GENERAL NOTES • � • � �
<br /> THE GENERAL CONTRACTOR SHALL FULLY COMPLY WITH THE 2012 IRC AND ALL � � .
<br /> ADDITIONAL STATE AND LOCAL CODE REQUIREMENTS.
<br /> 2012 IEC, 2012 IMC AND 2012 IPC SHALL BE USED.
<br /> THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ANY WORK
<br /> KNOWINGLY PERFORMED CONTRARY TO SUCH LAWS, ORDINANCES, OR
<br /> REGULATIONS. THE CONTRACTOR SHALL ALSO PERFORM COORDINATION WITH
<br /> ALL UTILITIES AND STATE,COUNTY AND CITY AUTHORITIES.
<br /> THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND PROPER Seattle
<br /> FUNCTION OF PLUMBING, HVAC AND ELECTRICAL SYSTEMS. THE GENERAL Whidbey Island
<br /> CONTRACTOR SHALL NOTIFY THIS OFFICE WITH ANY PLAN CHANGES REQUIRED
<br /> FOR DESIGN AND FUNCTION OF PLUMBING, HVAC AND ELECTRICAL SYSTEMS.
<br /> P.O. Box 665 Freeland
<br /> WILLIAM PAGE ARCHITECTS SHALL NOT BE RESPONSIBLE FOR CONSTRUCTION Washington 98249 f
<br /> MEANS AND METHODS, ACTS OR OMISSIONS OF THE CONTRACTOR OR 206-283-8317
<br /> SUBCONTRACTOR, OR FAILURE OF ANY OF THEM TO CARRY OUT WORK IN
<br /> ACCORDANCE WITH THE CONSTRUCTtON DOCUMENTS. AND DEFECT 360-341-1958
<br /> DISCOVERED IN THE CONSTRUCTION DOCUMENTS SHAL� BE BROUGHT TO THE pagearch@whidbeyisland.com
<br /> ATTENTION OF THIS OFFICE BY WRITTEN NOTICE BEFORE PROCEEDING WITH WORK. WWWWilliampagearchitects.com
<br /> REASONABLE TIME NOT ALLOWED THIS OFFICE TO CORRECT THE DEFECT SHALL Issue/Revisions
<br /> PLACE THE BURDEN OF COST AND LIABILITY FROM SUCH DEFECT UPON THE No. Date Comments
<br /> CONTRACTOR.
<br /> THE BUILDER SHALL VERIFY THAT SITE CONDITIONS ARE CONSISTENT WITH THESE
<br /> PLANS BEFORE STARTING WORK. WORK NOT SPECIFICALLY DETAILED SHALL BE
<br /> CONSTRUCTED TO THE SAME QUALITY AS SIMILAR WORK THAT IS DETAILED. ALL •
<br /> WORK SHALL BE DONE IN ACCORDANCE WITH INTERNATIONAL BUILDING CODES
<br /> AND LOCAL CODES.
<br /> SPECIAL INSPECTOR QUALIFICATIONS: DEMONSTRATE COMPETENCE, TO THE
<br /> SATISFACTION OF THE BUILDING OFFICIAL, FOR INSPECTION OF THE PARTICULAR
<br /> TYPE OF CONSTRUCTION OR OPERATION IN QUESTION. PRIOR TO THE BEGINNING
<br /> OF CONSTRUCTION, REVIEW THE SPECIAL INSPECTION REQUIREMENTS WITH THE
<br /> ARCHITECT, ENGINEER, BUILDING OFFICIAL, GENERAL CONTRACTOR AND
<br /> SPECIAL INSPECTORS.
<br /> DUTIES OF THE SPECIAL INSPECTOR INCLUDE, BUT ARE NOT LIMITED TO:
<br /> OBSERVE THE WORK FOR CONFORMANCE WITH THE APPROVED PERMIT .
<br /> DRAWINGS AND SPECIFICATIONS. BRING DISCREPANCIES TO THE IMMEDIATE � _
<br /> DRAWING NOTES: ATTENTION OF THE GENERAL CONTRACTOR FOR BUILDING OFFICIAL.
<br /> FURNISH INSPECTION REPORTS FOR EACH INSPECTION TO THE BUILDING OFFICIAL,
<br /> RENDERINGS ARE NOT TO SCALE; ALL RENDERINGS ARE FOR ARTISTIC DEPICTION ARCHITECT, ENGINEER, GENERAL CONTRACTOR AND OWNER IN A TIMELY
<br /> ONLY. PLAN UPDATES MAY NOT BE REFLECTED IN RENDERINGS. RENDERINGS MANNER.
<br /> SHALL NOT BE USED FOR CONSTRUCTION. SUBMIT A FINAL REPORT STATING WHETHER THE WORK REQUIRING SPECIAL
<br /> INSPECTION WAS INSPECTED, AND WHETHER THE WORK IS IN CONFORMANCE
<br /> THE FOLLOWWG DOCUMENTS REQUIRE THAT SOME ASSUMPTIONS BE MADE WITH THE APPROVED PERMIT DRAWINGS AND SPECIFICATIONS.
