> 425.257.6299 fax <br /> everettwa.gov Respectfully, <br /> ' : everettwa.gov ��S ...A' ---- - Apr, .76,02a <br /> Chris Lark APPR ED-PERMIT SERVICES <br /> Project Manager C <br /> Facilities Administration <br />
The URL can be used to link to this page
Your browser does not support the video tag.