|
RC-1 I �
<br /> —i
<br /> � —1"AIRSPACE W/INSULATION BAFFLE.
<br /> � / EXTEND 12 ABOVE INSULATION PER CODE
<br /> �� z
<br /> � 12 30R4 O
<br /> R-4'9 ' �PER ROOF PLAN
<br /> ��,�I'j���"l�`,i������ i; H
<br /> 8�-0�� ' � i i i � � �, � i�
<br /> �
<br /> ,,�
<br /> � � k� , �. � � �'��i��,
<br /> i P L H T � PRE-FIN 26 GA. �
<br /> DBL 2x6 ' �� �
<br /> 1/2" GWB ---__;' , -----
<br /> ' ! TOP PL METAL GUTTER
<br /> � � � 18"-24" oi zX cE�AR FAscia BUILDING CONSTRUCTI4N i A
<br /> � �H , � m
<br /> ,4x MIN. HDR U.N.O at all ; � i ROOF/CEILING ASSEMBLY m p
<br /> �openings. Flex Flashing at ' � j RC-� Z �
<br /> I Sill, Jamb and heads , COMPOSITION ROOFING
<br /> -- - ---- � ' 30# ROOFING FELT � �
<br /> � ! O/ 1/2" CDX PLYWD (APA RATED) }
<br /> �� � i O/2x6 RAFTERS @ 24"oc u.�
<br /> � � & 8x15 GLB PER PLAN �
<br /> R�-� �W������ `� W/ R49 BATT INSULATION (Heated) w
<br /> L---,—� 2nd LEVEL � ; 6 MIL VAPOR BARRIER Q
<br /> � � O/ 1/2" GWB � .
<br /> � I � �
<br /> I� � c W
<br /> 2 ;Dwellin ara e FIRE SEPARATION l � `Q
<br /> 3 9/9 9 EXTERIOR WALL ASSEMBLY I'
<br /> � �� �
<br /> ' �_ " . " D SUBFLR EW-1
<br /> R30 Batt Insulation pp _g g I (GLUE AND SCREW) �' Rim board cont.1-1/8" LP Solid Start OSB Z
<br /> I 5/8 TYPE X GWB a lied to CEILING ara e side' 3/4 PYLW ` l „ • . • . FINISH PER ELEVATIONS '
<br /> , or 1-1/4 LVL rEm bd. Rim�oists shall be TYVEK HOUSE WRAP OR EQ.
<br /> � _ insulated and include the air barrier �
<br /> � , . � � � ���� _�' O/ 1/2"APA RATED PLYWD SHEATHING
<br /> �� � , , ,r�� ; , _
<br /> 109-118" � ,=�� 9'-0" ',�����t�c������� _' '��� oi 2Xs �voo� sTuos @ �s° oc Z
<br /> ------------- ------- '
<br /> � � PL HT W/ R-21 BATT INSULATION (� p
<br /> .
<br /> W/ 1/2" GWB fJ� N �
<br /> ' DBL 2x6 PRE-FIN 26 GA. 1/2" GWB
<br /> TOP PL METAL GUTTER =_=� �B� ; �,�.J 00 � `
<br /> O/ 1x8 CEDAR FASCIA TOP PL APPROVED VAPOR RETARDER � FLOOR ASSEMBLY � Z O) — �
<br /> 18��-24° _ WILL BE PROVIDED ON THE WARM � F-1 FRAMED (DWELLING) J J Q .� d-
<br /> OH � _ �W_1; SIDE OF INSULATION PER WSEC ; 3/4" PLYWD. SUBFLOOR (glued & screwed) Q � � � d"
<br /> - --- I 502.1.6.1, INCLUDING AT RtM JOIST — �d'
<br /> � O/ PRE-ENG. FJ per ptan �1 ,
<br /> AREAS WITHIN FLOOR ASSEMBLIES i W/ R30 BATT INSULATION (heated) z � W v�
<br /> STORAGE DWELLING - �' F-2 SOG (GARAGE) `° p �` _� ��
<br /> PT 2x6 SILL PLATE W/5/8"dia.A.B. �
<br /> 1 st LEVEL — EMBEQ Mw,°INTO CONC.& 4" CONCRETE SLAB W — �' �
<br /> --- ----��/-�'; _ iN►THIN 12"OR SILL ENDS w/6x6 10/10 WWM , � W (V � �f �
<br /> �____ w�s^xs��x1/4°STL WASHERS o/MIOSTOP ULTRA 6 VB (OR EQ.) ! � � Cfl � �
<br /> SPACING PER PLAN � o/4" CRUSHED WASHED GRAVEL a �
<br /> ; NON-POURUS SILI.SEALAND , r n �
<br /> ; ' CAPILLARY BREAK ____ __--- - ____ _----------- � v C � '
<br /> F-1 ,
<br /> .c
<br /> PT 2x6 SILL PLATE W/ 1/2" dia. x10" -- ---' z W
<br /> ANCHOR BOLT. EMBED MIN 7" INTO ' _- �-+
<br /> CONC. & WITHIN 12" OR SILL ENDS - �
<br /> W/3"x3"x1/4" STL WASHERS T.O. SUBFLR �
<br /> SPACING PER PLAN -- - ---. CRAWLSPACE vENTS �
<br /> �� �R3O� . @ RIM JSTS
<br /> I F-2 !
<br /> ' REINFORCING (n
<br /> i� FIt1. G1'. per dtl this sheet (.j�
<br /> + � �
<br /> - - � � � � � -�-� o .
