Laserfiche WebLink
. _____ <br /> ____ __ � _ <br /> . _ _ _ ___ _ . __ __ _ , <br /> _ _ <br /> _ _ _ __ __ __.__ . ,; � <br /> ,, �. <br /> . . . , . �i � <br /> � I <br /> � � ;. � �•. <br /> . - . � . � . � . - . � . � . � . � � . . � � . . . ' . . . . . . . . . �'� . . . . . . . . . . . _ ., . _ , ' . . . �,5�� <br /> y <br /> . , . . . . . . . . . . . . . . . . . � . . . . . . . � I � . . <br /> . _ _ STATEMENT OF STRUCTURAL SPECIAL INSPECTIONS AND TE��STING 2015 <br /> . — � .. <br /> � TABLE 2 CONTI NU ED - REQU I RED STRUCTU RAL SPECIAL I NSPECTIONS ST"TEMENT oF SPE�iA� i"SPE�Tio"A"°TESTiN� NOTEs: � <br /> I N PEt�TI ON 1. SPECIAC INSPECTIONS SHALL CONFORM TO:CHAPTER 17 OF THE INTERNATIONAL BUILDING CODE (IBC). REFER TO TABLES 1 AND 2 FOR SPECIAL INSPECTION AND TABLES 3 AND 4 <br /> � `� FOR TESTING REQUIREMENTS. � <br /> ' SYSTEM or MATERIAL IBC CODE CODE or STANDARD FREQUENCY (NOTE 8) REMARKS ' <br /> REFERENCE REFERENCE OBSERVE PERFORM 2. REFERENCE CODES AND STANDARDS ARE AS FOLL�WS: r <br /> � � � <br /> STEEL CONTINUED ' � <br /> IBC - 2015 � <br /> � INSPECTION TASKS PRIOR TO BOLTING: ACI - 318-14 : , <br /> AWS - CURRENT EDITION ; r <br /> MANUFACTURER'S CERTIFICATIONS AVAILABLE ASTM - CURRENT EDITION ', <br />' ° FOR FASTENER MATERIALS AISC 360: TB N5.6-1 X AISC - 360-10 � <br /> � FASTENERS MARKED IN ACCORDANCE WITH ASTM - 341-10 , <br /> ;' : REQUIREMENTS AISC 360: TB N5,6-1 X RCSC - 2009 ', � <br /> ! TMS - 402-13, 602-13 . <br /> PROPER FASTENERS SELECTED FOR.THE JOINT � <br /> . DETAIL (GRADE, TYPE, BOLT LENGTH IF THREADS AISC 360: TB N5.6-1 X 3. SPECIAL INSPECTIONS AND ASSOCIATED TESTING�SHALL BE PERFORMED BY AN APPROVED QUALIFIED TESTING AND INSPECTING AGENCY MEETING THE REQUIREMENTS OF ASTM � , <br /> . ARE TO BE EXCLUDED FROM SHEAR PLANE) E329 (MATERIALS}, ASTM D3740 (SDILS), ASTM C10�7 (CONCRETE), ASTM A880 (STEEL), AND ASTM E543 (NON-DESTRUCTIVE). THE TESTING AND INSPECTING AGENCY SHALL <br /> FURNISH TO THE [STRUCTURAL] [ENGINEERJ [ARCHITECT]A COPY OF THEIR SCOPE OF ACCREDITATION. SPECIAL INSPECTORS SHALL BE CERTIFIED BY THE BUILDING OFFICIAL. , <br /> PROPER BOLTING PROCEDUREFOR JOINT DETAIL 1705.2 AISC 360: TB N5.6-1 X WELDING INSPECTORS SHALL BE QUALIFIED PER SECTION 6.1.4.1:1 OF AWSD1.1. [AND WABO] <br /> ' CONNECTING ELEMENTS INCLUDI G THE 4. THE SPEGIAL. INSPECTOR SHALL OBSERVE THE INDICATED WORK FOR COMPLIANCE WITH THE APPROVED CONSTRUCTION DOCUMENTS. ALL DISCREPANCIES SHALL BE BROUGHT ' ''>r ( ' <br /> N <br /> ' APPROPRIATE FAYING SURFACE CONDITION AND , TO THE ATTENTION OF THE CONTRACTOR FOR CORRECTION AND NOTED IN THE INSRECTION REPORTS. ISSUES REQUIRING IMMEDIATE CORRECTIVE ACTIONS OR ENGINEERING � <br /> HOLE PREPARATION, IF SPECIFIED, MEET AISC 360: TB N5.6-1 X INPUT ARE TO BE BROUGHT TO THE ENGINEER'S ATTENTION IMMEDIATELY UPON DISCOVERY. '; ';. <br /> APPLICABLE REQUIREMENTS ', <br /> 5. THE SPECI.AL INSPECTOR SHAL:L FURNISH INSPECTION REPORTS FOR EACH INSPECTION TO THE BUILDING OFFICIAL, ENGINEER, CONTRACTOR, AND OWNER. THE TESTWG AND �,; <br /> PRE-INSTALLATION VERIFICATION TESTING BY INSPECTING AGENCY SHALL SUBMiT A FINP�L REPORT STATING THAT THE WORK REQUIRING SPECIAL INSPECTION WAS INSPECTED AND IS IN CONFORMANCE WITH THE APPROVED � <br /> , � INSTALLATION PERSONNEL OBSERVED AND AISC 360; TB N5.6-1 X CONSTRUCTION DOCUMENTS AND THAT ALL DISCREPANCIES NOTED IN THE INSPECTION REPORTS HAVE BEEN CORRECTED. <br /> DOCUMENTED FOR FASTENER ASSEMBLIES AND ! � �. <br /> METHODS USED 6. CONTINUOUS SPECIAL INSPECTION: SPECIAL INSPECTION BY THE SPECIAL INSPECTOR WHO.IS PRESENT WHEN AND WHERE THE WORK TO BE WSPECTED IS BEING PERFORMED. <br /> PROPER STORAGE PROVIDED FOR BOLTS, NUTS, PERIODIC SPECIAL INSPECTION: SPECIAL INSPECTION BY THE SPECIAL INSPECTOR WHO IS INTERMITTENTLY PRESENT WHERE THE WORK TO BE INSPECTED HAS BEEN OR IS BEING <br /> v WASHERS AND OTHER FASTENER COMPONENTS AISC 360: TB N5.6-1 X PERFORMED. �, <br /> a.> <br /> ' ' � INSPECTION TASKS DURING BOLTING: 7. WHERE PERIODIC INSPECTION IS ALLOWED IN ACCORDANCE WITH THE ANCHOR ICC EVALUATION REPORT, INSPECTIONS SHALL BE AS FOLLOWS: _ <br /> � FASTENER ASSEMBLIE$, OF SUITABLE CONDITION; <br /> .� , <br /> PLACED IN ALL HOLES AND WASHERS (IF AISC 360: TB N5.6-2 X • FOR ALL ANCHORS, PRIOR TO CONCEALMENT,i VERIFY: ANCHOR TYPE, ANCHOR DIMENSIONS, ANCHOR SPACING AND EDGE DISTANCE. ' <br /> � REQU.IRED) ARE POSITIONED AS REQUIRED • FOR EACH ANCHOR TYPE AND SIZE, INSPECTOR SHALL BE ONSITE TO CONTINUOUSLY INSPECT A MINIMUM OF THE FIRST 10 ANCHORS INSTALLED BY EACH 1NSTALLER FOR <br /> � JOINT BROUGHT TO SNUG-TIGHT CONDITION . CONFORMANCE WITH ICC EVALUATION,REPORT, PROVIDED ALL ANCHORS ARE INSTALLED CORRECTLY PER MANUFACTURER'S INSTRUCTiONS, PROVIDE PERIODIC INSPECTION 9 <br /> � AISC 360. TB N5.6-2 X ON A MINIMUM OF 10% OF THE NEXT 1000 ANCHORS BY EACH INSTALLER AND A MINIMUM OF 5% OF THE REMAINING ANCHORS BY EACH INSTALLER. INSPECTIONS SHALL ' <br /> PRIOR TO THE PRETENSIONING OPERATION � � <br /> � ' FASTENER C�MPONENT NOT TURNED BY THE 1705.2 OCCUR A MINIMUM OF ONCE PER WEEK AT A RANDOM TIME WHILE ANCHOR INSTALLATION IS ONGOING. ANY NON-COMPLIANCE ISSUES SHALL RESET THE INSPECTION : <br /> Q AISC 360: TB N5.6-2 X REQUIREMENTS TO TEN (10) CONTINUOUS INSPECTIONS. NON-COMPLIANT ANCHORS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER OF RECORD FOR REVIEW AND <br /> U WRENCH PREVENTED FROM ROTATtNG SHALL BE BROUGHT INTO COMPLIANCE BY EITHER TESTING OR RE-INSTALLATION. . <br /> FASTENERS ARE PRETENStONED IN ACCORDANCE • INSPECTION REPORTS SHALL IDENTIFY NAMES OF INSTALLERS. `` . <br /> WITH THE RCSC SPECIFICATION, PROGRESSING • SPECIAL INSPECTOR SHALL PROVIDE DOCUMENTATION AT THE END OF ANCHOR INSTALLATIONS STATING THAT THE MINIMUM NUMBER OF ANCHORS WERE INSPECTED. <br /> Q. SYSTEMATICALLY FROM THE MOST RIGID POINT AISC 360: TB N5.6-2 X ' ,� <br /> N TOWARD THE FREE EDGES - 8. OBSERVE: OBSERVE THESE ITEMS ON A RA�NDOM BASIS. OPERATIONS NEED NOT BE DELAYED PENDING THESE INSPECTIONS. <br /> N INSPECTION TASKS AFTER BOLTING: PERFORM: PERFORM THESE TASKS FOR EACH ELEMENT. <br /> r� i I <br /> ; , � DOCUMENT ACCEPTANCE OR REJECTION OF 9. INDICATED CONCRETE TESTING MEETS MINIMUM REQUIREMENTS FOR STRUCTURAL TESTING TO BE PROVIDED BY THE APPROVED QUAUFIED TESTING AND INSPECTING AGENCY. <br /> � 1705.2 AISC 360: TB N5.6-3 X <br /> I BOLTED CONNECTIO.NS ADDITIONAL TESTWG FOR CONSTRUCTION.CONSIDERATIONS ARE NOT INDICATED AND SHALL BE DETERMINED BY THE CONTRACTOR AND PROVIDED AT CONTRACTOR'S EXPENSE . <br /> � INSPECTION , <br /> � <br /> O SYSTEM or MATERIAL ' IBC CODE ' CODE or STANDARD FREQUENCY (NOTE 6) REMARKS ' ' <br /> " N ', . <br /> REFERENCE REFERENCE CONTINUOUS PERIODIC '� - <br /> � ; <br /> � o C�LD-FORMED STEEL FRAMING <br /> '� - � MATERIA�VERIFICATION OF WELD FILLER METALS X MANUFACTURER'S CERTIF(ED TEST REPORTS . <br /> � . <br /> � VERIFYING USE OF PROPER WPS'S 1705:2.2 SDI QA/QC X COPY OF WELDING PROCEDURE SPECIFICATIONS ', ' � . <br /> - ai VERIFYING WELDER QUALIFICATIONS X COPY OF QUALIFICATION CARDS ! . 