<br /> GENERAL NOTES - William Page
<br /> THE GENERAL CONTRACTOR SHALL FULLY COMPLY WITH THE 2012 IRC AND ALL Architects
<br /> ADDITIONAL STATE AND LOCAL CODE REQUIREMENTS.
<br /> 2012 IEC,2012 IMC AND 2012 IPC SHALL BE USED.
<br /> THE CONTRACTOR SHALL ASSUME FULL RESPONSIBIUTY FOR ANY WORK
<br /> KNOWINGLY PERFORMED CONTRARY TO SUCH LAWS,ORDINANCES,OR
<br /> REGULATIONS.THE CONTRACTOR SHALL ALSO PERFORM COORDINATION WITH
<br /> •
<br /> ALL UTILITIES AND STATE,COUNTY AND CITY AUTHORITIES.
<br /> THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND PROPER I Seattle
<br /> FUNCTION OF PLUMBING,HVAC AND ELECTRICAL SYSTEMS.THE GENERAL
<br /> Whidbey Island
<br /> - CONTRACTOR SHALL NOTIFY THIS OFFICE WITH ANY PLAN CHANGES REQUIRED
<br /> FOR DESIGN AND FUNCTION OF PLUMBING,HVAC AND ELECTRICAL SYSTEMS.
<br /> P.O.Box 665 Freeland
<br /> WILLIAM PAGE ARCHITECTS SHALL NOT BE RESPONSIBLE FOR CONSTRUCTION Washington 98249
<br /> MEANS AND METHODS,ACTS OR OMISSIONS OF THE CONTRACTOR OR 206-283-8317
<br /> SUBCONTRACTOR.OR FAILURE OF ANY OF THEM TO CARRY OUT WORK IN
<br /> ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS.AND DEFECT 360-341-1958
<br /> DISCOVERED IN THE CONSTRUCTION DOCUMENTS SHALL BE BROUGHT TO THE pe.earch@whatheyisiad.con;
<br /> ATTENTION OF THIS OFFICE BY WRITTEN NOTICE BEFORE PROCEEDING WITH WORK. ',,,,,,,,,,muaeearchltetts.can
<br /> • REASONABLE TIME NOT ALLOWED THIS OFFICE TO CORRECT THE DEFECT SHALL Issue/Revisions
<br /> I - PLACE THE BURDEN OF COST AND LIABILITY FROM SUCH DEFECT UPON THE j No. Date Comments
<br /> CONTRACTOR.
<br /> THE BUILDER SHALL VERIFY THAT SITE CONDITIONS ARE CONSISTENT WITH THESE
<br /> PLANS BEFORE STARTING WORK.WORK NOT SPECIFICALLY DETAILED SHALL BE
<br /> • CONSTRUCTED TO THE SAME QUALITY AS SIMILAR WORK THAT IS DETAILED.ALL
<br /> WORK SHALL BE DONE IN ACCORDANCE WITH INTERNATIONAL BUILDING CODES
<br /> AND LOCAL CODES.
<br /> SPECIAL INSPECTOR QUALIFICATIONS:DEMONSTRATE COMPETENCE,TO THE
<br /> • SATISFACTION OF THE BUILDING OFFICIAL FOR INSPECTION OF THE PARTICULAR
<br /> . TYPE OF CONSTRUCTION OR OPERATION IN QUESTION.PRIOR TO THE BEGINNING
<br /> ,.OFCONSTRUCTION,REVIEWTHE SPECIAL INSPECTION REQUIREMENTS WITH THE.. - -.... _..
