Laserfiche WebLink
1 2 3 4 5 6 <br /> AB�REVIATIONS �ENERAL NOTES - MECHANICAL SHEET METAL NOTES NON-S`TRUCl'URAL MECHANICAL CONlPONENT NOTES <br /> Q� DIAMETER, PHASE F FAHRENHEIT, FIRE MAIN PIPING NA NOT APPLICABLE s <br /> FC FLUID COOLER NC NORMALLY CLOSED, NOISE CRITERIA 1. COORDINATE MECHANICAL WORK WITH THAT OF OTHER 1. VOLUME DAMPERS: PROVIDE A MANUAL VOLUME DAMPER 1. THE COMPONENT IMPORTANCE FACTOR (Ip} FOR ALL <br /> A AIR, AMPS �CO �LOOR CLEANOUT NIC NOT IN CONTRACT TRADES (ELECTRICAL, ARCHITECTURAL, STRUCTURAL). FOR EACH SUPPLY, RETURN, AND EXHAUST OPENWG, NON-STRUCTURAL COMPONENTS SHALL BE: s . . p <br /> AAV AUTOMATIC AIR VENT FCU FAN COIL UNIT NO NORMALLY OPEN, NITROUS OXIDE REFER TO ELECTRICAL, ARCHITECTURAL, STRUCTURAL LOCATED AS FAR UPSTREAM AS POSSIBLE FROM THE <br /> FIRE DAMPER, FLOOR DRAIN, DRY SPRINKLER DRAWINGS AND SPECIFICATIONS. COORDINATION SHALL OPENING. PROVIDE A MANUAL VOLUME DAMPER FOR Ip = 1.0 <br /> A�V A�OVE Fp NO. NUMBER OCCUR PRIOR TO FABRICATION, PURCHASE, AND/OR BRANCH MAINS SERVING MORE THAN ONE OPENWG. <br /> AC AIR CONDITIONER ROUTING NP NON POTABLE INSTALLATION OF ALL WORK. 2. THE FOLLOWING ITEMS ARE TAKEN DIRECTLY FROM THE _ <br /> ACU AIR CONDITIONlNG UNIT FDC �IRE DEPARTMENT CONNECTION NPC NON POTABLE COLD WATER PIPING 2. BACKDRAFT DAMPERS: PROVIDE ADJACENT TO LOUVERS 2015 WTERNATIONAL BUILDING CODE AND FROM THE � - - • <br /> � . .. � • o <br /> AD ACC�SS DOOR FF FOULING FACTOR, FLAT FILTER NPH NON POTABLE HOT WATER PIPING 2. COORDINATE PLUMBING AND HVAC SYSTEIUIS ROUTING UNLESS MOTOR OPERATED DAMPERS PROVIDED. AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE) <br /> FFD FUNNEL FLOOR DRAW PRIOR TO INSTALLATION. DURWG LAYOUT STANDARD 7-05. THE CONTRACTOR SHALL REFER TO THE <br /> E ADA AMERICANS WITH DISABILITIES ACT NTS NOT TO SCALE ABOVE FOR ADDITIONAL INFORMATION, EXCEPTIONS, AND E <br /> AF AIRFOIL FLA FULL LOAD AMPS COORDINATION, DUCTWORK TAKES PRECEDENCE OVER 3. ACCESS DOORS: PROVIDE AT DUCT SMOKE DETECTORS, <br /> A��' A�OVE FINISHED FLOOR FLEX FLEXIBLE 02 OXYGEN PLUMBING SYSTEMS. BACKDRAFT DAMPERS, MOTOR OPERATED DAMPERS, FURTHER DESCRIPTIONS. THE CONTRACTOR SHALL �� > >��� � �� hF . � <br /> FLR FLOOR BOTH SIDES OF DUCT MOUNTED COILS, AND PLENUMS. ADHERE TO REQUIREMENTS AND AS SUCH, SHALL BE -� - - - <br /> AFS AIRFLOW