Laserfiche WebLink
SEP-17-2007 MON 04:42 PM HWA GEOSC[ENCES FAX N0. 4257742714 P. 02 <br /> �W o �0 3 or5 <br /> ' R�� ior,�c<an�enuewests�iozoa FieldReportNo.: FR-006 <br /> � 1 �•�; Lyr.R:motl.WA 9:0?6 Date(mm/ddlyy): 911 712 2 0 7 <br /> rEi.azsne.oioa HWA Project No.: 2007-066-23 <br /> �'I.WAGEOSC�L'NCF.SINC. r�..azs-na�z�in HWA7askNo.: <br /> foJe4{N;lpu o:±fioflC � OiC50o ra�e- ellnp o. <br /> Garfield F.5 Nodcrnization Everett,WA <br /> G ent �— ..uen; eF�esentnLvc ca r <br /> Everel! School Dis!rict Bob Crafts OvercasUDrizzle/Cool <br /> ❑e;ngnA�.Uinrly(cnpinccrore:Wtcc;o�rccor0) Oes�gnAUlwYrykeD'e:entalivc HWAProjeqMsne�r <br /> D�keman Tim Twietme er Ton Marlin <br /> Gepcal CoM�clO� Ger,c;al Cen:racior pprt:.enWlrve M1YA FCItl Fcpre;en!niNe <br /> 7ony Martin <br /> FIELD REPORT <br /> SUMh4ARY OF FIELD TIME SPENT ON PROJECT TODAY: <br /> First Sitc Visit: Start Travel: 0615 Arrived at Sita:OG45 Deparled Sile: 1145 End 7ravel; 1215 <br /> ACl'IVI TY BEING INSPEC7Ep; Class B Asphaltic Conerelo Pavement delivery, placement,and compaction. <br /> GENEF'J1L L.00ATION� F.:astem half of Soufh Parking Lot along 23rd Street. <br /> DE7NLED LOCATION�"i he specific locations and elevations tested�re summari2ed on the atiached'Fieid Compaclion <br /> Test Feport'. <br /> 'fYf'k OF INSPECTION: Continunus <br /> DETnILS OF PI.ACEA1[N7 OF THIS MATERIAL:'fhe paving was placed using:�self-propelled paving machine. <br /> Olympic Paving p;aced a single 2"lift across the easlem half of the south parking lot and drive lhrough. Compaction <br /> �vas applied usin�n 5-toii double smooth drum vibratory steel roller for break down rolling, intcrmediate rolling and inish <br /> rullinr�. Tho Class b Asplialtic Concrele tvas supplied by Wilder Consiruction on Smilh Island. <br /> IaWA INSP[CTION ACTtVITIES RELATED 70 THIS ITEM: Due to Class B asphalt mix showing up on the job site, <br /> Jerry Rt,smussen of Spea West Construction called Tom Kcarns of DOWL Engincers to acquire aulhorization to use <br /> Class 8 Asphallic Concrete in place oi the HMA 1l2"PG•�4-22 as called out in Ihe drawings. Tom Keams authorized <br /> lhe su�slilulien. HWA carried out visual observation, periodic femperature monitoring, and compaction iesling of lhe <br /> compleletl paving. Compaction test results are summarized on the aHached 'Field Compaction 7est ReporC. A sampie <br /> of Ihe paving mix was obtained from fhe paver on sile(designated AC-1). Approximalely 140-tons of Class B Asphallic <br /> Concrclr.:was pface and compar,�ed over Ihe easlem half of the soulh parking lot loday. The lemperature tor the paving <br /> mix on arrival to the job site wa:; 270°F•285°F. <br /> CONFORMANC� OF THIS ITEM:To lhe best oi the inspector's knowledge, the Asphallic Concrete inspected was <br /> found in contormance wilh approved plans, specificalions, RFIs and/or engineers approval, <br /> MISCEI.I.ANEOUS AC7IVITI[;i, OBSERVAI'IONS ANDlOR COMM[NTS: <br /> Priqr lo lfie commencement o(paving, Jerry Rasmussen of Spee West Conslruction and myseli randomly checked the <br /> lhickness of lhe CSTC m3lerial in place across lhe proposcd parking IoL Belween 1I41h to 113rd of the parking lot fails <br /> to meet the required 4"minimum o(crushed aggregale. The areas lacking the rcquired 4"of CS7C matcrial varied in <br /> thicknPs,from 2" to 3,5"and are randomly spaced. Jerry of Spee West Construclion failed to mention tho random <br /> areas in lhe proposed parking lot lackinc� the required 4"IiH of CSTC during his phone conversation with the cngineer <br /> carlier in lhe day. Jcrry elected to allow paving to take place knowing the risk. <br /> 7olal limc chargeable to fhis job is 7.5 hours includinc� the writing o(this report. <br /> , <br /> SIGNATURES: <br /> ,�/�� i <br /> Signed� �J�� __�G�it�G�--• __._, Reviewcd: �� _ <br /> HWA Field 12e " sent�tivc HWA ProJecl Engineer or Reviewer . <br /> SUMMARY OF UNRESOLVED ISSUES <br /> Repori,", IlemJ� Stalus <br /> FR-OOG 1 Unresolved:A random check of�he CSTC material lhickness throughout lhe eastem half oi the <br /> soulh parking lot showcd between 1/4 to �/" of thc CSTC thickness to be Icss than <br /> Ihr rcauired 4"(actual?."l0 3.5"1. <br /> 'll�u rcpoa c�oui�onry 6e reprrxl�r..;;In II,e�dncly. RcW.'.�s no:f��l u�lil tl^,n�U Dy HVlA ficld�e;resen�!rve an!HWA fEv:Cwcr. Pa90 � 0�3 <br /> �� <br />