Laserfiche WebLink
JAN-09-2008 WED 10�22 RM HWA CEOSCIENCES FAX N0, 4257742714 P. 02/03 <br /> R��}� i9770W'hAvcnucWest,5uie209 FieldRcportNo.: fR•032 <br /> � ►1 .��!; �y;�m.�od,wa !+ecr Date(mmlddlyy): 1l8/2008 <br /> Ni� T�;.szs�na-0ioc HWA Project No.: 200'1-066-23 <br /> ����/�GFOSCIF,NCESINC. F,r.�zsavs�z7i, HWATaskNo.: <br /> mir.l a�na '�—� acaconar rC'.:0 lO�htl arnu c. <br /> G�rfield f:S AqudCmizalion Everett,WA <br /> ����,t �em Bpresennrve eef+fr-� <br /> Ever=tt Sclinol Oistrict Bob Crafts OvercasUCo!d <br /> JFy�nA�.�;��.pc1y(cn�i'1eCfG'a':hl.ciclmcc:d) Oe:�pnRum�myReD'e:e�imive MWAP:c�ec:Manager <br /> D kem:,n Tim Twietmever Ton Martin <br /> y------ <br /> Gc�r•r�Y C^n.rarJm Conen.Ccnttaclor Rrpre:tnlitwc hRYA Fa.0 Fep�ecerlanvn <br /> Spee l"lest Constructioo Mike Linn Jessica Herrcra <br /> ' FIELD REPORT <br /> SUMMARY OF�ICLD'fIME SPENT ON PROJECT TODAY: <br /> Fir,l Si(r,Vi;;iC St�rt'f ravel:0830 Arrived at Sile;0900 Departed Sile: 1000 End 7ravel: North Middlc School <br /> ACI�IVI lY f3t2WG INSf ECTFD:Compaction of CSTC inaterial for use as parking lot base. ~ <br /> GENEf:/�L LOCATION:The temporary tum-amund in west pa•king lot from Grid Lines 3 to 7 south oi Building 100. <br /> OCTAII F:b I.00�TION:The specific lacations and elevations lesled are summarized on the attached'Field Compadion <br /> Tesl Re��on'. <br /> �fYPL'OF It�SPECTION: Pcriodic <br /> UCTl11LS C>� Pt_�CEMENT OF THIS MATERIAL: Based on info�mation provided by the contractor, materials were <br /> placed in a�proxim�+tely 5"lifls(uncompactcd thickness)and compacteA with a 3-ton double smooth drum vibratory <br /> rolicr. <br /> HWA INSPCCTION ACTIVITI[S RELA7ED 70 THIS ITEM: HVJA carried out visual obse:valion and compaction <br /> iesting. HWA did nol observo either the lik placement or lhe compaclion application prior lo testing. Test results are <br /> summa�iTe:l on ih�aliaciied 'Field Compaction Tesl Report'. <br /> CUNFURMANCE OF THIS ITEM:To the best o`Ihe inspeclor's knowledge, the item inspected was found in <br /> r,nnfonnonce wilh approved plans, specificalion;and RFIS, Cxcepl for the following i�em. <br /> To��l Groz ch,ir�cabic io lhis joh is 2.0 hours induding lhe writing oi this repori. <br /> MfSCELLANEOUS ACTIVITIES, 085ERVATIONS AND/OR COAIMENTS: The initial rcason for the visit today was to <br /> witness tiir,inslallalion of H02A liold-downs along Grid 10 From A to F in building 100. Howevcr, afler arriving I was <br /> informed Ihc wron�Hold-downs had been shipped to the job sile. This activity has been rescheduled for 1300 on <br /> 1I912UGR. <br /> 'fhe bi crer.o way(fulure ciass rooms)in Building 100 has heavy duty visqueen and wire mesh covering G"of dense <br /> CS�C malr.ri�il pl�ic ment in prepa aty�n of cast-in-piace concrole slab. <br /> F <br /> .._I--—_. T____.. <br /> SIGNATURE�S; <br /> , <br /> Signed: � � Reviewed: � —�� <br /> HW� Fic(d epresenlative � HWA ProjeG Engineer or Reviewcr <br /> Sur�nMnrY oF NRESOLVED ISSU[S � <br /> ReporGl Ilemtt �taUis <br /> FR-017 1 Unresol��ed: Note 11 on S1.7 states all full penetration welds arc to bc UT inspecled. 7he <br /> co:itraclor waMs lhc engineer to visually assess and approve. <br /> The lhir.kness of the Led�er angle does not lend itself to Ullrasonic testing. <br /> Engin�er to adviee. <br /> FR•019 1 Unreso;ved:The conlractor lias elecled to t�+eld lhe Bar Joist to the W12's and W16's upper <br /> ilar�gc in licu of KI6.1 typicat delail. <br /> FR-0�1 1 Unresolveu: Same as unresolved ilem abovc on FR-019. <br /> FR•024 1 Unresolved: Re-compacl and retest lo verify compliance with contract documents. <br /> FR-032 1 Unresolvcd: Racomoact material lo meet the minimum 95% of ASTM D1557 Modi ied Proclor. <br /> 'ircn: ::l_'.�•.�. I:nlytc:c:�¢E�'"caln:uc.trclp. Rroo�isnott•.slu^Ids�gnp�pyM'd:AGN�1�t:«:?nl;.lkC0�d11lYAmicnc:. Pa9P. � 0�2 <br />