MEASURING STATION OA OUTDOOR AIR 3. UNLESS OTHERWISE SPECIFIED, THE GENERAL INCLUDED WITHIN BID. ALSO REFER TO SPECIFICATION <br /> AFUE ANNUAL FUEI� UTILI�ATION EFFICIENCY FLTR FILTER OBD OPPOSED BLADE DAMPER CONTRACTOR (GC) SHALL BE RESPONSIBLE FOR PAINTING, 4. UNLESS NOTED TO USE LARGER SIZE DUCT, PROVIDE THE SECTION 230550. <br /> AG ABOVE GROUND FMS FLOW MEASUREMENT STATION (HVAC, PLUMBING) OC ON CENTER CUTTING, AND PATCHING OF EXISTWG FLOORS, WALLS, FOLLOWING MINIMUM SIZE BRANCH DUCTS TO CEILWG <br /> FOR FUEL OIL RETURN PIPWG AND PARTITIONS W THE EXISTING BUILDING. DIFFUSERS. 3. 2015 IBC, 1613.1, SCOPE: ARCHITECTURAL, MECHANICAL, <br /> AHJ AUTHORITY HAVING JURISDICTION FOS FUEL OIL SUPPLY PIPING OD OUTSIDE DIMENSION OR DIAMETER ELECTRICAL, AND NON-STRUCTURAL COMPONENTS THAT I"°I I� R C7 I S <br /> AHU AIR HANDLING UNIT ORD OVERFLOW ROOF DRAIN <br /> AL ACOUSTIC LINED (DUCT) FOT FUEL OIL TANK ORL OVERFLOW RAIN LEADER 4. REFER TO STRUCTURAL DRAWINGS FOR ALLOWABLE 6" DIA. FOR UP TO 120 CFM ARE PERMANENTLY ATTACHED TO STRUCTURES AND <br /> FP FIRE PUMP, FLOATING POINT CONTROL METHODS/LOADS FOR HANGING PIPING/DUCTS FROM 8" DIA. FOR 121-210 CFM THEIR SUPPORTS AND ATTACHMENTS SHALL BE DESIGNED mechanical 1201 third avenue,suite 600 <br /> AMB AMBIENT OSA OUTDOOR SUPPLY AIR �� elecirical seattle,washington 9s1o1 <br /> FPM FEET PER MINUTE STRUCTURAL MEMBERS. 10 DIA. FOR 211-300 CFM AND CONSTRUCTED TO RESIST THE EFFECTS OF telecommunicatians <br /> AP ACCESS PANEL OSD OVER-FLOW STORM DRAIN 12" DIA. FOR 301-450 CFM EARTHQUAKE MOTIONS IN ACCORDANCE WITH ASCE 7-05, security } z06.�48.3376 vy hargis.biz <br /> APD AIR PRESSURE DROP FPS FEET PER SECOND OV OUTLET VELOGTY 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFE 14" DIA. FOR 451-600 CFM EXCLUDING CHAPTER 14 AND APPENDIX 11A. energy <br /> ARCH ARCHIT�CT FPVC APPROVED PVC FIRE SPRWKLER ROUTING KEEPING OF HIS OWN PROPERTY ON THE JOB SITE. 16" DIA. FOR 601-820 CFM <br /> AMERICAN SOCIETY OF HEATING, REFRIGERATION FS FLOOR SINK P PUMP, PRESSURE, PLUMBING FIXTURE OWNER ASSUMES NO RESPONSIBILITY FOR PROTECTION 4. 