My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2603 E GRAND AVE 2020-03-06
>
Address Records
>
E GRAND AVE
>
2603
>
2603 E GRAND AVE 2020-03-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2020 2:45:28 PM
Creation date
3/6/2020 2:44:09 PM
Metadata
Fields
Template:
Address Document
Street Name
E GRAND AVE
Street Number
2603
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REG 09-25-2018(U) 09:08 <br /> TJ. REG-I 020417 <br /> i <br /> CT 1 <br /> : <br /> PERMIT No.1809007 <br /> ,ETT ; '/C $319.96 <br /> (425)257-88101 A^ .96D <br /> Plan Check No.: BW1809-007 <br /> Application Date: 9/25/2018 <br /> Tenant: [Ten Name] <br /> Owner: SOUNDLINE CONSTRUCTION LLC <br /> Job Address: 2603 E GRAND AVE <br /> Proposed Use: SFR DETACHED <br /> Description of Work: REPAIR ROTTED BACK WALL/REMOVE <br /> LOAD BEARING WALL <br /> Plan Check Fee Paid: $319.96 <br /> The building permit application for the above-referenced project is being conditionally accepted for filing <br /> pending the determination of its completeness. <br /> If the City review determines that any additional land use approval or any additional information is <br /> required to complete your building permit application,it will be necessary to submit this additional <br /> information or acquire the additional land use approval prior to your application being considered complete <br /> for filing.If no other land use approval or additional information is required,your building permit <br /> application will be considered filed as of this date. Plan review fees are estimates. Final plan review fees <br /> will be calculated at permit issuance. <br /> BUILDING PERMIT APPLICATIONS EXPIRE IF NO PERMIT IS ISSUED <br /> WITHIN 180 DAYS FOLLOWING THE DATE OF APPLICATION. <br /> c(_ \ ef-2,5- tc( <br /> Signature Date <br /> FILE COPY <br />
The URL can be used to link to this page
Your browser does not support the video tag.