Laserfiche WebLink
2015 Washington State Er =ode Compliance Forms for Commercial,R2 and R3 over—ies and all R1 -Page 2 of 2 <br /> NA C404.10 Drain water heat recovery For systems incorporating drain water ER,indicate system design complies with CSA B55.2 <br /> units (or CSA 55.1 for Group R);indicate potable waterside pressure loss at design flow is<10 psi i <br /> Service Water Heating Energy Use Metering <br /> NA C404.9 SWH energy usage in For Group R-2 multi-family buildings with central SWH systems,provide metering of hot water I' <br /> dwelling units energy usage per dwelling unit;indicate metering and data reporting method <br /> SWH equipment energy use For new buildings>50,000 sf and building additions>25,000 sf,with total SWH equipment <br /> NA C409.3.2 metering capacity 5 50 kW(a 170,600 Btu/h),verfiy energy use metering of all SWH equipment will be • <br /> provided per C409 I, i <br /> Additional Efficiency Package Option,Reduced Energy Use In Service Water Heating-Must comply with both provisions to be eligik'k+ I,i . iI I II 1! ' <br /> NA ITo comply with additional efficiency package option,verify that z 90%of the conditioned floor i,. <br /> C406.7.1 Eligible building type area of the building is one or more of the occupancies identified in this section,OR; <br /> 1 , 1' <br /> NA Provide whole building energy analysis per C407 that demonstrates the SWH load in the , it i t�' <br /> building is a 10%of total building energy loads ,l , <br /> To comply with additional efficiency package option,provide documentation that verifies 1 j, <br /> NA >_60%of building annual SWH energy is provided by high efficiency sources(heat pump water <br /> heater with COP a 3,waste heat recovery,solar water-heating system); _ <br /> C406.7.2 Load fraction <br /> C403.5.4 For buildings with 24-hour operation and with>1,500,000 Btu/h of heat rejection capacity and <br /> design service hot water load>250,000 Btu/h(per C403.5.4);provide documentation that <br /> •NA verifies 5 100%of building annual SWH energy is provided by condenser energy recovery or' I �, <br /> other high efficiency source ,I <br /> Documentation and Specific System Requirements to Supporting Commissioning . <br /> NA Indicate that all SWH equipment and controls for which the WSEC requires control functions <br /> Scope of service water and/or configuration to perform specific functions are required to be commissioned+D7 <br /> C408.4 heating systems — - - <br /> commissioning For buildings where the largest SWH system has?200,000 Btu/h total output capacity, <br /> NA indicate that all SWH systems regardless of individual capacity are required to be <br /> commissioned. <br /> NA Indicate that all pool and permanent spa water heating systems regardless of individual <br /> Scope of pool and capacity are required to be commissioned; <br /> NA C408.4.1.3 permanent spa systems Indicate that energy recovery equipment that heats pool water regardless of capacity is <br /> commissioning required to be commissioned; I!1. <br /> NA Identify all pool heating and energy recovery equipment and controls that the WSEC defines I,I,,� ' <br /> as being capable of and/or configured to perform specific functions. <br /> NA Indicate in plans and specifications that Cx per C408 is required for all applicable service water .II'i i i,;, I II, <br /> heating systems; : 1, <br /> C404.13 Include general summary with at a minimum of Items 1 thru 4 of the Cx plan per C408.1.2 i;i ; <br /> NA C408.1.1 Commissioning including:narrative description of activites,responsibilities of the Cx team,schedule of I <br /> C408.1.2 requirements in construction activities including verification of project close out documentation per C103.6,and conflict of <br /> C408.1.4.2 documents interest plan(if required); <br /> I,' d <br /> C103.6 Include in general summary that a Cx project report or Compliance Checklist(Figure . II I , III! I; <br /> NA C408.1.4.2)shall be completed by the Certified Cx Professional and provided to the owner � El 11' I • <br /> prior to the final mechanical inspection. .'I <br /> NA C408.4.1 Functional performance Identify in plans and specifications the intended operation of all equipment and controls during III' in. i ' <br /> testingcriteriaexisting-to-remainsystems <br /> all modes of operation,including interfacing between new and <br /> Project Close Out Documentation <br /> Documentation and project Indicate in plans that project close out documentation and training of building operations <br /> NA C103.6 close out submittal personnel is required for all SWH components,equipment and systems govemed by this <br /> requirements code;indicate close out documentation shall include:record documents,O&M manuals, <br /> applicable WSEC compliance forms and calculations , <br /> • <br /> I, <br /> Ali I LIi I 1 <br /> Iiilb <br />