2015 IBC, 1704.4 CONTRACTOR RESPONSIBILITY: THE � <br /> ASHRAE AND AIR-CONDITIONING ENGINEERS, INC. F/S FIRE/SMOKE DAMPER OF PROPERTIES AGAINST FIRE, THEFT, AND 5. PROVIDE 12° LONG, '/2' WIDE FLUORESCENT ORANGE TAPE CONTRACTOR SHALL BE RESPONSBLE FOR THE <br /> PD PRESSURE DROP, PUMPED DRAIN ENVIRONMENTAL CONDITIONS. AT CONCEALED VOLUME DAMPER LOCATIONS. CONSTRUCTION OF A SEISMIGFORCE-RESISTING SYSTEM, <br /> ASSY ASSEMBLY FT FEET, FIN TUBE PH PHASE DESIGNATED SEISMIC SYSTEM, OR SEIS�AIC-RESISTING <br /> ATM ATMOSPHERE FTD FOOTING DRAW PIV POST INDICATOR VALVE <br /> COMPONENT LISTED IN THE STATEMENT OF SPECIAL � <br /> AV ACID RESISTANT VENT FTG FOOTWG DRAIN PLD PLANTER DRAIN INSPECTIONS AND SHALL SUBMIT A WRITTEN STATEMENT � ry�p <br /> FTU FIN TUBE UNIT � f- � <br /> AW ACID RESISTANT WASTE POC POINT OF CONNECTION OF RESPONSIBILITY TO THE BUILDING OFFICIAL AND THE <br /> FV FAC�VELOCITY PR CONDENSATE PUMP RETURN OWNER PRIOR TO THE COMMENCEMENT OF WORK ON THE �; 8�.�'�,� <br /> B BOILER FW FILTERED WATER PIPING MECHI�NICAL EQ�IIPMENI� INSTALLAT�I�N NO�TES ENEf�C7Y CObE NO`�ES SYSTEM OR COMPONENT. THE CONTRACTOR'S �� <br /> PRV PRESSURE REDUCING VALVE STATEMENT OF RESPONSIBILITY SHALL INCLUDE THE "�'.� � <br /> BC BLOWER COIL PSIG POUNDS PER SQUARE INCH GAGE �'�' , t�l <br /> BDD BACK DRAFT DAMPER G GAS FOLLOWING: p� <br /> QTY QUANTITY 1. ACCESS CLEARANCES FOR MAINTENANCE AND <br /> BF BELOW FLOOR GA GAGE 1. MOTORS: COMPLY WITH MINIMUM FULL LOAD � '�' �` <br /> BHP BRAKE HORSE POWER GAL GALLONS REPLACEMENT: VERIFY PHYSICAL DIMENSIONS OF EFFICIENCIES LISTED IN ENERGY CODE ENFORCED BY AHJ. A. ACKNOWLEDGEMENT OF AWARENESS OF THE � <br /> GALV GALVANIZED EQUIPMENT TO ENSURE THAT ACCESS CLEARANCES CAN SPECIAL REQUIREMENTS CONTAWED IN THE ��� � <br /> BLW BELOW RA RETURN AIR, RELIEF AIR BE MET. COORDINATE LOCATIONS OF MECHANICAL WORK STATEMENT OF SPECIAL INSPECTIONS; �'►A� : <br /> BOD BOTTOM OF DUCT GAHU GAS AIR HANDLING UNIT 2. PIPWG AND DUCT INSULATION: COMPLY WITH <br /> RD ROOF DRAIN AND WORK OF OTHER TRADES TO PROVIDE ACCESS THICKNESSES AND TYPES USTED IN ENERGY CODE ��f��� <br /> BOP BOTTOM OF PIPE GC GAS COCK, GENERAL CONTRACTOR CLEARANCES FOR SERVICE AND MAINTENANCE. B. ACKNOWLEDGEMENT THAT CONTROL WILL BE <br /> REG REGISTER ENFORCED BY AHJ UNLESS MORE STRINGENT EXERCISED TO OBTAIN CONFORMANCE WITH THE <br /> p BOT BOTTOM GFU GAS FIRED UNIT REF REFERENCE, RETURN/EXHAUST FAN REQUIREMENTS ARE SPECIFIED. `� �' � D <br /> BTUH BRITISH THERMAL UNIT PER HOUR GPF GALLONS PER FLUSH RF