<br /> ARCHITECT,ENGINEER,BUILDING OFFICIAL GENERAL CONTRACTOR AND
<br /> j - SPECIAL INSPECTORS. '
<br /> •
<br /> - DUTIES OF THE SPECIAL INSPECTOR INCLUDE.BUT ARE NOT LIMITED TO:
<br /> •
<br /> OBSERVE THE WORK FOR CONFORMANCE WITH THE APPROVED PERMIT
<br /> DRAWINGS AND SPECIFICATIONS.BRING DISCREPANCIES TO THE IMMEDIATE
<br /> DRAWING NOTE‘: ATTENTION OF THE GENERAL CONTRACTOR FOR BUILDING OFFICIAL
<br /> FURNISH INSPECTION REPORTS FOR EACH INSPECTION TO THE BUILDING OFFICIAL
<br /> - RENDERINGS ARE NOT TO SCALE;ALL RENDERINGS ARE FOR ARTISTIC DEPICTION ARCHITECT,ENGINEER,GENERAL CONTRACTOR AND OWNER IN A TIMELY
<br /> ONLY.PLAN UPDATES MAY NOT BE REFLECTED IN RENDERINGS.RENDERINGS MANNER:
<br /> SUBMIT A FINAL REPORT STATING WHETHER THE WORK REQUIRING SPECIAL
<br /> SHALL NOT BE USED FOR CONSTRUCTION,
<br /> INSPECTION WAS INSPECTED,AND WHETHER THE WORK IS IN CONFORMANCE
<br /> THE FOLLOWING DOCUMENTS REQUIRE THAT SOME ASSUMPTIONS BE MADE WITH THE APPROVED PERMIT DRAWINGS AND SPECIFICATIONS.
<br /> CONCERNING THE SITE,UTILITIES AND THE BUILDINGS.THE CONTRACTOR SHALL .
<br /> - VERIFY ALL EXISTING CONDITIONS AND REPORT ANY DISCREPANCIES PRIOR TO DUTIES OF THE GENERAL CONTRACTOR INCLUDE.BUT ARE NOT LIMITED TO:
<br /> I - CONTINUING WORK. NOTIFY SPECIAL INSPECTOR THAT WORK IS READY FOR INSPECTION AT LEAST 24
<br /> I HOURS BEFORE THE INSPECTION IS•REQUIRED.
<br /> WRITTEN DIMENSIONS ON THESE DRAWINGS SHALL HAVE PRECEDENCE OVER I MAINTAIN ACCESS TO WORK REQUIRING SPECIAL INSPECTION UMW IT HAS BEEN
<br /> •
<br /> SCALED DIMENSIONS.THE GENERAL CONTRACTOR SHALL VERIFY AND IS OBSERVED AND INDICATED TO BE IN CONFORMANCE BY THE SPECIAL INSPECTOR
<br /> AND APPROVED BY THE BUILDING OFFICIAL.
<br /> •
<br /> RESPONSIBLE FOR ALL DIMENSIONS(INCLUDING ROUGH OPENINGS)AND PROVIDE THE SPECIAL INSPECTOR WITH ACCESS TO APPROVED PERMIT
<br /> CONDITIONS ON THE JOB AND MUST NOTIFY THIS OFFICE OF ANY VARIATIONS DRAWINGS AND SPECIFICATIONS AT THE JOB SITE.
<br /> FROM THESE DRAWINGS.DO NOT SCALE DRAWINGS,IF A DIMENSION IS MISSING MAINTAIN JOB-SITE COPIES OF ALL REPORTS SUBMITTED BY THE SPECIAL
<br /> - CONTACT ARCHITECT.
<br /> - INSPECTOR:
<br /> WRITTEN DIMENSIONS AND SPECIFIC NOTES SHALL TAKE PRECEDENCE OVER •
<br /> SCALED DIMENSIONS AND GENERAL NOTES.THE ENGINEER/DESIGNER SHALL BE DEFINITIONS: 35885188181101819
<br /> CONTINUOUS INSPECTION:THE SPECIAL INSPECTOR IS OBSERVING THE WORKlAir
<br /> CONSULTED FOR CLARIFICATION IF SITE CONDITIONS ARE ENCOUNTERED THAT• 7i
<br /> ARE DIFFERENT THAN SHOWN,IF DISCREPANCIES ARE FOUND IN THE PLANS OR
<br /> REQUIRING SPECIAL INSPECTION AT ALL TIMES.