2 �y <br /> � WELDED FRAMING CONNECTIONS AWS D1.3 SECTION 6 X ALL WELDS VISUALLY INSPECTED PER AWS D1.3 6.1 <br /> � � <br /> VERIFICATION OF DETAILS, MEMBERS, BRACING AND AWS D1.4 SECTION 7 X LOAD BEARING AND EXTERIOR WALL FRAMING <br /> o STIFFENERS - <br /> � ', <br /> � ,, <br /> , <br /> TESTING .: <br /> �' : : . <br /> � <br /> . - <br /> �' TABLE 3 - REQUIRED STRUCTURAL TESTING <br /> �� <br /> � TESTING ,� <br /> �n — SYSTEM or MATERIAL FREQUENCY REMARKS ', <br /> � IBC CODE CODE or STANDARD , <br /> o � REFERENCE REFERENCE CONTINUOUS PERIODIC �! <br /> z � GEOTECHNICAL � _ .. <br /> �--� � <br /> , � � , . <br /> a� , <br /> � � FILL IN-PLACE DENSITY OR PREPARED VARIES; MINIMUM PER �' . <br /> � SUBGRADE DENSITY IBC APPENDIX J107.5 X BY THE GEOTECHNICAL ENGINEER . ' , <br /> � , <br /> ' O � � <br /> / � VARIES� <br /> � C� 1705.6 CLASSIFICATION AND ', , <br /> � — MATERIAL VERIFICATION TESTING OF X BY THE GEOTECHNfCAL ENGINEER , � . <br /> U � CONTROLLED FILL ; <br /> � MATERIALS ' <br /> �-- � _ , � <br /> .� o CONCRETE , . , <br /> � ' . <br /> � <br /> � — :� <br /> � � EA 1 b0 CY NOR LESS <br /> J <br /> ~ J TMAN 5,000 SQUARE � <br /> ASTM C172 OBTAIN WHEN FRESH CONCRETE IS PLACED FOR EACH MIX ; <br /> � Q COMP�SIT� SAMPLES FEET OF SLABS AND <br /> � X ACI 318 26.12 DESIGN USED ., <br /> � O� WALLS, ONE SET PER , - <br /> � X DAY M I N <br /> (n � ' <br /> 1 CYL-7 DAYS <br /> (n , <br /> F <br /> NOTE 9 RE ER TO GENERAL NOTES F R T S <br /> O � T A G E. F O B Y <br /> . ( ) <br /> R6 <br /> I CONCRETE STRENGTH, UNO ASTM C39 3 CYL-TEST AGE � � <br /> — 1903 12-WCH CYLINDERS, 2 CYLINDERS AT TEST AGE IS PERMITTED. ' <br /> � m <br /> 1705.3 1 CYL - HOLD <br /> LO � ONE TEST PER <br /> � x CONCRETE SLUMP ASTM C143 AT POINT OF PLACEMENT <br /> �, C� COMPOSITE SAMPLE <br /> F-- I <br /> � � ONE TEST PER , <br /> CONCRETE A(R CONTENT ASTM C231 MIN ONE PER DAY <br /> o — COMPOSITE SAMPLE , <br /> � N , <br /> � N� ONE TEST PER ONE TEST PER HOUR WHEN AIR TEMP IS BELOW 40 DEG F OR ' <br /> � CONCRETE TEMPERATURE ASTM C1064 ', <br /> � � COMPOSITE SAMPLE ABOVE 80 DEG F , r <br /> � <br /> � — , <br /> � N ' Drawing No. . .� � <br /> , <br /> � � --- � D. ol � oraWn By oate S�A�E CO M M U N ITY TRAN S IT � . <br /> � � � — _ _ - 1601 ue, � �y� � �����aF wasy��,c p DYL 1 5 2017 C� <br /> / a� ' . � , . , . �, x ,, Designed BY Horiz �J <br /> � � � — ti w $so1 � � _ �. � f `�.�"� �� � 1 � :Y PERMIT SET c�s , 5 20,� SEAWAY TRANSIT CENTER <br /> ''�`^= Checked By Vert Sheet No. <br /> . � � -- _ www.kpff.com �'�'�����,�� ����?, � ,��,rraez�o � 1 JOS 1 5 2017 <br /> � X pp – � ss oxeL ��'�� ��g'` �i A CDO ed By 1 5 2017 Proje1 15 67mber X )( <br /> . No. Date Revision By A r. � S P E C I A L I N S P E C T I 0 N S <br /> � � <br /> of Total � � <br /> , , � � <br /> � ' ' � • <br />