My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2215 PINE ST Geotech Report 2018-01-02 MF Import
>
Address Records
>
PINE ST
>
2215
>
Geotech Report
>
2215 PINE ST Geotech Report 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:16:27 PM
Creation date
3/12/2020 10:41:45 AM
Metadata
Fields
Template:
Address Document
Street Name
PINE ST
Street Number
2215
Address Document Type
Geotech Report
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEP-17-2007 MON 04:42 PM HWA GEOSC[ENCES FAX N0. 4257742714 P. 02 <br /> �W o �0 3 or5 <br /> ' R�� ior,�c<an�enuewests�iozoa FieldReportNo.: FR-006 <br /> � 1 �•�; Lyr.R:motl.WA 9:0?6 Date(mm/ddlyy): 911 712 2 0 7 <br /> rEi.azsne.oioa HWA Project No.: 2007-066-23 <br /> �'I.WAGEOSC�L'NCF.SINC. r�..azs-na�z�in HWA7askNo.: <br /> foJe4{N;lpu o:±fioflC � OiC50o ra�e- ellnp o. <br /> Garfield F.5 Nodcrnization Everett,WA <br /> G ent �— ..uen; eF�esentnLvc ca r <br /> Everel! School Dis!rict Bob Crafts OvercasUDrizzle/Cool <br /> ❑e;ngnA�.Uinrly(cnpinccrore:Wtcc;o�rccor0) Oes�gnAUlwYrykeD'e:entalivc HWAProjeqMsne�r <br /> D�keman Tim Twietme er Ton Marlin <br /> Gepcal CoM�clO� Ger,c;al Cen:racior pprt:.enWlrve M1YA FCItl Fcpre;en!niNe <br /> 7ony Martin <br /> FIELD REPORT <br /> SUMh4ARY OF FIELD TIME SPENT ON PROJECT TODAY: <br /> First Sitc Visit: Start Travel: 0615 Arrived at Sita:OG45 Deparled Sile: 1145 End 7ravel; 1215 <br /> ACl'IVI TY BEING INSPEC7Ep; Class B Asphaltic Conerelo Pavement delivery, placement,and compaction. <br /> GENEF'J1L L.00ATION� F.:astem half of Soufh Parking Lot along 23rd Street. <br /> DE7NLED LOCATION�"i he specific locations and elevations tested�re summari2ed on the atiached'Fieid Compaclion <br /> Test Feport'. <br /> 'fYf'k OF INSPECTION: Continunus <br /> DETnILS OF PI.ACEA1[N7 OF THIS MATERIAL:'fhe paving was placed using:�self-propelled paving machine. <br /> Olympic Paving p;aced a single 2"lift across the easlem half of the south parking lot and drive lhrough. Compaction <br /> �vas applied usin�n 5-toii double smooth drum vibratory steel roller for break down rolling, intcrmediate rolling and inish <br /> rullinr�. Tho Class b Asplialtic Concrele tvas supplied by Wilder Consiruction on Smilh Island. <br /> IaWA INSP[CTION ACTtVITIES RELATED 70 THIS ITEM: Due to Class B asphalt mix showing up on the job site, <br /> Jerry Rt,smussen of Spea West Construction called Tom Kcarns of DOWL Engincers to acquire aulhorization to use <br /> Class 8 Asphallic Concrete in place oi the HMA 1l2"PG•�4-22 as called out in Ihe drawings. Tom Keams authorized <br /> lhe su�slilulien. HWA carried out visual observation, periodic femperature monitoring, and compaction iesling of lhe <br /> compleletl paving. Compaction test results are summarized on the aHached 'Field Compaction 7est ReporC. A sampie <br /> of Ihe paving mix was obtained from fhe paver on sile(designated AC-1). Approximalely 140-tons of Class B Asphallic <br /> Concrclr.:was pface and compar,�ed over Ihe easlem half of the soulh parking lot loday. The lemperature tor the paving <br /> mix on arrival to the job site wa:; 270°F•285°F. <br /> CONFORMANC� OF THIS ITEM:To lhe best oi the inspector's knowledge, the Asphallic Concrete inspected was <br /> found in contormance wilh approved plans, specificalions, RFIs and/or engineers approval, <br /> MISCEI.I.ANEOUS AC7IVITI[;i, OBSERVAI'IONS ANDlOR COMM[NTS: <br /> Priqr lo lfie commencement o(paving, Jerry Rasmussen of Spee West Conslruction and myseli randomly checked the <br /> lhickness of lhe CSTC m3lerial in place across lhe proposcd parking IoL Belween 1I41h to 113rd of the parking lot fails <br /> to meet the required 4"minimum o(crushed aggregale. The areas lacking the rcquired 4"of CS7C matcrial varied in <br /> thicknPs,from 2" to 3,5"and are randomly spaced. Jerry of Spee West Construclion failed to mention tho random <br /> areas in lhe proposed parking lot lackinc� the required 4"IiH of CSTC during his phone conversation with the cngineer <br /> carlier in lhe day. Jcrry elected to allow paving to take place knowing the risk. <br /> 7olal limc chargeable to fhis job is 7.5 hours includinc� the writing o(this report. <br /> , <br /> SIGNATURES: <br /> ,�/�� i <br /> Signed� �J�� __�G�it�G�--• __._, Reviewcd: �� _ <br /> HWA Field 12e " sent�tivc HWA ProJecl Engineer or Reviewer . <br /> SUMMARY OF UNRESOLVED ISSUES <br /> Repori,", IlemJ� Stalus <br /> FR-OOG 1 Unresolved:A random check of�he CSTC material lhickness throughout lhe eastem half oi the <br /> soulh parking lot showcd between 1/4 to �/" of thc CSTC thickness to be Icss than <br /> Ihr rcauired 4"(actual?."l0 3.5"1. <br /> 'll�u rcpoa c�oui�onry 6e reprrxl�r..;;In II,e�dncly. RcW.'.�s no:f��l u�lil tl^,n�U Dy HVlA ficld�e;resen�!rve an!HWA fEv:Cwcr. Pa90 � 0�3 <br /> �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.