<br /> . NOTES,OR IF A QUESTION ARISES OVER THE INTENT OF THE PLANS OR NOTES. PERIODIC INSPECTION THE SPECIAL INSPECTOR IS ON SITE AS REQUIRED TO RtWR AB Eta B_.
<br /> CONTRACTOR SHALL VERIFY AND IS RESPONSIBLE FOR ALL DIMENSIONS CONFIRM THAT THE WORK REQUIRING SPECIAL INSPECTION IS IN AROF
<br /> CONFORMANCE.
<br /> (INCLUDING ROUGH OPENINGS).
<br /> • THIS STRUCTURE SHALL BE ADEQUATELY BRACED FOR WIND LOADS UNTIL THE
<br /> THE INTENT OF THE CONSTRUCTION DOCUMENTS IS TO INCLUDE ALL ITEMS ROOF,FLOOR AND WALLS HAVE BEEN PERMANENTLY FRAMED TOGETHER AND
<br /> NECESSARY FOR THE COMPLETION OF WORK.WORK NOT COVERED IN THE .SHEATHED.
<br /> CONSTRUCTION DOCUMENTS WILL NOT BE REQUIRED UNLESS IT IS REASONABLY •
<br /> - - •
<br /> INFERRED AS BEING NECESSARY TO PROVIDE THE INTENDED RESULTS.WRITTEN
<br /> THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION AND
<br /> SPECIFICATIONS AND GENERAL REQUIREMENTS SHALL HAVE PRECEDENCE OVER COORDINATION OF OTHER SUB CONTRACTORS TO SECURE COMPLIANCE OF
<br /> DRAWINGS.DAMAGED OR DEFECTIVE WORK OR MATERIAL SHALL BE
<br /> IMMEDIATELY REPAIRED OR REPLACED TO-THE APPROVAL OF THE ARCHITECT DRAWINGS AND SPECIFICATIONS AND THE ACCURATE LOCATION OF
<br /> STRUCTURAL MEMBERS AND OPENINGS FOR MECHANICALELECTRICALSTAIRS
<br /> AND AT NO ADDITIONAL COST TO THE OWNER. j
<br /> AND ALL OTHERS ITEMS.
<br /> •
<br /> • ALL DIMENSIONS ARE TO FACE OF STUDS.MASONRY OR CONCRETE UNLESS CONTRACTOR SHALL NOTIFY OWNER,ARCHITECT AND LOCAL BUILDING
<br /> •
<br /> NOTED OTHERWISE. OFFICIALS AT CRITICAL MILESTONES AS ESTABLISHED 8Y LOCAL MUNICIPALITY•
<br /> •
<br /> CROSS SECTIONS AND DETAILS SHOWN DO NOT NECESSARILY INDICATE ALL LIKE AND AS SHOWN IN THESE DOCUMENTS IN ORDER TO OBTAIN NECESSARY
<br /> CONDITIONS AND DO NOT LIMIT THE APPLICATION OF ANY DRAWING,SECTION APPROVALS PRIOR TO COMMENCEMENT Of FURTHER WORK.-
<br /> OR DETAILS THAT MAY APPLY TO OTHER SAME OR SIMILAR CONDITION NOT
<br /> REFERENCED. GENFRAI NOTE., •
<br /> •
<br /> THE ARCHITECT IS NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY
<br /> •
<br /> PLEASE SEE ADDITIONAL NOTES CALLED OUT ON OTHER SHEETS. PRECAUTIONS:MEANS,METHODS.TECHNIQUES.SEQUENCES OR
<br /> PROCEDURES.THE PERIODIC SITE VISITS BY THE ARCHITECT OR ENGINEER
<br /> THE SURVEY INFORMATION HAS BEEN SUPPLIED BY UCENSED SURVEYOR. SHALL NOT BE CONSTRUED AS SUPERVISION OF CONSTRUCTION NOR
