2015 Washington State Er =ode Compliance Forms for Commercial,R2 and R3 over—ies and all R1 -Page 2 of 2
<br /> NA C404.10 Drain water heat recovery For systems incorporating drain water ER,indicate system design complies with CSA B55.2
<br /> units (or CSA 55.1 for Group R);indicate potable waterside pressure loss at design flow is<10 psi i
<br /> Service Water Heating Energy Use Metering
<br /> NA C404.9 SWH energy usage in For Group R-2 multi-family buildings with central SWH systems,provide metering of hot water I'
<br /> dwelling units energy usage per dwelling unit;indicate metering and data reporting method
<br /> SWH equipment energy use For new buildings>50,000 sf and building additions>25,000 sf,with total SWH equipment
<br /> NA C409.3.2 metering capacity 5 50 kW(a 170,600 Btu/h),verfiy energy use metering of all SWH equipment will be •
<br /> provided per C409 I, i
<br /> Additional Efficiency Package Option,Reduced Energy Use In Service Water Heating-Must comply with both provisions to be eligik'k+ I,i . iI I II 1! '
<br /> NA ITo comply with additional efficiency package option,verify that z 90%of the conditioned floor i,.
<br /> C406.7.1 Eligible building type area of the building is one or more of the occupancies identified in this section,OR;
<br /> 1 , 1'
<br /> NA Provide whole building energy analysis per C407 that demonstrates the SWH load in the , it i t�'
<br /> building is a 10%of total building energy loads ,l ,
<br /> To comply with additional efficiency package option,provide documentation that verifies 1 j,
<br /> NA >_60%of building annual SWH energy is provided by high efficiency sources(heat pump water
<br /> heater with COP a 3,waste heat recovery,solar water-heating system); _
<br /> C406.7.2 Load fraction
<br /> C403.5.4 For buildings with 24-hour operation and with>1,500,000 Btu/h of heat rejection capacity and
<br /> design service hot water load>250,000 Btu/h(per C403.5.4);provide documentation that
<br /> •NA verifies 5 100%of building annual SWH energy is provided by condenser energy recovery or' I �,
<br /> other high efficiency source ,I
<br /> Documentation and Specific System Requirements to Supporting Commissioning .
<br /> NA Indicate that all SWH equipment and controls for which the WSEC requires control functions
<br /> Scope of service water and/or configuration to perform specific functions are required to be commissioned+D7
<br /> C408.4 heating systems — - -
<br /> commissioning For buildings where the largest SWH system has?200,000 Btu/h total output capacity,
<br /> NA indicate that all SWH systems regardless of individual capacity are required to be
<br /> commissioned.
<br /> NA Indicate that all pool and permanent spa water heating systems regardless of individual
<br /> Scope of pool and capacity are required to be commissioned;
<br /> NA C408.4.1.3 permanent spa systems Indicate that energy recovery equipment that heats pool water regardless of capacity is
<br /> commissioning required to be commissioned; I!1.
<br /> NA Identify all pool heating and energy recovery equipment and controls that the WSEC defines I,I,,� '
<br /> as being capable of and/or configured to perform specific functions.
<br /> NA Indicate in plans and specifications that Cx per C408 is required for all applicable service water .II'i i i,;, I II,
<br /> heating systems; : 1,
<br /> C404.13 Include general summary with at a minimum of Items 1 thru 4 of the Cx plan per C408.1.2 i;i ;
<br /> NA C408.1.1 Commissioning including:narrative description of activites,responsibilities of the Cx team,schedule of I
<br /> C408.1.2 requirements in construction activities including verification of project close out documentation per C103.6,and conflict of
<br /> C408.1.4.2 documents interest plan(if required);
<br /> I,' d
<br /> C103.6 Include in general summary that a Cx project report or Compliance Checklist(Figure . II I , III! I;
<br /> NA C408.1.4.2)shall be completed by the Certified Cx Professional and provided to the owner � El 11' I •
<br /> prior to the final mechanical inspection. .'I
<br /> NA C408.4.1 Functional performance Identify in plans and specifications the intended operation of all equipment and controls during III' in. i '
<br /> testingcriteriaexisting-to-remainsystems
<br /> all modes of operation,including interfacing between new and
<br /> Project Close Out Documentation
<br /> Documentation and project Indicate in plans that project close out documentation and training of building operations
<br /> NA C103.6 close out submittal personnel is required for all SWH components,equipment and systems govemed by this
<br /> requirements code;indicate close out documentation shall include:record documents,O&M manuals,
<br /> applicable WSEC compliance forms and calculations ,
<br /> •
<br /> I,
<br /> Ali I LIi I 1
<br /> Iiilb