<br /> 0°� ' l-'� � ALL REINFORCEMENT MUST BE � � N
<br /> ALL REINFORCEMENT MUST BE '
<br /> TIED INTO PLACE FOR ' TIED INTO PLACE FOR � — ��
<br /> FOUNDATION INSPECTION REINFORCING 16��
<br /> 6 MIL. BLACK VAPOR BARRIER- FOUNDATION INSPECTION � �' ,� �
<br /> OVERLAP 12", TAPE SEAMS
<br /> per detail CONT. UP WALL = � � Q
<br /> �-- L °' �
<br /> � �
<br /> � � � a�
<br /> __-_ m � � �
<br /> NOT USED TYP. WALL SECTION @ STORAGE �� TYP. 2 STORY DWELLING WALL SECTION � '� W �
<br /> A � ------- -- - ---- - ---- -- _ __ _- ___ _-___ _ _ _ _____ __ ___ ---- ----- � , B ___ __ _._ _ __ _ -- _ _ ___ _- ;; C - -- � .
<br /> � �
<br /> �
<br /> - _
<br /> BLOCKING BTWN
<br /> JOISTS @ BEAM
<br /> w/ 16d TOE NAILS
<br /> EXTERIOR WALL @ 8"oc TO BEAM
<br /> ap 3"
<br /> (R-21) BOTTOM z .
<br /> r� � ` � � �� �� � � � � �
<br /> PLATE r'� 1 � � � i , �' � ( �
<br /> RIM JOIST 1 � ti � � � � i � i � j i ,
<br /> PROVIDE INSULATIO � � � � ' I I � 1 i � ' �� ' I � � � � � F •
<br /> I�.�b� , � , '� cn
<br /> �
<br /> , �� �� ; � � , � 1 � � �, i � � � � � , � � `� � � � � �J,��r� �lairli 30
<br /> � �� � 1 ' � � n ��.;�_.! :� 1� � �' !.�! L�� � , �� �J �J ,_J U �� f��; ; � ' ; ; � ) Siding product ��2" EXpat1S1011 �011lt � �
<br /> ' --- --------—-__. � I i `
<br /> � � I �
<br /> Z II � — � �C �X �- ,PT 2x6 SILL PLATE _J (� `� � �-J, Beam �_ { ck n Tuck corrision resistant U �"'♦
<br /> � � •�i'� � -' Beam BEAM JOINT B o @ Bear g metal flashing under siding �'�"� Q
<br /> ,. � ,W/5/8" dia. x10" WHERE OCGURS °
<br /> � --- (2� #4 TOP 8� BO 'ANCHOR BOLT. EMBED _ ' #4 TOP& BOTT ax PT PosT -,,,_ 1" min, @ wood 4 a a° ° �� ° � W
<br /> y MIN 7" INTO CONC. & C° - -- - '---Positive connection � s ope s a ° a ° ° a ° cri _J
<br /> � -- --#4 @ 48" oc EW ,WITHIN 12" OR SI�L ENDS , • � � ;CRAWLSPACE; � PT Posr PER P�AN z Note: �
<br /> �Thickened edge slab. � � � ° � �- z � �
<br /> - -� CRAWLSPACE cap and base per � 15#felt installed btwn ;
<br /> = i �W/3"x3"x1/4" STL WASHERS. — — : , ; ,3; �, ! Slope conc. away -
<br /> I =���—)��—��� ` �� code -
<br /> ° from bldg. 1/4 per ft. _ a z
<br /> � — — -- #4 @48 oc EW ` . oo concrete and wood Asphalt 15# -' . �' „ o � ° a ° I-W- Q
<br /> E �SPACING PER PLAN �- = 1=1 I 1=1 I 1=1(1=1 ��
<br /> . � — 6 ° W/ Hook � � 4 O
<br /> _ i ' -------- -- -- ------- _ -111-111 — -11 . , max. slope @ landings a
<br /> � ` � �_. ____ 2 #4 BARS CONT. oo a w a � ,
<br /> --� � � I=I I I— � . 6 MIL. BLACK POLY U .
<br /> ENTIRE FOOTtNG. = �. � • 6 MIL. BLACK POLY VB FOOTING ---- VAPOR BARRIER Q � Corrosion Resistant Metal _ a aa ° W
<br /> 3" MIN.ABOVE BOTT • . a ' a ' ' � OVERLAP 12°,TAPE SEAMS Per Plan y flashing over 15#felt installed i� a W
<br /> OF FTG ° cotvT. uP wa�� 3 between conc. and wood � _
<br /> 16" � ,� w i � 3" MIN CLR 3" MIN CLR � • (1 ) No. 4 Bar �
<br /> 16 ftg
<br /> (2)#4 BOT. EA. WAY v 1 O��
<br /> ALl REINFORCEMENT MUST BE T�ED INTO '— (2)#4 BARS HORtZ. (2)#4 BOTT EA. WAY EXTERIOR HOCIZ.
<br /> PLAGE FOR FOUNDATION INSPECTION
<br /> ENTIRE FOOTING. DATE :
<br /> 3" MIN.ABOVE BOTT
<br /> OF FTG
<br /> - TURNDOWN at GARAGE DOOR �2/30/2018
<br /> 1 STEM WALL DETAIL HOUSE FOOTING 3 � POST & BEAM OPTIONAL POST & BEAM DETAIL _ 4 WD to CONC SEPARATION 5 __ _
<br /> _ 2 / � _ .
<br /> Structural Engineering Details on S- sheets take precendence ��
<br /> SHEET:
<br /> CITI( OF EVEREl"T
<br /> ����E�E� Fo� P����� A5 . 1
<br />
|