My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6133 LAKE CHAPLAIN RD 2020-03-09
>
Address Records
>
LAKE CHAPLAIN RD
>
6133
>
6133 LAKE CHAPLAIN RD 2020-03-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 10:07:49 AM
Creation date
3/9/2020 10:05:53 AM
Metadata
Fields
Template:
Address Document
Street Name
LAKE CHAPLAIN RD
Street Number
6133
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1/21/2020 age ✓'�!� <br /> City of Everett � <br /> 1:44:45PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. El 811-127 Site Address 6133 LAKE CHAPLAIN RD <br /> Applied 11/19/2018 Applicant Lot <br /> Approved 11/19/2018 Owner EVERETT CITY OF Block <br /> Issued 11/19/2018 Contractor ASHFORD ELECTRIC&CONST CO Tract <br /> Parent Permit No. Description INSTALL NEW PUMP SKID,MCC&REPLACE LIGHITNG WI'] <br /> Notes <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 12/12/2018 12/13/2018 ELEC SKB PARTIAL APPR eTRAKiT Inspection 12/11/2018 8:23 AM ASHFORD <br /> 03-SLAB/CONDUI Request ELECTRIC&CONST CO <br /> Please call Michael at 206-786-0664 and let <br /> me us which day and time this project will <br /> be inspected <br /> Contact Name:ASHFORD ELECTRIC& <br /> CONST CO <br /> Site Address:6133 LAKE CHAPLAIN RD <br /> Phone:4258891486 <br /> e-Mail:michael@ashfordelectric.com <br /> (12/13/2018 7:26 AM SKB) <br /> Ok deep slab cover. <br /> 12/18/2018 12/18/2018 ELEC SKB APPROVAL eTRAKiT Inspection 12/16/2018 10:05 PM ASHFORD <br /> 04-GROUNDING Request ELECTRIC&CONST CO <br /> Ground Grid connection to Rebar GC <br /> would like to pour concrete on Wednesday <br /> Please call Michael with inspection day and <br /> time 206-786-0664 <br /> Contact Name:ASHFORD ELECTRIC& <br /> CONST CO <br /> Site Address:6133 LAKE CHAPLAIN RD <br /> Phone:4258891486 <br /> e-Mail:michael@ashfordelectric.com <br /> (12/18/2018 12:29 PM SKB) <br /> Ground ring and UFER. <br /> 1/22/2019 1/22/2019 ELEC 08-OTHER SKB APPROVAL As noted 1/17/2019 2:14 PM ASHFORD ELECTRIC <br /> &CONST CO <br /> Reroute power to keep pumps and scada <br /> system in operation while the MCC is <br /> replaced. Michael(206)786-0664 <br /> Contact Name:ASHFORD ELECTRIC& <br /> CONST CO <br /> Site Address:6133 LAKE CHAPLAIN RD <br /> Phone:4258891486 <br /> e-Mail:michael@ashfordelectric.com <br /> (1/22/2019 3:11 PM SKB) <br /> 250 amp temporary feeder panel,step down <br /> transformer and feeder panel. <br /> 1/22/2019 1/22/2019 ELEC 02-GROUND SKB PARTIAL APPR (1/22/2019 3:11 PM SKB) <br /> WORK Feeder panel conduit. <br /> INSP12 C SYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.