<br /> CONCERNING THE SITE ,UTILITIES AND THE BUILDINGS. THE CONTRACTOR SHALL DUTIES OF THE GENERAL CONTRACTOR INCLUDE, BUT ARE NOT LIMITED TO: •
<br /> VERIFY ALL EXISTING CONDITIONS AND REPORT ANY DISCREPANCIES PRIOR TO NOTIFY SPECIAL INSPECTOR THAT WORK IS READY FOR INSPECTION AT LEAST 24
<br /> CONTINUING WORK.
<br /> HOURS BEFORE THE INSPECTION IS REQUIRED.
<br /> WRITTEN DIMENSIONS ON THESE DRAWINGS SHALL HAVE PRECEDENCE OVER MAINTAIN ACCESS TO WORK REQUIRING SPECIAL INSPECTION UNTIL IT HAS BEEN �
<br /> SCALED DIMENSIONS. THE GENERAL CONTRACTOR SHALL VERIFY AND IS OBSERVED AND INDICATED TO BE IN CONFORMANCE BY THE SPECIAL INSPECTOR
<br /> RESPONSIBLE FOR ALL DIMENSIONS (INCLUDING ROUGH OPENINGS) AND AND APPROVED BY THE BUILDING OFFICIAL.
<br /> CONDITIONS ON THE JOB AND MUST NOTIFY THIS OFFICE OF ANY VARIATIONS PROVIDE THE SPECIAL INSPECTOR WITH ACCESS TO APPROVED PERMIT
<br /> FROM THESE DRAWINGS. DO NOT SCALE DRAWINGS, IF A DIMENSION IS MISSING DRAWINGS AND SPECIFICATIONS AT THE JOB SITE.
<br /> CONTACT ARCHITECT. MAINTAIN JOB-SITE COPIES OF ALL REPORTS SUBMITfED BY THE SPECIAL
<br /> INSPECTOR.
<br /> WRITTEN DIMENSIONS AND SPECIFIC NOTES SHALL TAKE PRECEDENCE OVER DEFINITIONS:
<br /> SCALED DIMENSIONS AND GENERAL NOTES. THE ENGINEER/DESIGNER SHALL BE �� REQ�ST�
<br /> CONSULTED FOR CLARIFICATION IF SITE CONDITIONS ARE ENCOUNTERED THAT CONTINUOUS INSPECTION: THE SPECIAL INSPECTOR IS OBSERVING THE WORK
<br /> ARE DIFFERENT THAN SHOWN, IF DISCREPANCIES ARE FOUND IN THE PLANS OR REQUIRING SPECIAL INSPECTION AT ALL TIMES.
<br /> NOTES, OR IF A QUESTION ARISES OVER THE INTENT OF THE PLANS OR NOTES. PERIODIC INSPECTION: THE SPECIAL INSPECTOR IS ON SITE AS REQUIRED TO
<br /> CONFIRM THAT THE WORK REQUIRING SPECIAL INSPECTION IS IN � '� � j�-
<br /> CONTRACTOR SHALL VERIFY AND IS RESPONSIBLE FOR ALL DIMENSIONS A��
<br /> (INCLUDING ROUGH OPENINGS). CONFORMANCE.
<br /> THE INTENT OF THE CONSTRUCTION DOCUMENTS IS TO INCLUDE ALL ITEMS THIS STRUCTURE SHALL BE ADEQUATELY BRACED FOR WIND LOADS UNTIL THE
<br /> NECESSARY FOR THE COMPLETION OF WORK. WORK NOT COVERED IN THE ROOF, FLOOR AND WALLS HAVE BEEN PERMANENTLY FRAMED TOGETHER AND
<br /> CONSTRUCTION DOCUMENTS WILL NOT BE REQUIRED UNLESS IT IS REASONABLY SHEATHED.
<br /> INFERRED AS BEING NECESSARY TO PROVIDE THE INTENDED RESULTS. WRITTEN THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION AND
<br /> SPECIFICATIONS AND GENERAL REQUIREMENTS SHALL HAVE PRECEDENCE OVER COORDINATION OF OTHER SUB CONTRACTORS TO SECURE COMPLIANCE OF
<br /> DRAWINGS. DAMAGED OR DEFECTIVE WORK OR MATERIAL SHALL BE DRAWINGS AND SPECIFICATIONS AND THE ACCURATE LOCATION OF
<br /> IMMEDIATELY REPAIRED OR REPLACED TO THE APPROVAL OF THE ARCHITECT STRUCTURAL MEMBERS AND OPENINGS FOR MECHANICAL,ELECTRICAL,STAIRS '
<br /> AND AT NO ADDITIONAL COST TO THE OWNER. AND ALL OTHERS ITEMS.
<br /> ALL DIMENSIONS ARE TO FACE OF STUDS,MASONRY OR CONCRETE UNLESS CONTRACTOR SHALL NOTIFY OWNER,ARCHITECT AND LOCAL BUILDING
<br /> NOTED OTHERWISE. OFFICIALS AT CRITICAL MILESTONES AS ESTABLISHED BY LOCAL MUNICIPALITY
<br /> CROSS SECTIONS AND DETAILS SHOWN DO NOT NECESSARILY INDICATE ALL LIKE AND AS SHOWN IN THESE DOCUMENTS IN ORDER TO OBTAIN NECESSARY
<br /> CONDITIONS AND DO NOT LIMIT THE APPLICATION OF ANY DRAWING,SECTION APPROVALS PRIOR TO COMMENCEMENT OF FURTHER WORK.
