|
i'
<br /> 11
<br /> ,
<br /> 2015 Washington SIAM Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1
<br /> Mechanical Summary MECH-SUM
<br /> 2015 Washington State Energy Code Com.liance Forms for Commercial Buildings including R2&R3 over 3 stories and all R1 Revised January 2017
<br /> Project Information Project Title: Car Toys Everett,WA RTU replacement naf9/23/2019
<br /> For Building pept.Use
<br /> Applicant Information. Provide contact information for individual who can respond to
<br /> ingerne3 about compliance form information providcd.
<br /> Company Name: Total System Services
<br /> Company Address: 8227 44th Ave W Suite G Mukilteo,WA 98275
<br /> Applicant Name: Jason Schlund
<br /> Applicant Phone: 360-310-0443 I 1
<br /> Project Description , 1
<br /> l p j` ; ��'it l II u I I ', ' :1,'
<br /> ❑New Building ['Building Addition ❑Tenant Improvement ysl' rit I 9ii, 1 ( No Sys
<br /> Briefly describe mechanical systems I
<br /> the text box provided Remove existing indoor located outdoor package heat pump, and re ce,wlty Ir�syste�n heat I' I,
<br /> include 14seer outdoor heat pump unit installed on a pad on pavem t behind riding, indoor f; " '
<br /> ❑Total Bldg Performance(TBP) 15KW auxiliary heat, refrigerant lines and control wiring between coil and condensing unit,sheet
<br /> This path includes all mandatory ductwork connecting existing return and supply air to new fan coil, air filter rack,'electrical discor
<br /> provisions per Option 2. indoor and outdoor unit locations, and a new programable thermostat. Upon completion of insta
<br /> MECH-SUM,MECMECH-CHK,and C407
<br /> E er A�inal i fo ms a fired. technician will verify electricians work is completed, will start up unit,test, and Verify proper ope
<br /> Design Load Calculations1
<br /> ❑ Load calculation summary E MECH-LOAD-CALC Form
<br /> Provide design load calculationsior all mechanir,al systems and equipment serving the building heating, C
<br /> ventilating needs.If a load calculation summary is provided with the permit documents that includes all ap
<br /> Mechanical Schedules compliance information then the MECH-LOAD-CALC form is not required.
<br /> 0 Mechanical Plana ❑ MCCI I EQ Forma(TBD)
<br /> Indicate location of equipment compliance information. If provided on plans then MECH-EQ forms are not
<br /> however,include on plans all applicable compliance information listed in MECH-EQ tables.
<br /> ❑ DOAS is required per C403.6 effective July 1,2017(office,retail,education,library and fire station oc
<br /> Dedicated Outdoor Air i
<br /> System Requirements and All occupied,conditioned areas shall be served by a DOAS that delivers required ventilation air in a mann
<br /> 3' cI not require space conditioning fan operation. Space conditioning fans cycled off when ij o heating or coolir
<br /> High Efficiency VAV
<br /> ❑ Ventilation provided via natural ventilation per 2015 IMC in lieu of DOAS(C403;61 Exception 1)
<br /> Alternate
<br /> ❑ Ventilation and space conditioning provided by a HEVAV system I er C403.7 it `eu of DOAS(C4C
<br /> 2) I ' II
<br /> ❑ DOAS included in project,although not required(occupancy not office' etail,edija �:I�'library or fire s
<br /> ❑ DOAS related allowances included in project. lj i l II i
<br /> I'j, I11 1 7-,I II ' I I,,
<br /> ❑ Prescriptive vertical fenestration maximum area allowance increa ed to 40%pe' 402.4.1.4 with II
<br /> conditioned floor area in building served by DOAS. 1 d
<br /> Fan Power ❑ Exception to air economizer per C403.3 Exception 1, include MECH-ECONO form.
<br /> 0 Projact includes HVAr air distribution systems that provide heating endror cooling '
<br /> I
<br /> If yes,provide a MECH-FANSYS-SUM form.
<br /> HVAC Hydronic Systems '
<br /> ❑ For one or more systems,the total fan motor nameplate hp of all fans in HVAC system exceeds 5hp.
<br /> If yes,provide a seperate MECH-FANSYS form for each HVAC system exceeding the 5 horsepower
<br /> Refer to Section C403.2.11 and MECH-FANSYS-DOC for requirements and exceptions.
<br /> ❑ Hydronic chilled water ❑ Water-loop heat pump Q No hydroni
<br /> C406 Additional Efficiency ❑ Hydronic heating water ❑ Geothermal
<br /> Options-Mechanical
<br /> ❑ C406.2 More efficient HVAC equipment and fan systems
<br /> Requires 90%of heating and cooling capacity to be equipment listed in tables C403.2.3(1)-(9)or air-tc
<br /> pumps and heat recovery chillers.All equipment listed in tables C403.2.3(1)-(7)must be 15%more eft
<br /> minimum requirements.All stand alone supply, return,and exhaust fans over 1hp must have FEQ>_7'
<br /> selec ed within 10°. of maximum total or static.ressure rj
<br /> Mechanical Summary, I21; MECH-SUMII
<br /> 7-.I1!'!. •. , ! :.e/l. a� �.V� .�- r N- Y-!'. .t, •
<br /> .1.' .- 'I .1--14.1--
<br /> ;-Ir- 7..1=
<br /> .!I .
<br /> 2015 Washington State Energy Code Compliance Forms fo . u .i 1. ': r s. . Ora -4, -. _ ..a +`
<br /> rnenner f n,:r.,ec r,r non,lir- onorn...,.,.lir;.,,,,,,.r on n anon.,.
<br /> IJ,
<br /> li I 1111 11 I
<br /> j '" l '1 I l l!I I I 11
<br /> I ,, l
<br /> III
<br />
|