Laserfiche WebLink
' SEE DRAWING C102 <br /> ® STORM NOTES <br /> >I <br /> a. <br /> 1 SEE SURVEY CONTROL PLANS FOR DEFINITION OF <br /> 2 j SD24-03 CONSTRUCTION BASELINE STATIONING AND VERTICAL <br /> Z <br /> a' <br /> o �; � SD25-03A,TY?E 2 CB(48").4 8 CONTROL. <br /> 1_'' V, / SD25-02,TYPE 2 CB(48") Z . ESTA=44+23.23(10.78'L) <br /> ;.1 ; STA=43+37.80(10.03'L)--., 2 POTHOLE USING AIR/VACUUM EXCAVATION TO LOCATE <br /> > UTILITIES PRIOR TO THE START OF CONSTRUCTION. <br /> a <br /> 3 INSTALL NEW STORM DRAINAGE PIPE AS INDICATED ON THE <br /> 8 <br /> SD24-02A,TYPE 2 CB(48")01. SD25-01,TYPE 2 CB(4810. 1; w PLAN AND PROFILE AND IN ACCORDANCE WITH THE SPECIAL <br /> ® 7-STA=40+52.75(11.11'L) STA=42+15.70(5.57'L) 1 <br /> 11 V 2 1 PROVISIONS AND SPECIFICATIONS. EXCAVATE AND BACKFILL <br /> i ( D 11 TRENCH PER COE STD DRAWINGS 614,615,AND 620. <br /> 0 4 INSTALL NEW STORM DRAINAGE STRUCTURE AS INDICATED ON <br /> - -11711 <br /> _ ' © THE PLAN AND PROFILE AND IN ACCORDANCE WITH THE <br /> _ _LJ SPECIAL PROVISIONS AND SPECIFICATIONS. INLETS AND CATCH <br /> 40 12"5 { _- 2"SD o - 1 BASINS SHALL BE PER COE STD DRAWINGS 401,402,403 AND <br /> S 7 ���12"SD o 2"5'IP VI O e 0 405. OFFSETS ARE SHOWN TO THE CENTER OF STRUCTURE. <br /> © T r 9TH STREET <br /> ,- o r 5 INSTALL MH FRAME AND COVER PER STD DRAWING 610. <br /> ,, V " ® 2OLF 8"SD @ 1.90%® ©® �-', © -4 O 5025-03,TYPE 1 CB 4 8 6 CONNECT TO EXISTING PIPE. CONTRACTOR TO CONFIRM PIPE <br /> 0 <br /> �+ - - : O a = _^ x - STA=44+22.97(11.22'R) MATERIAL,OUTSIDE DIAMETER AND ELEVATION PRIOR TO <br /> < 5024-02,INLET 4 8 + RIM=137.24 STRUCTURE MATERIAL SUBMITTALS. <br /> / IE 8" N=134.57 <br /> 0 <br /> STA=40+58.43(8.07'R) ( 1 7 ABANDON EXISTING PIPE. PLUG AND SEAL EXISTING PIPE AND <br /> 9 ' - RIM=127.96 : ABANDON IN PLACE IN ACCORDANCE WITH SP 2-02.3(5). <br /> e,- :H 1E 8 (N)=125.29 8 SD <br /> CO SD25-026,INLET _ ,, 8 REMOVE EXISTING STRUCTURE IN ACCORDANCE WITH SP <br /> E9 2-02.3(3)E. SALVAGE FRAME AND GRATE OR COVER AND <br /> STA=43+59.54(30.68'R) ` <br /> - - -- DELIVER TO COE MAINTENANCE AND OPERATIONS. <br /> © SD24-01A 9 ABANDON EXISTING STRUCTURE IN ACCORDANCE WITH Sr' <br /> 22LF 8"01 SD @ 2.96% 3 12 SD25-02A,INLET 4 8 7-05.3(2).SALVAGE FRAME AND GRATE OR COVER TO COE <br /> STA=43+87.44(31.56'R) MAINTENANCE AND OPERATIONS. <br /> 10 POWER POLE TO BE SUPPORTED DURING CONSTRUCTION. <br /> SD24-018 - COORDINATE WORK WITH PUD. <br /> 11 COORDINATE WITH INSPECTOR&PSE WHILE IN THIS AREA. <br /> I CONTACT MARDY PUNTENEY AT 425-754-8053. BED EXPOSED <br /> GAS MAIN OR SERVICE WITH SAND IN ACCORDANCE WITH SP <br /> IIII . . a 11111.1111 9-03.22. <br /> a ■ ■ • ■ MINIIMINIIIII <br /> 20 10 0 20 40 12 REMOVE EXISTING PIPE AS NEEDED TO INSTALL NEW <br /> SCALE:1" V <br /> PI A N FEET