My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1802 RUCKER AVE 2020-03-09
>
Address Records
>
RUCKER AVE
>
1802
>
1802 RUCKER AVE 2020-03-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 11:49:28 AM
Creation date
3/9/2020 11:48:21 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
1802
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1/28/2019 page 1 <br /> 2:49:53PM City of Everett <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1701-006 Site Address 1802 RUCKER AVE <br /> Applied 1/13/2017 Applicant Lot <br /> Approved 4/6/2017 Owner FORDE VIGGO&ROJALES-FORDE AILEEN A Block <br /> Issued 4/7/2017 Contractor CORE BUILDERS LLC Tract <br /> Parent Permit No. PW1701-014 Description NEW 2 CAR GARAGE WITH REC ROOM,BATH <br /> Notes REPLACES EXISTING GARAGE <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 6/13/2017 6/13/2017 Footing KMK PartialApproval OK to pour south side <br /> Note:UFER will be set in north pour <br /> 6/13/2017 6/13/2017 Foundation KMK PartialApproval OK to pour south side <br /> Note:UFER will be set in north pour <br /> 6/19/2017 6/19/2017 PlbgGrWork DXW Approval Bar sink,water <br /> closet,shower,lay <br /> OK <br /> 6/22/2017 6/22/2017 UFER Ground KMK Approval Contractor to tie <br /> UFER 8"-10"OC <br /> 6/22/2017 6/22/2017 Foundation KMK Approval Contractor to tie <br /> UFER 8"-10"OC <br /> 6/22/2017 6/22/2017 Underfloor KMK Approval Contractor to tie <br /> UFER 8"-10"OC <br /> 8/4/2017 8/4/2017 Framing DWF Approval <br /> 8/4/2017 8/4/2017 ShearNailing DWF Approval OK for siding and to install 5/8"Type X <br /> dens glass south side to PL. <br /> Will inspect. <br /> 8/4/2017 8/4/2017 PlbgRoughln SDP Approval <br /> 8/25/2017 8/25/2017 ShearNailing TMB Approval <br /> 8/25/2017 8/25/2017 DrywallNailing TMB Approval Exterior gypsum panels installed. <br /> OK to install siding. <br /> 9/22/2017 9/22/2017 Framing KMK PtAppr-CorrReq Framing OK pending electrical and <br /> mechanical rough ins. <br /> Do not insulate until electrical and <br /> mechanical rough in inspections are <br /> complete. <br /> 9/25/2017 9/25/2017 MechRoughln SDP Approval Bathroom exhaust <br /> OK <br /> 12/22/2017 12/22/2017 BLDG DWF APPROVAL See notes Insulation-R-21 walls <br /> INSULATION Note:Provide a copy of insulation <br /> certificate at building final. <br /> OK to cover with drywall <br /> 1/16/2018 1/16/2018 BLDG DWF PARTIAL APPR OK to cover(mud/tape) <br /> 09-DRYWALL Note-attic wall to roof needs fire wall <br /> separation and fire tape <br /> Garage from living area <br /> 10/31/2018 10/31/2018 BLDG 14-FINAL DWF CORRECTION Complete fire wall in attic <br /> fire tapes seams-cover nails. <br /> Need elect,mech,plumb,public works <br /> finals <br /> 11/1/2018 11/1/2018 MECH 06-FINAL SDP APPROVAL <br /> 11/1/2018 11/1/2018 PLUMB 06-FINAL SDP APPROVAL <br /> INSP12 Cs' TEM <br />
The URL can be used to link to this page
Your browser does not support the video tag.