My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3409 LOMBARD AVE 2020-03-09
>
Address Records
>
LOMBARD AVE
>
3409
>
3409 LOMBARD AVE 2020-03-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 11:02:15 AM
Creation date
3/9/2020 11:01:43 AM
Metadata
Fields
Template:
Address Document
Street Name
LOMBARD AVE
Street Number
3409
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2019 System Development Fee Calculations <br /> Permit#: pw1905-050 Additional Notes: <br /> Project Address: 3409 lombard ave <br /> Project Name: Concrete walkway <br /> Answer the Following Questions(Required):All Yellow Inputs <br /> Water District: Everett <br /> Sewer District: Everett Prepared By: Be m Stephanos 5/14/2019 <br /> Outside City Limits? *Adds a 25%Surcharge //�, <br /> Supportive Housing Credit? *Reduces by 80% Reviewed By: Date: 5iI t (JU 0\ <br /> Fee Calculations: <br /> Water&Sewer System Development Fees: <br /> Domestic Meter: Fee Calculation(Before Credit): Credit Calculations(Up to 3 meters for Meter-Based Calculation or 3 previous building uses for Administrative Guidelines-Based Calculation): <br /> *Subject to Administrative Guidelines Proposed Building Use: Previous Bldg Use#1: Previous Bldg Use#2: Previous Bldg Use#3: <br /> ProposedUnit Measure: #N/A Unit Measure for Use#1: #N/A Unit Measure for Use#2: #N/A Unit Measure for Use#3: #N/A <br /> #N/A Proposed Meter Size: None Credited Meter#1 Size: None Credited Meter#2 Size: None Credited Meter#3 Size: None <br /> Water Fee: #N/A Water Credit#1: #N/A Water Credit#2: #N/A Water Credit#3: #N/A <br /> Sewer Fee: #N/A Sewer Credit#1: #N/A Sewer Credit#2: #N/A Sewer Credit#3: #N/A <br /> Total Fees Due:Add to Utility Permit for Domestic Meter <br /> Permit#:U Water Sys Dev Fee Total: #N/A This fee reflects credit for existing water meter <br /> Sewer Sys Dev Fee Total: #N/A This fee reflects credit for existing water meter <br /> Total: #N/A <br /> Irrigation Meter: Fee Calculation(Before Credit): Credit Calculations: <br /> Proposed Meter Size: None Credited Meter Size: None <br /> Water Fee: $0.00 Water Credit: $0.00 <br /> No Sewer Fee: $0.00 No Sewer Credit: $0.00 <br /> Total Fees Due:Add to Utility Permit for Irrigation Meter <br /> Permit#:U Water Sys Dev Fee Total: $0.00 This fee reflects credit for existing water meter <br /> No Sewer Sys Dev Fee: $0.00 Irrigation meters are only subject to the water portion of system development fees <br /> Total: $0.00 <br /> Fire Meter: Proposed Meter Size: None For informational purposes only <br /> Permit#:U No Sys Dev Fees: $0.00 Fire meters are not subject to system development fees <br /> Stormwater System Development Fees: <br /> Permit#: PW1905-050 Type of Construction: Existing Development Adding New+Replaced Hard Surfaces 1 <br /> Square Feet of New Plus Replaced Hard Surfaces: 360 SF <br /> Stormwater System Dev Fee: $89.53 Add this fee to the Building Permit(or Public Works Permit if there is no building permit for the project) <br />
The URL can be used to link to this page
Your browser does not support the video tag.