RELIEF FAN CONSTRUCTION DOCUMENTS APPROVED BY THE <br /> GPH GALLONS PER HOUR 3. DUCT SEALING: SEAL DUCT TRANSVERSE JOINTS AND BUILDING OFFICIAL; <br /> BV BALL VALVE RG RETURN GRILLE Ev�r�tt H ig h �cho�l <br /> GI'M GALLONS PER MI�IUTE LONGITUDINAL SEAMS PER ENERGY CODE ENFORCED BY <br /> RH ROOF HOOD PIPING NO1�ES AHJ UNLESS MORE STRINGENT REQUIREMENTS ARE C. PROCEDURES FOR EXERCISING CONTROL WITHIN THE <br /> C CONDENSATE PIPING GPRV GAS PRESSURE REGULATING VALVE RI&C ROUGH IN AND CONNECT CONTRACTOR'S ORGANIZATION, THE METHOD AND • <br /> CA AIR COMPRESSOR GRD GRILLES, REGISTERS, AND DIFFUSERS SPEGFIED. �+ <br /> RL RAIN LEADER FREQUENCY OF REPORTING AND THE DISTRIBUTION VO�✓��IOI1� l.I I I I1� <br /> CAP CAPACITY GV GATE VALVE, GLOBE VALVE RLA RATED LOAD AMPS OF THE REPORTS; <br /> CBV CIRCUIT SETTING BALANCING VALVE GW GREASE WASTE PIPING 1. DISASSEMBLY PROVISIONS: PROVIDE UNIONS OR 4. RECORD DRAWINGS: SUBMIT TO THE BUILDING OWNER ��d I��I ��ll IW�y� - <br /> RO REVERSE OSMOSIS FLANGES AT PIPING CONNECTIONS TO EQUIPMENT, COILS, PER ENERGY CODE ENFORCED BY THE LOCAL AHJ. D. IDENTIFICATION AND QUALIFICATIONS OF THE <br /> CC COOLING COIL GWB GYPSUM WALLBOARD RPBA REDUCED PRESSURE BACKFLOW ASSEMBLY TRAPS, CONTROL VALVES, AND OTHER COMPONENTS TO PERSON(S) EXERCISING SUCH CONTROL AND THEIR {� <br /> CD CEILING DIFFUSER, CONDENSATE DRAIN RPBP REDUCED PRESSURE BACKFLOW PREVENTER ALLOW DISASSEMBLY FOR MAINTENANCE. 5. OPERATION AND MAINTENANCE MANUALS: SUBMIT TO THE POSITION(S) IN THE ORGANIZATION. �r�,���✓6 <br /> CFG CEILING FIRE DAMf'ER H HUMIDISTAT, HEIGHT RPM REVOLUTIONS PER MINUTE BUILDING OWNER PER ENERGY CODE ENFORCED BY THE <br /> CFM CUBIC FEET PER MINUTE HB HOSE BIBB 2. PROVIDE 12" LONG, �/z" WIDE FLUORESCENT ORANGE TAPE LOCAL AHJ. 4. DIVISION 21, 22, 23 RESPONSIBILITIES: �Ot� <br /> RTU ROOFTOP UNIT <br /> CG CEILING GRILLE HC HEATING COIL RV SAFETY RELIEF VALVE AT CONCEALED VALVE LOCATIONS. <br /> CH CABINET HEATER, CHILLER HD HEAD, HUB DRAIN 6. SYSTEM BALANCING: BALANCE HVAC SYSTEMS PER A. HANGERS AND SEISMIC BRACING FOR MECHANICAL �V����� ��s�O�L <br /> CHR CHILLED WATER RETURN, CHILLER HGL REFRIGERANT HOT GAS LINE ENERGY CODE ENFORCED BY THE LOCAL AHJ AND SUBMIT SYSTEMS SHALL BE DESIGNED AND SPECIFIED BY <br /> A WRITTEN REPORT TO THE BUILDWG OWNER. REFER TO