Laserfiche WebLink
GSTRUCTURAL ENGINEERING, LLC BUILDING <br /> EFFECTIVE.EFFICIENSOLUTIONS DEPARTMENT <br /> T. <br /> RESPONSE LETTER <br /> City of Everett,Public Works Dept October 24,2018 <br /> Attn: Mr.Jeff Heilman GK Project#: YR10-18-037 <br /> 3200 Cedar St <br /> Everett, WA 98201 <br /> Re: Corrections Letter Response for DeLeon Residence Fire Damage Repair <br /> City of Everett Permit#C1809-002 <br /> Dear Mr.Heilman: <br /> GK Structural Engineering,LLC(GKSE)is in receipt of the City of Everett Corrections Letter dated <br /> October 3,2018 for the above referenced project. The following is a corresponding itemized <br /> response and clarification to the building/structural review comments. Please reference the attached <br /> revised construction drawings with bubbled revisions(#1). <br /> Building/Structural: <br /> 1. The plans have been modified to incorporate the appropriate energy code/separation <br /> requirements for the new rec room relative to the exterior and the remaining garage space as <br /> follows: <br /> a. The plans have been modified to show the existing slab on grade at the rec room to <br /> be removed&replaced with a new slab after installing the required R-10 x 2' <br /> perimeter rigid insulation break with the remaining garage as well as the north and <br /> south exterior walls. Reference revised basement floor plan,revised detail 6/Sht 5 <br /> and new detail 6/Sht 6. <br /> b. Reference response to item la above. See new detail 6/Sht 6. <br /> c. The existing 2x4 north and south exterior walls of the rec room have been specified <br /> to be furred out to the interior face of existing concrete stem wall and insulated with <br /> new R-21 kraft-faced batt insulation. The new partition between the garage and new <br /> rec room has already been specified as 2x6 with R-21 insulation. <br /> d. A note has been added on the basement floor plan to insulate the existing 4x header <br /> at the rec room window with new R-10 rigid insulation. <br /> Please call with any questions or clarifications. 10/24/10 <br /> Sincerely, `: 0 it i <br /> =,7,:, <br /> >ffrwfro <br /> , _ r ,zd <br /> GK STRUCTURAL ENGINEERING, LW <br /> F. <br /> Jeffrey J. Gilliland,PE, SE . �! ,- C*a� <br /> Principal %,� ....,gs4s 6,\i ',��'v <br /> Attachments: Revised Construction Drawings, dated 10-24-18 <br /> s` 'iONALNV <br /> 14703 1e''LANE NE, #205 PAGE 1 OF 1 PH/F:425.318.6049 <br /> DUVALL, WA 981319 WW144GKSTRUCTUR4L.COM <br />