<br /> WILLIAM PAGE ARCHITECTS DOES NOT TAKE ANY RESPONSIBILITY FOR ANY RESPONSIBLE FOR PROVIDING A SAFE PLACE FOR WORK BY THE
<br /> ERRORS OR OMISSIONS. CONTRACTORS EMPLOYEES,OR EMPLOYEES OF SUPPLIERS OR
<br /> SUBCONTRACTORS,OR FOR ACCESS,VISITS,USE,WORK,TRAVEL,OR
<br /> BUILDING PERFORMANCE. - OCCUPANCY BY ANY PERSON.THE CONTRACTOR SHALL TAKE ALL
<br /> REASONABLE PRECAUTIONS FOR THE SAFETY OF AND PROTECTION TO -
<br /> HEAT LOSS CALCULATIONS SHALL COMPLY WITH THE REQUIREMENTS OF PREVENT DAMAGE,INJURY OR LOSS TO:EMPLOYEES AND ALL OTHER I
<br /> REGIONAL AND LOCAL CODES.SEE CALCULATIONS.PORCHES,DECKS, AFFECTED PERSONS,ALL WORK,AND MATERIALS AND EQUIPMENT.OTHER
<br /> FOUNDATION,FIREPLACE ENCLOSURES.AND GARAGE AREAS NOT INCLUDED IN PROPERTY AT THE SITE OR ADJACENT PROPERTY.
<br /> LIVING AREA.ALL EXHAUST FANS TO BE VENTED DIRECTLY TO THE EXTERIOR.ALL
<br /> PENETRATIONS OF THE BUILDING ENVELOPE SHALL BE SEALED WITH CAULK OR HOMEOWNER WILL TAKE NECESSARY PRECAUTIONS TO REMOVE OR RELOCATE -
<br /> FOAM. ITEMS OF VALUE TO BE REUSED AND/OR SAVED,OR IN ANY DANGER OF BEING Copyright 2019 William Page ANN.=. DAMAGED DUE TO CONSTRUCTION PROCESS.
<br /> . INSTALL FOAM TYPE INSULATION AT FLOOR AND PLATE LINES,OPENINGS IN Project
<br /> PLATES,CORNER STUD CAVITIES AND AROUND DOOR AND WINDOW ROUGH Residence -
<br /> OPENING CAVITIES. THESE DRAWINGS ARE THE PROPRIETARY WORK PRODUCT AND PROPERTY OF
<br /> ' WILLIAM PAGE ARCHITECTSDEVELOPED FOR THE EXCLUSIVE USE OF WILLIAM 2609-Chestnut Street
<br /> INSULATE ALL ACCESS DOORS/HATCHES TO ATTICS TO R48,CRAWL SPACES PAGE ARCHITECTS.USE OF THESE DRAWINGS AND CONCEPTS CONTAINED Everett,Washington
<br /> ' - EQUAL THE WALLFLOOR RATING. THEREIN WITHOUT THE WRITTEN PERMISSION OF WILLIAM PAGE ARCHITECTS IS Sheet Title
<br /> PROHIBITED AND MAY SUBJECT YOU TO A CLAIM FOR DAMAGES.•
<br /> If GRADING NOTES: •
<br /> •
<br /> { CONTRACTOR TO VERIFY LOCATION OF ALL EXISTING UTILITIES. _ General Notes
<br /> 11 PROVIDE POSITIVE DRAINAGE AWAY FROM BUILDING. REEF PI AN NOTED
<br /> Project No. 2019-10
<br /> FINAL GRADE TO CONVEY SURFACE DRAINAGE TOWARDS DOWN HILL Date 021022019
<br /> • j Scaie AS NOTED
<br /> - ! AREAS TO BE FILLED SHALL BE CLEARED.GRUBBED TO REMOVE TREES, CALL BEFORE YOU DIG: - - - I Drawn By WY
<br /> I QeckeJ By WIP
<br /> VEGETATION,ROOTS AND OTHER OBJECTIONABLE MATERIAL AND STRIPPED OF • 1
<br /> TOPSOIL 1 Sheet
<br /> Notes Notes Notes Notes Notes A-3 /°
<br /> _ _ •
<br /> of lOTotaiSheets