DIVISION 21, 22, 23. DIVISION 21, 22, 23 SHALL REFER � ����� �� �� <br /> CHS CHILLED WATER SUPPLY HORIZ HORIZONTAL SPECIFICATIONS FOR ADDITIONAL TESTING, ADJUSTING, ' <br /> S SENSOR PLUM�ING NOTES TO THE MECHANICAL DRAWWGS FOR LOCATIONS OF <br /> CHP CHILLED WAT�R PUMP HP HORSEPOWER, HEAT PUMP AND BALANCWG (TAB) REQUIREMENTS. <br /> SA SUPPLY AIR EQUIPMENT AND HUNG MECHANICAL SYSTEMS AS <br /> CKV CHECK VALVE HPC HIGH PRESSURE CONDENSATE RETURN SAT SUPPLY AIR TEMPERATURE STRUCTURAL DRAWINGS DO NOT SHOW THE AT <br /> 7. MECHANICAL SYSTEMS COMMISSIONING AND COMPLETION <br /> CLG CEILWG, COOLING HPS HIGH PRESSURE STEAM SCFM STANDARD CUBIC FEET PER MINUTE 1. WATER HAMMER ARRESTORS: PROVIDE AT THE END OF REQUIREMENTS: TEST SYSTEMS TO ENSURE THAT P P NGIOAND OTHER COMPONE�NTS MENT, DUCTWORK, 2416 Colb Aven ue <br /> CO CLEANOUT, CO SENSOR HRU HEAT RECOVERY UNIT SCH SCHEDULE HOT AND COLD WATER LINES SERVING TWO OR MORE BUILDING SYSTEMS HAVE BEEN DESIGNED, INSTALLED, Y <br /> CO2 CO2 SENSOR HST STORAGE TANK SD STORM DRAIN PIPING FIXTURES. SIZE IN ACCORDANCE WITH PLUMBING AND AND FUNCTION PROPERLY, EFFICIENTLY, AND CAN BE g, DIVISION 21, 22, 23 SHALL COORDWATE THE SUPPORT EV�rGtt, WA 98203 <br /> COMB COMBUSTION, COMBINATION HTG HEATING SENS SENSIBLE DRAINAGE INSTITUTE (PDI) REQUIREMENTS. MAWTAINED IN ACCORDANCE WITH THE CONTRACT SYSTEMS AND DESIGN LOADS FOR HUNG PIPING AND <br /> COND CONDENSER, CONDENSATE HVAC HEATING, VENTILATWG, AND AIR CONDITIONING SF SUPPLY FAN, SQUARE FOOT DOCUMENTS IN ORDER TO SATISFY THE BUILDWG <br /> 2. ACCESS PANELS: PROVIDE IN NON ACCESSIBLE CEILINGS OWNER'S DESIGN INTENT AND OPERATIONAL OTHER MECHANICAL SYSTEMS (INCLUDING COMBINED b p �+ <br /> CONN CONNECTOR HW HOT WATER PIPING SUPPLY GRILLE, SIGHT GLASS WITH MOISTURE MULTIPLE PIPE RUNS)WITH THE GENERAL PERIVI IT (���7U�M�T�AL <br /> SG AND WALLS FOR VALVES, WATER HAMMER ARRESTERS, REQUIREMENTS PER ENERGY CODE ENFORCED BY THE <br /> CONT CONTINU�, CONT'ROL HWC HOT WATER CIRCULATING PIPWG INDICATOR CONTRACTOR AND THE STEEL AND WOOD JOIST <br /> COP COEFFICIENT OF PERFORMANCE HWR HOT WATER RETURN SHC STEAM HEATING COIL CLEANOUTS, AND OTHER ITEMS THAT REQUIRE ACCESS LOCAL AHJ. REFER TO SPECIFICATIONS FOR ADDITIONAL MANUFACTURERS IN ADDITION TO OTHER TRADES 05/15/2019 <br /> TO PROPERLY MAINTAIN OR SERVICE THE