<br /> OR DETAILS THAT MAY APPLY TO OTHER SAME OR SIMILAR CONDITION NOT
<br /> REFERENCED. GENERAL NOTES
<br /> THE ARCHITECT IS NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY
<br /> PLEASE SEE ADDITIONAL NOTES CALLED OUT ON OTHER SHEETS. PRECAUTIONS,MEANS,METHODS,TECHNIQUES,SEQUENCES OR
<br /> PROCEDURES. THE PERIODIC SITE VISITS BY THE ARCHITECT OR ENGINEER ,
<br /> THE SURVEY INFORMATION HAS BEEN SUPPLIED BY LICENSED SURVEYOR. SHALL NOT BE CONSTRUED AS SUPERVISION OF CONSTRUCTION NOR
<br /> WILLIAM PAGE ARCHITECTS DOES NOT TAKE ANY RESPONSIBILITY FOR ANY RESPONSIBLE FOR PROVIDING A SAFE PLACE FOR WORK BY THE
<br /> ERRORS OR OMISSIONS. CONTRACTORS EMPLOYEES, OR EMPLOYEES OF SUPPLIERS OR
<br /> SUBCONTRACTORS,OR FOR ACCESS,VISITS,USE,WORK,TRAVEL, OR
<br /> BUILDING PERFORMANCE: OCCUPANCY BY ANY PERSON.THE CONTRACTOR SHALL TAKE ALL
<br /> REASONABLE PRECAUTIONS FOR THE SAFETY OF AND PROTECTION TO
<br /> HEAT LOSS CALCULATIONS SHALL COMPLY WITH THE REQUIREMENTS OF PREVENT DAMAGE,INJURY OR LOSS TO: EMPLOYEES AND ALL OTHER
<br /> REGIONAL AND LOCAL CODES. SEE CALCULATIONS. PORCHES, DECKS, AFFECTED PERSONS,ALL WORK, AND MATERIALS AND EQUIPMENT, OTHER
<br /> FOUNDATION, FIREPLACE ENCLOSURES, AND GARAGE AREAS NOT INCLUDED IN PROPERTY AT THE SITE OR ADJACENT PROPERTY.
<br /> LIVING AREA. ALL EXHAUST FANS TO BE VENTED DIRECTLY TO THE EXTERIOR. ALL
<br /> PENETRATIONS OF THE BUILDING ENVELOPE SHALL BE SEALED WITH CAULK OR HOMEOWNER WILL TAKE NECESSARY PRECAUTIONS TO REMOVE OR RELOCATE
<br /> FOAM. ITEMS OF VALUE TO BE REUSED AND/ OR SAVED, OR IN ANY DANGER OF BEING
<br /> DAMAGED DUE TO CONSTRUCTION PROCESS. Copyright 20�9 wi��iam Page,4rchitects ,
<br /> INSTALL FOAM TYPE INSULATION AT FLOOR AND PLATE LINES, OPENINGS IN Project
<br /> PLATES, CORNER STUD CAVITIES AND AROUND DOOR AND WINDOW ROUGH Residence
<br /> OPENING CAVITIES. THESE DRAWINGS ARE THE PROPRIETARY WORK PRODUCT AND PROPERTY OF 2609 - Chestnut Street
<br /> WILLIAM PAGE ARCHITECTS,DEVELOPED FOR THE EXCLUSNE USE OF WILLIAM
<br /> INSULATE ALL ACCESS DOORS/ HATCHES TO ATTICS TO R48, CRAWL SPACES PAGE ARCHITECTS.USE OF THESE DRAWINGS AND CONCEPTS CONTAINED Everett, Washington
<br /> EQUAL THE WALL,FLOOR RATING. THEREIN WITHOUT THE WRITTEN PERMISSION OF WILLIAM PAGE ARCHITECTS IS Sheet Title
<br /> PROHIBITED AND MAY SUBJECT YOU TO A CLAIM FOR DAMAGES.
<br /> GRADING NOTES:
<br /> General Notes
<br /> CONTRACTOR TO VERIFY LOCATION OF ALL EXISTING UTILITIES.
<br /> PROVIDE POSITIVE DRAINAGE AWAY FROM BUILDING. SITE PLAN NOTES
<br /> Project No. 2019-10 �
<br /> FINAL GRADE TO CONVEY SURFACE DRAINAGE TOWARDS DOWN HILL. Date 02/02/2019
<br /> Scale AS NOTED
<br /> AREAS TO BE FILLED SHALL BE CLEARED, GRUBBED TO REMOVE TREES, CALL BEFORE YOU DIG: Drawn By WJP
<br /> VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL AND STRIPPED OF Checked By WJP
<br /> TOPSOIL. Sheet
<br /> N otes N otes N otes N otes N otes A-3
<br /> of 10 Total Sheets