Laserfiche WebLink
Run Date: 6/13/2019 City of Everett-Public Works Department Cutoff Date: 6/21/2019 <br /> Time: 8:27 AM Contract Estimate Voucher <br /> Project: 355 For Work Order#3659 Contractor: THOMCO CONSTRUCTION,INC. <br /> NORTH WETMORE STORMWATER Estimate#15 13700 44TH ST NE <br /> SEPARATION PROJECT <br /> WO 3659 BID:$3,395,788.65 LAKE STEVENS WA 98258 <br /> TOTAL BID:$3,395,788.65 <br /> Unit Plan Total Previous Present Total Previous Present <br /> item# Description Units Price Quantity Quantity Quantity Quantity Amount Amount Amount <br /> 0001 MOBILIZATION LS 325,000.00 1.00 1.0000 1.0000 0.0000 325,000.00 325,000.00 0.00 <br /> 0002 SURVEY LS 14,400.00 1.00 1.0000 1.0000 0.0000 14,400.00 14,400.00 0.00 <br /> 0003 CONTRACTOR'S LIASON LS 10,500.00 1.00 1.0000 1.0000 0.0000 10,500.00 10,500.00 0.00 <br /> 0004 TRAFFIC CONTROL LABOR HR 57.25 8,700.00 4,876.5000 4,833.5000 43.0000 279,179.63 276,717.88 2,461.75 <br /> 0005 MAINT&PROTECTION OF TRAFFIC LS 31,200.00 1.00 1.0000 1.0000 0.0000 31,200.00 31,200.00 0.00 <br /> CONTROL <br /> 0006 TRENCH EXCAVATION SAFETY SYSTEMS LS 23,260.00 1.00 1.0000 1.0000 0.0000 23,260.00 23,260.00 0.00 <br /> 0007 STREET CLEANING&SWEEPING HR 160.00 425.00 214.7500 214.7500 0.0000 34,360.00 34,360.00 0.00 <br /> 0008 EROSION/WATER POLLUTION CONTROL LS 8,300.00 1.00 1.0000 1.0000 0.0000 8,300.00 8,300.00 0.00 <br /> 0009 SAWCUT EXISTING IMPROVEMENTS LF 2.50 26,679.00 18,057.0000 18,057.0000 0,0000 45,142.50 45,142.50 0.00 <br /> 0010 REMOVAL OF ASPHALT PAVEMENT SF 0.80 36,506.00 97,613.0000 97,613.0000 0.0000 78,090.40 78,090,40 0.00 <br /> 0011 REMOVAL OF CONCRETE PAVEMENT SF 1.62 4,480.00 7,445.2000 7,445.2000 0.0000 12,061.22 12,061.22 0.00 <br /> 0012 REMOVAL OF CONCRETE SIDEWALK LF 0.85 6,727.00 4,404.3000 4,404.3000 0.0000 3,743.66 3,743.66 0.00 <br /> 0013 REMOVAL OF CURB&GUTTER SF 2.86 2,379,00 2,124.5000 2,124.5000 0.0000 6,076.07 6,076.07 0.00 <br /> 0014 CRUSHED SURFACING BASE COURSE TN 27.75 7,961.00 12,368.5600 12,368.5600 0.0000 343,227.54 343,227.54 0.00 <br /> 0015 GRAVEL BORROW TN 26.88 6,559.00 7,717.9700 7,717.9700 0.0000 207,459.03 207,459.03 0.00 <br /> 0016 FOUNDATION MATERIAL TN 40.86 600.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> 0017 TEMPORARY ROADWAY PATCH LS 82,588,00 1.00 1.0000 1.0000 0.0000 82,588.00 82,588.00 0.00 <br /> 0018 RELOCATE EXISTING WATER MAIN 4"DIAM LF 145.00 45.00 0,0000 0.0000 0.0000 0.00 0.00 0.00 <br /> 0019 RELOCATE EXISTING WATER MAIN 6"DIAM LF 146.00 45.00 0.0000 0,0000 0.0000 0.00 0.00 0.00 <br /> 0020 RELOCATE EXISTING WATER MAIN 8"DIAM LF 180.00 30.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> 0021 STORM DRAIN PIPE,6"DIAM LF 52.00 35.00 41.0000 41,0000 0.0000 2,132.00 2,132.00 0.00 <br /> 0022 STORM DRAIN PIPE,8"DIAM LF 48.40 1,668.00 1,796.0000 1,796.0000 0.0000 86,926.40 86,926.40 0.00 <br /> 0023 STORM DRAIN PIPE,12"DIAM LF 57.58 6,084.00 6,027,0000 6,027.0000 0.0000 347,034.66 347,034.66 0.00 <br /> 0024 STORM DRAIN PIPE,18"DIAM LF 68.60 1,498.00 1,498.0000 1,498.0000 0.0000 102,762.80 102,762.80 0.00 <br /> 0025 STORM DRAIN PIPE,24"DIAM LF 97.80 695.00 692.0000 692.0000 0,0000 67,677.60 67,677.60 0.00 <br /> 0026 STORM DRAIN PIPE,30"DIAM LF 141.75 356.00 357.0000 357.0000 0.0000 50,604.75 50,604.75 0,00 <br />