BUILDING. COMMISSIONING REQUIREMENTS THAT MAY BE IMPACTED. <br /> COTG CLEANOUT TO GRADE HWS HOT WATER SUPPLY SIM SIMILAR REFER TO SPECIFICATIONS. <br /> CONDENSATE RECEIV�R, CONDENSER WAl'ER HX HEAT EXCHANGER SL REFRIGERANT SUCTION LINE 8. THIS BUILDING AND ITS ENERGY SYSTEMS HAVE BEEN <br /> CR This drawing is: <br /> C RETURN HZ HERTZ SMACNA SHEET METAL AND AIF2 CONDITIONWG 3. CLEANOUTS: PROVIDE AT THE BASE OF SANITARY DESIGNED TO COMPLY WITH ENERGY CODE ENFORCED BY 1. Copyright 2017 Dykeman, Inc. C <br /> CS CONDEIVSER WATER SUPPLY CONTRACTORS' NATIONAL ASSOCIATION, INC. DRAINAGE, CONDUCTORS THE LOCAL AHJ. CONTRACTOR IS RESPONSIBLE FOR 2. The Architect's Instrument of Professional Service. , <br /> CT COOLING TOWER IAQ INDOOR AIR QUALITY SO SCREENED OPENING CORRECT INSTALLATION OF ENERGY CONSERVATION 3. For use on this project only. Obtain Architect's <br /> CTF COOLING TOWER FILTER ID INDIRECT DRAIN SOV SHUTOFF VALVE MEASURES. written permission for any other use or reproduction. <br /> C. TK COMPRESSION TANK IE INVERT ELEVATION SP STATIC PRESSURE <br /> CU CONDENSING UNIT, CUBIC IN. INCH SPKR SPRINKLER <br /> ,� � t. <br /> Cv FLOW COEFFICIENT IN. WG INCHES WATER COLUMN SPS STATIC PRESSURE STATION <br /> CV CONSTANT VOLUME IRR IRRIGATION PIPING SS STAINLESS STEEL, SANITARY SEWER ZO� 9-O� � <br /> CW COLD WATER PIF'WG IW INDIRECT WASTE PIPING ST SOUND TRAP <br /> CWR CONDENSING WATER RETURN STM STEAM � <br /> CWS CONDENSING WATER SUPPLY kW KILOWATT SW SOFT WATER PIPING _ <br /> y <br /> S. TK STORAGE TANK MARK DATE DESCRIPTION <br /> D DRAIN L LENGTH <br /> DB DRY BULB (TEMPERATURE) LAT LEAVING AIR TEMPERATURE T TEMPERED WATER PIPING � <br /> dB DECIBEL LB LINEAR BAR TBV TOWER BYPASS VALVE <br /> DCVA DOUBLE CHECK VALVE ASSEMBLY LBS POUND TCV TEMPERATURE CONTROL VALVE <br /> DDCV DOUBLE DETECTOR CHECK VALVE l.D LINEAR DIFFUSER TD TRENCH DRAIN, TEMPERATURE DIFFERENCE <br /> DEG DEGREE LL REFRIGERANT LIQUID LINE TDH TOTAL DYNAMIC HEAD <br /> DFU DRAINAGE FIXTURE UNIT LPC LOW PRESSURE CONDENSATE RETURN TEMP TEMPERATURE <br /> DH DUCT HEATER LPG LIQUID PETROLEUM GAS PIPWG TG TRANSFER GRILLE <br /> DI DUCTIL� IRON LPS LOW f'RESSURE STEAM TOD TOP OF DUCT <br /> DIA DIAMETER LRA LOCKED ROTOR AMPS T�P TOP OF PIPE <br /> DIM DIMENSION LR LINEAR RETURN TOS TOP OF STEEL <br /> DISC