IMPROVEMENTS. <br /> L/ 13 CONNECT TO EXISTING STRUCTURE. <br /> 20'-0" <br /> 14 RELOCATE EX WATERLINE.COORDINATE WORK WITH COE <br /> WATER DEPARTMENT. SEE DRAWING W01. <br /> 15 CONFIRM RIM ELEVATION PRIOR TO STRUCTURE MATERIAL <br /> SUBMITTALS. <br /> 16 PROVIDE TEMPORARY SILT FENCE PER COE STDDRAWING214. <br /> oi <br /> 17 ANTICIPATED CONFLICT WITH EXISTING SIDE SEWER. REROUTE <br /> SIDE SEWER BELOW PROPOSED SD. PROVIDE 12-INCHES MIN <br /> m VERTICAL CLEARANCE FROM PROPOSED SD. <br /> a0 145 <br /> ,1T1145 - ry m co <br /> e0 m <br /> 5 nov cvmj�^ "ti'v <br /> of O 0.- <br /> N m NM N I, no <br /> rn1.4 <br /> 17/ 3 > vj--riN m Oz 11 m = o co ?moI 'o I�3 <br /> d d 140 0o m aD cc N.� W i No Lh 7, 31. o mN. N. N'oD , ''4117,11 <br /> W - 140 <br /> Q �N NO UJ Da nw <br /> ~ �N,N-1-1 CC <br /> yf C7 G�W W4 OOC�W W �2W W Vl a' — � <br /> b N N m —J <br /> F W 9.-1i-_? EX GRADE @STA CENTERLINE w c M.� w NOTE <br /> '1' .�- - - ^' • '^ ''- - .. ._ — .. . ... 0 135 <br /> v, a 135 N "N 7,7'1 M^'...-, x N ° ti _ _ — 1. SEE DRAWING C201 FOR RESTORATION. <br /> �' '.' �- ON N 2—W W <br /> m $ N�w w w m N II 7 V1 K _ <br /> z <br /> ill. '—' �_ — / 2. ALL CATCH BASINS AND INLETS SHALL HAVE STANDARD <br /> CD q o L 'r.��'-n — — - 85LF 12"SD @ 0.60% > DIRECTIONAL VANED GRATE PER COE STD DRAWING 411 UNLESS <br /> 3 ' > �' d 117,N — — — — — — 130 w NOTED OTHERWISE.SOLID COVER SHALL BE PER COE STD DWG 410 <br /> oy 130 - ,N, CO o2,-..-,m — - w FOR TYPE 1 AND 1L CATCH BASINS AND COE STD DWG 610 FOR <br /> .g = a3 w w wl EX CS — TYPE 2 CATCH BASINS. <br /> c'g — — — n 122LF 12"SD @ 1.33% <br /> a� <br /> o a <br /> c 3,2 125 0 . _ 125 <br /> W 8 163LF 12"SD @ 3.39% _ 46LF 12"SD @ 6.87° <br /> o y o 28LF8"SD@ 1.00 <br /> o „„ <br /> 0 0 m 120 - yLWSI I . <br /> 120 <br /> z <br /> �f <br /> 0 0 0 1 <br /> a d 1 -_ <br /> x a 115 115 <br /> o2 40+00 40+20 40+40 40+60 40+80 41+00 41+20 41+40 41+60 41+80 42+00 42+20 42+40 42+60 42+80 43+00 43+20 43+40 43+60 43+80 44+00 44+20 44+40 - <br /> 4 <br /> F.6 o •6' PROFILE <br /> ci 2 STA 40+00 TO STA 44+40 <br /> E <br /> Q a <br /> c SCALE:HORIZ:1"=20'VERT:1"=5' - <br /> a. 2 p Des,Hned Drawing <br /> m a V OfeWf <br /> AIR <br /> A�6,.L--ROs�f 4CITY OF EVERETT ALVERSON STORMWATER STORM DRAINAGE PLAN AND PROFILE C101 <br /> PL. ti Gil .;., -6414.0. <br /> s9r -. <br /> o D `heed SNN PUBLIC WORKS SEPARATION PROJECT 9TH STREET <br /> I{ I Desitin Review level - Sheet No. <br /> i>: n NO.I DATE I APRVD REVISION <br /> PLANS ISSUED FOR 'O�`;;aps 3200 Cedar Street WORK ORDER 3660 8 <br /> j a arsTse.�6 fveret4 WA 9B201 STA 40+00 TO STA 44+40 23 <br /> Z BID I CONST '/ONAL 2��' 425.257.8800 everettwa.gov <br /> c -- ✓, ACTION DATE APRVD ACTION ; DATE I APRVD ACTION DATE I APRVD ofrotaI <br /> j . <br /> v <br />