Laserfiche WebLink
Everpark Garage -Repairs 1/21/2020 <br /> Change Order No. 1 -Everpark Garage- Repairs Exhibit A <br /> No. Construction Change Directives Amount <br /> 1 Include additional line striping to levels 2 & 3 decks due to the installation of non-skid CO#2 <br /> surface install in the sealer. The installation of non-skid covered existing striping <br /> thus reqiuring re-stripe. Also inclusive of level 1 foundation & ramp re-striping as requested. $ 19,100.00 <br /> 2 Repairs to stairwells as identified by ASI 1, includes concrete spall repairs at central stairs, CO#3 <br /> precast concrete connections repair& replacement at North/South stairs. $ 20,843.00 <br /> No. FD Thomas, Inc. Change Proposals Amount <br /> 1 Application of coating to all FRP repairs performed on slab beams to match existing color CO#1 <br /> of garage. $ 1,116.00 <br /> Total: $ 41,059.00 <br />