My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7000 HARDESON RD 2017 Plans 2022-11-04
>
Address Records
>
HARDESON RD
>
7000
>
Plans
>
7000 HARDESON RD 2017 Plans 2022-11-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2022 3:53:30 PM
Creation date
3/9/2020 2:58:28 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7000
Permit
PW1712-029
B1712-024
Year
2017
Notes
REPLACE PARKING LOT DRAINAGE AND RESTRIPING
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TEMPORARY EROSION SEDIMENT CONTROL (TESC) NOTES: GENERAL NOTES: <br /> 1. THE IMPLEMENTATION, CONSTRUCTION, MAINTENANCE, REPLACEMENT AND UPGRADING 1. TREES WERE LOCATED BY FIELD MEASURE AND SHOULD BE CONSIDERED APPROXIMATE. <br /> OF THESE TESC FACILITIES IS THE RESPONSIBILITY OF THE APPUCANT/CONTRACTOR <br /> UNTIL ALL CONSTRUCTION IS APPROVED. 2. ALL CONSTRUCTION DEWATERING STORMWATER SHALL BE COLLECTED AND SETTLED IN A <br /> PORTABLE TANK OR SIMILAR SETTLING DEVICE BEFORE DISCHARGING TO ON—SITE <br /> 2. CONSTRUCT THE TESC FACILITIES IN CONJUNCTION WITH ALL CLEARING AND GRADING STORMWATER FACILITY. <br /> ACTIVITIES, AND IN SUCH A MANNER AS TO INSURE THAT SEDIMENT LADEN WATER <br /> DOES NOT LEAVE THE SITE, ENTER THE DRAINAGE SYSTEM OR VIOLATE APPLICABLE 3. ALL STORMWATER TRENCH DRAINS AND CATCH BASINS SHALL BE CLEANED AFTER ALL <br /> WATER STANDARDS, CONSTRUCTION IS COMPLETE. <br /> 3. THE TESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR 4. STORMFILTER WATER QUALITY FACILITY SHALL BE CLEANED AND ALL FILTERS CHANGED <br /> ANTICIPATED SITE CONDITIONS. UPGRADE THESE TESC FACILITIES DURING (APPROX 93 FILTERS) AFTER ALL CONSTRUCTION IS COMPLETE (PHASE 3 IT�M). <br /> CONSTRUCTION AS NEEDED TO MATCH CHANGING SITE CONDITIONS AND LARGER THAN <br /> ANTICIPATED STORM EVENTS. 5. FOR STORM DRAINAGE REMOVALS AND MODIFICATIONS, SEE STORM DRAINAGE PLAN AND <br /> PROFILE SHEETS. <br /> 4. INSPECT CATCH BASINS DAILY. CLEAN CATCH BASIN INSERTS REGULARLY AND <br /> IMPLEMENT EXTRA SEDIMENTATION CONTROL METHODS IF NECESSARY. <br /> 5. ROUTINELY INSPECT AND MAINTAIN ALL INSTALLED EROSION AND SEDIMENT CONTROL <br /> BMPS, ESPECIALLY AFTER STORMS. <br /> 6. DO NOT TRACK SEDIMENT ONTO PAVED STREETS OR ROADWAYS. REMOVE SEDIMENT <br /> FROM TRUCKS AND EQUIPMENTS PRIOR TO LEAVING THE CONSTRUCTION SITE. IN THE <br /> EVENT OF FAILURE OF THE TESC SYSTEM RESULTING IN SEDIMENT TRACKING ONTO <br /> PAVEMENT, IMPLEMENT MEASURES IMMEDIATELY TO CORRECT THE SITUATION. <br /> 7. SEDIMENT THAT HAS BEEN TRACKED ONTO STREETS SHALL BE REMOVED BY <br /> SHOVELING AND SWEEPING AND CAREFULLY REMOVING TO A SUITABLE DISPOSAL <br /> AREA WHERE IT WILL NOT BE RE—ERODED. ADDITIONAL STREET CLEANING MAY BE <br /> REQUIRED AS DIRECTED BY THE CITY PUBLIC WORKS INSPECTOR. THE USE OF <br /> VACUUM SWEEPERS IS ENCOURAGED. SEDIMENT TRACKED ONTO PAVED SURFACES <br /> SHALL NOT BE WASHED INTO STORM DRAINS OR OTHER UTILITY INLETS. <br /> 8. AREAS STRIPPED OF VEGETATION SHALL BE STABILIZED WITHIN 7 DAYS BETWEEN <br /> MAY 1ST AND SEPTEMBER 30TH, AND WITHIN 2 DAYS BETWEEN OCTOBER 1ST AND <br /> APRIL 30TH. STABILIZE WITH APPROVED TESC METHODS SUCH AS SODDING, SEEDING, <br /> MULCHING WITH TWO TONS OF STRAW PER ACRE OR APPROVED EQUAL, PLASTIC, <br /> NETTING, EROSION BLANKETS, ETC. <br /> 9. UPON FINAL COMPLETION OF THE PROJECT, REMOVE ALL TESC MEASURES. TAKE <br /> CARE TO AVOID SEDIMENT FROM ENTERING THE DRAINAGE SYSTEM DURING THE <br /> REMOVAL PROCESS. <br /> 10. ALL DEWATERING DISCHARGE SHALL BE FILTERED WITH APPROPRIATE SEDIMENT <br /> REMOVAL FILTER BEFORE BEING DISCHARGED TO SITE STORMWATER FACILITIES IN <br /> ADJACENT AREAS. <br /> 11. CONTRACTOR SHALL TRANSFER AND ASSUME OWNERSHIP OF DOE CONSTRUCTION <br /> STORMWATER GENERAL PERMIT FOR DURATION OF CONSTRUCTION. <br /> �, <br /> 3 <br /> � <br /> Z <br /> � <br /> � <br /> I <br /> m <br /> O <br /> U <br /> � <br /> c <br /> � <br /> .N <br /> � <br /> � <br /> � <br /> Q <br /> V <br /> / <br /> � <br /> > . . . . . . . . . <br /> � <br /> m <br /> O <br /> U <br /> � <br /> F- <br /> U <br /> � <br /> � <br /> � <br /> O <br /> O <br /> cfl <br /> / <br /> rn <br /> rn <br /> rn <br /> 0 <br /> 0 <br /> � <br /> i <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> co <br /> / <br /> N � � . � . . � � . <br /> V <br /> � <br /> O <br /> m �Raw L�Y oEsicNE� BY s. LEI� _ � MCOB PAVEMENT RENOVATION AND REPLACEMENT sHEET <br /> � K J H v� pg 19ASfJ1�jf -��� <br /> �� CHECKED BY APPROVED BY ��"����' � "�`'���� �� ��j� °� �� � ��� � 7000/7100 HARDESON ROAD, EVERETT, WASHINGTON <br /> � X LAW R JL " � ,� rr�.�� <br /> ��� <br /> �'�'�'� � `'`�� TESC & SITE PREPARATION <br /> � � DATE _ .._� � : <br /> o � ,0 24089 16015th Avenue,Suit�. 1600 <br /> N � 0 3/19/18 KJH LAW RJL CONFORMED SET 3/19/18 �'o�,�`��'GISTER�'� ��'4 Seattle,WA 98101 ' �,oo Hardeson Road S TA N D A R D N 0 T E S <br /> � � SSroxnL E��'�' Everett, Washington 98203 <br /> 206.622.5822 <br /> � � N0. C)ATE BY CHD. APPR. REVISION J 0 B No. : 1600557 www,kpff.com (425) 348-2312 Fax (425) 438-6141 19 OF 121 <br /> � X ��'•,��,�� <br />