LOCATION OF STARTER, DISCONNECT AND LVR LOUVER TOF TOP OF FOOTING <br /> CONTROLS LWR LOW WALL RETURN TRAP STEAM TRAP � <br /> DISCH DISCHARGE L1NS LQ�[1l�fALLSIlPPLY TSP TOTAL STATIC PRESSURE <br /> DN DOWN LWCD LOW WATER CUT-OFF T'STAT THERMOSTAT <br /> DPV DIFFERENTIAL PRESSURE VALVE LWT LEAVING WATER TEMPERATURE TU TERMINAL UNIT <br /> DWGS DRAWWGS TYP TYPICAL <br /> B DV DRAIN VALVE MA MEDICAL AIR B <br /> DW� DOMESTIC WATER BOOSTER MAC MEDICAL AIR COMPRESSOR UG UNDERGROUND <br /> � <br /> (E) �XISTING MAT MIXED AIR TEMPERATURE UH UNIT HEATER <br /> MAV MANUAL AIR VENT UNO UNLESS NOTED OTHERWISE PRINCIPAL IN CHARGE: � BJB <br /> EA EXHAUST AIR PROJECT MANAGER ( BJB <br /> MAX MAXIMUM PROJECT ARCHITECT: � - <br /> EAT ENTERING AIR TEMPERATURE MBH T�IOUSAND BTU PER HOUR V VENT PIPING, VOLT JOB CAPTAIN: � SLR <br /> EER ENERGY EFFICIENCY RATIO MC MECHANICAL CONTRACTOR VA VALVE + <br /> EF EXHAUST FAN MCA MINIMUM CIRCUIT AMPACITY VAV VARIABLE AIR VOLUME <br /> .� <br /> EFF EFFICIENCY MECH MECHANICAL VCD VOLUME CONTROL DEVICE <br /> EG EXHAUST GRILLE, ENGINE GENERATOR MERV MINIMUM EFFICIENCY REPORTING VALUE VD VOLUME DAMPER <br /> EJ EXPANSION JOIN`f MIN MINIMUM VEL VELOCITY <br /> EL �LEVAT'ION MOCP MAXIMUM OVERCURRENT PROTECTION VENT VENTILATION, VENTILATOR <br /> ELEC ELECTRIC MOD MOTOR OPERATED DAMPER VFD VARIABLE FREQUENCY DRIVE <br /> EMCS ENERGY MANAGEMENT AND CONTROL SYSTEM MPC MEDIUM PRESSURE CONDENSATE RETURN VOLT VOLTAGE <br /> EQUIV EQUIVALENT MPG MEDIUM PRESSURE GAS VTR VENT THRU ROOF <br /> ESP EXTERNAL STATIC PRESSURE MPS MEDIUM PRESSURE STEAM <br /> ET EXPANSION TANK MV MEDICAL VACUUM W WASTE, WATT, WIDE, WATER <br /> EVAP EVAPORATOR, EVAPORATIVE W/ WITH � <br /> EWC ELECTRIC WATER COOLER �/�/g WET BULB (TEMPERATURE) <br /> EWT ENTERING WATER TEMP WC WATER CLOSET, WATER COLUMN <br /> EXH EXHAUST WCO WALL CLEANOUT <br /> EXT EXTERIOR, EXTERNAL <br /> WG WATER GAGE <br /> WH WATER HEATER, WALL HYDRANT <br /> WHA WATER HAMMER ARRESTOR <br /> � , a • , � � <br /> ;. ... �.. <br /> : � ,. <br /> WM WATER METER .� : � . .� <br /> WSEC WASHINGTON STATE ENERGY CODE M��I-1/"1N I Cf'1L <br /> WSFU WATER SUPPLY FIXTURE UNIT <br /> A WT WEIGHT I��pf��VIATION�7 C�C A <br /> GENERAL NOTES <br /> LL �_- , x: � <br /> �� � <br /> f, - -� <br /> � � <br /> 1 2 3 4 5 6 <br />