My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3000 ROCKEFELLER AVE CLERKS OFFICE 2020-03-31
>
Address Records
>
ROCKEFELLER AVE
>
3000
>
CLERKS OFFICE
>
3000 ROCKEFELLER AVE CLERKS OFFICE 2020-03-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 9:32:59 AM
Creation date
3/31/2020 9:28:13 AM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
3000
Tenant Name
CLERKS OFFICE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FOR OFFICE USE ONLY PERMIT# gt 50 3 --Ogit <br /> BUILDING PLANNING <br /> Bldg/TI/Addn/Rem Size Zoning Classification <br /> Garage Size Overlay/Agreement <br /> VALUATION Nonresidential Use <br /> Number of Stories Residential Use <br /> Occupancy Group Proposed No.of Dwelling Units: <br /> Occupant Load Total No. of Dwelling Units: <br /> Basement No_ Yes_ Fin / Unfin Landscape or Planning Inspection <br /> Type of Construction needed before final? Yes_ No <br /> Existing Sprinkler System? Yes No_Unk_ Planning Inspector: <br /> Fire Sprinkler Required Yes_ No_ Phone#: <br /> Reason Approved by: Date: <br /> Existing Fire Alarm Yes No_Unk_ Historic Approved by: Date: <br /> Fire Alarm Required Yes_ No_ School Mitigation Reqd? Yes_ No <br /> Reason Everett School Dist Mukilteo School Dist <br /> RCW 64.55 MF worksheet req'd for permit? Yes_ No_ #of Net New Units: <br /> Add!RCW 64.55 docs required prior to final?Yes_ No Calculated School Impact Fee: <br /> Architectural Approved By/Date: School Impact Fee Credit: <br /> Structural Approved By/Date: Total School Impact Fee Owed: <br /> Comments: Comments: <br /> Intake OK by: Intake OK by: Ok to route _ Hold _ <br /> Make this a"W"Permit? Yes No <br /> PUBLIC WORKS, <br /> FEES, _ INTAKE: Checked By: Date: <br /> Plan Check Fee Comments: <br /> Building Permit <br /> Surcharge High Hazard Sites(Dental/Medical,Animals,Mortuary,etc-Review for RPBA) <br /> Additional Plan Check ❑ Public Works/Sys Dev/Traffic Mit./RPBA-NOT REQUIRED <br /> Plumbing Fee 0 Route for Public Works Review(bldg folder, PW Worksheet) <br /> Mechanical Fee 0 Public Works Permit-Concurrent Review(separate green folder) <br /> Ping Bldg Review Fee PW REVIEW: PW Reviewer: Date: <br /> Water Fee 0 PW Permit Approved-PW <br /> Sewer Fee 0 See PW Review Worksheet <br /> Systems Dev. Fee ❑ PW Permit Not Required <br /> Traffic Mitigation Fee <br /> Public Works Fee ; FIRE;DEPARTMENT , <br /> School Mitigation Fee Update/New Sprinklers Yes_ No_ Existing Bldg._ <br /> Update/New Detection Yes_ No_ Existing Bldg. <br /> Update/New Chemical Yes_ No_ Existing Bldg. <br /> Update/New Fire Servilc� Yes_ No_ Existing Idg. <br /> Approved by: V Date: 7� itg ( <br /> Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.