My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
410 SW EVERETT MALL WAY 2020-03-06
>
Address Records
>
SW EVERETT MALL WAY
>
410
>
410 SW EVERETT MALL WAY 2020-03-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2020 9:37:06 AM
Creation date
3/6/2020 9:35:01 AM
Metadata
Fields
Template:
Address Document
Street Name
SW EVERETT MALL WAY
Street Number
410
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2015 Washington State 1 - 'Code Compliance Forms for Commercial,R2 and R3 ov�i-ltories and all R1-Page 7 of 7 <br /> Mechanical Permit Plans Checklist MECH-CHK <br /> 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2&R3 over 3 stories and all R1 Revised January 2017 <br /> Project Title: Car Toys Everett,WA RTU replacement Date 9/23/2019 <br /> The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the <br /> Washington State Energy Code,Commercial Provisions. p <br /> Applicable Code Section Code Provision Information Required-Must be in permit documents Location in (Building Notes Department <br /> (yes,no,na) Documents 1 Notes <br /> Indicate that all mechanical systems,equipment,and controls for which the WSEC requires ' <br /> NA control functions and /or configuration to perform specific functions are required to be <br /> commissioned; <br /> Scope of mechanicalL I ' I I <br /> C408.2 systems commissioning For buildings with 5 240,000 Btu/h total output cooling capacity or 300,000 Btu/h total outpu p I li 1 . <br /> NA heating capacity,indicate that all mechanical systems regardless of individual capacity are 1 1 1 <br /> required to be commissioned;or provide building heating/cooling capacity calculation <br /> demonstrating eligibility for exception pal 4 .1 I l�. I <br /> NA Indicate in plans and specifications that Cx per C408 is required for all applicable mechanical: I . <br /> systems; <br /> C403.2.10 Include general summary with at a minimum of Items 1 thru 4 of the Cx plan per C408.1.2 f <br /> NA C408.1.1 Commissioning including:narrative description of activities,responsibilities of the Cx team,schedule of <br /> C408.1.2 requirements in construction activities including verification of project close out documentation per C103.6,and conflict of <br /> C408.1.4.2 documents interest plan(if required); <br /> C103.6 Include in general summary that a Cx project report or Compliance Checklist(Figure I <br /> NA C408.1.4.2)shall be completed by the Certified Cx Professional and provided to the owner 1 <br /> prior to the final mechanical inspection. <br /> Air system and hydronic Indicate in plans that air and fluid flow rates shall be tested and balanced within the tolerances <br /> NA C408.2.2 system balancing defined in the specifications;indicate systems shall be balanced in a manner to first minimize <br /> throttling losses,then adjusted to meet design flow conditions <br /> NA C408.2.2.1 Air system balancing Indicate devices that provide the capability to balance all supply air outlets,zone terminals and <br /> devices air handling equipment requiring system balancing <br /> NA C408.2.2.2 Hydronic system balancing Indicate devices that provide the capability to isolate,balance and measure flow across all <br /> devices hydronic equipment requiring system balancing including heating and cooling coils and pumps <br /> NA C408.2.3 Functional performance Identify in plans and specifications the intended operation of all equipment and controls during <br /> testing criteria all modes of operation,including interfacing between new and existing-to-remain systems <br /> Project Close Out Documentation <br /> Documentation and project Indicate in plans that project close out documentation and training of building operations I; <br /> NA C 103.6 close out submittal personnel is required for all mechanical components,equipment and systems governed by <br /> requirements this code;indicate close out documentation shall include:record documents,O&M manuals, <br /> applicable WSEC compliance forms and calculations <br /> l lIl I l'H'tH <br /> l <br /> r 'II i 4 -� , <br /> • <br /> rr �' <br /> III'i ' i'!Ili:. !i, li <br /> 1 , <br /> iiia. <br /> IF SII Iii; ! I'. <br /> 1 li Ilii <br /> 1 <br /> • Iu II <br /> it i'� ,il, ll 7 <br /> j li ll' <br /> , <br /> ii Ill <br /> I':iir , <br />
The URL can be used to link to this page
Your browser does not support the video tag.