My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 2/6/2020 Change Order 1
>
Contracts
>
Capital Contract
>
IMCO General Construction 2/6/2020 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2020 11:29:05 AM
Creation date
3/13/2020 11:28:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
2/6/2020
Department
Public Works
Department Project Manager
Zachary Brown
Subject / Project Title
WCPF FEN Chlorination Building Upgrade
Public Works WO Number
UP3614
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0001476
Total Compensation
$20,448.09
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
IMCO General Construction Inc 11/13/2018
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. In full and complete compensation for the changes described in Exhibit A, including all direct <br /> and indirect costs and impacts, the contract price shall be adjusted as described in this <br /> Change Order. <br /> 3. The duration of the Contract shall be adjusted to the extent described in this Change Order. <br /> 4. Contractor waives and releases any and all claims arising out of, or related to, this Change <br /> Order, the work described in Exhibit A, and all work and actual or constructive changes that <br /> occurred or began prior to the date of this Change Order, including, but not limited to, <br /> claims for equitable adjustment of time and compensation, delay,impact, overhead, or <br /> inefficiencies. This provision does not apply to requests for equitable adjustment of time or <br /> price for which the Contractor timely and properly provided notice of a differing site <br /> condition, protest, dispute, claim or Contract Claim as required by the Contract Documents. <br /> If the Contract Documents establish a time period for notice of a differing site condition, <br /> protest, dispute, claim, or Contract Claim that ends after the date of this Change Order, but <br /> relates to work performed prior to the date of this Change Order, then this provision does <br /> not apply if the Contractor timely and properly submits such notice <br /> 5. This Change Order only changes the contract between Contractor and City to the extent <br /> explicitly provided herein. <br /> CITY <br /> Attest: Approved As to Form: <br /> Office of the City Attorney <br /> APPROVED AS TO FORM <br /> David C.Hall,City Attorney <br /> r City Clerk City Attorney <br /> Date: off-�P o�O Date: 02—P o16)-6 Date: 2,S•2.0 <br /> Recommended By: <br /> Construction Project Engineer (if Engineering Department Director <br /> Manager (if applicable) Manager (if <br /> applicable) applicable) <br /> Date: /-3i-2O47,0 Date: f/31/ ZCZc' Date: D te: Z-c-Z7�7 <br /> CONTRACTOR <br /> By Date: L /n / o2 <br /> Officer <br />
The URL can be used to link to this page
Your browser does not support the video tag.