Laserfiche WebLink
• <br /> GENERAL NOTES - William Page <br /> THE GENERAL CONTRACTOR SHALL FULLY COMPLY WITH THE 2012 IRC AND ALL Architects <br /> ADDITIONAL STATE AND LOCAL CODE REQUIREMENTS. <br /> 2012 IEC,2012 IMC AND 2012 IPC SHALL BE USED. <br /> THE CONTRACTOR SHALL ASSUME FULL RESPONSIBIUTY FOR ANY WORK <br /> KNOWINGLY PERFORMED CONTRARY TO SUCH LAWS,ORDINANCES,OR <br /> REGULATIONS.THE CONTRACTOR SHALL ALSO PERFORM COORDINATION WITH <br /> • <br /> ALL UTILITIES AND STATE,COUNTY AND CITY AUTHORITIES. <br /> THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND PROPER I Seattle <br /> FUNCTION OF PLUMBING,HVAC AND ELECTRICAL SYSTEMS.THE GENERAL <br /> Whidbey Island <br /> - CONTRACTOR SHALL NOTIFY THIS OFFICE WITH ANY PLAN CHANGES REQUIRED <br /> FOR DESIGN AND FUNCTION OF PLUMBING,HVAC AND ELECTRICAL SYSTEMS. <br /> P.O.Box 665 Freeland <br /> WILLIAM PAGE ARCHITECTS SHALL NOT BE RESPONSIBLE FOR CONSTRUCTION Washington 98249 <br /> MEANS AND METHODS,ACTS OR OMISSIONS OF THE CONTRACTOR OR 206-283-8317 <br /> SUBCONTRACTOR.OR FAILURE OF ANY OF THEM TO CARRY OUT WORK IN <br /> ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS.AND DEFECT 360-341-1958 <br /> DISCOVERED IN THE CONSTRUCTION DOCUMENTS SHALL BE BROUGHT TO THE pe.earch@whatheyisiad.con; <br /> ATTENTION OF THIS OFFICE BY WRITTEN NOTICE BEFORE PROCEEDING WITH WORK. ',,,,,,,,,,muaeearchltetts.can <br /> • REASONABLE TIME NOT ALLOWED THIS OFFICE TO CORRECT THE DEFECT SHALL Issue/Revisions <br /> I - PLACE THE BURDEN OF COST AND LIABILITY FROM SUCH DEFECT UPON THE j No. Date Comments <br /> CONTRACTOR. <br /> THE BUILDER SHALL VERIFY THAT SITE CONDITIONS ARE CONSISTENT WITH THESE <br /> PLANS BEFORE STARTING WORK.WORK NOT SPECIFICALLY DETAILED SHALL BE <br /> • CONSTRUCTED TO THE SAME QUALITY AS SIMILAR WORK THAT IS DETAILED.ALL <br /> WORK SHALL BE DONE IN ACCORDANCE WITH INTERNATIONAL BUILDING CODES <br /> AND LOCAL CODES. <br /> SPECIAL INSPECTOR QUALIFICATIONS:DEMONSTRATE COMPETENCE,TO THE <br /> • SATISFACTION OF THE BUILDING OFFICIAL FOR INSPECTION OF THE PARTICULAR <br /> . TYPE OF CONSTRUCTION OR OPERATION IN QUESTION.PRIOR TO THE BEGINNING <br /> ,.OFCONSTRUCTION,REVIEWTHE SPECIAL INSPECTION REQUIREMENTS WITH THE.. - -.... _.. <br /> ARCHITECT,ENGINEER,BUILDING OFFICIAL GENERAL CONTRACTOR AND <br /> j - SPECIAL INSPECTORS. ' <br /> • <br /> - DUTIES OF THE SPECIAL INSPECTOR INCLUDE.BUT ARE NOT LIMITED TO: <br /> • <br /> OBSERVE THE WORK FOR CONFORMANCE WITH THE APPROVED PERMIT <br /> DRAWINGS AND SPECIFICATIONS.BRING DISCREPANCIES TO THE IMMEDIATE <br /> DRAWING NOTE‘: ATTENTION OF THE GENERAL CONTRACTOR FOR BUILDING OFFICIAL <br /> FURNISH INSPECTION REPORTS FOR EACH INSPECTION TO THE BUILDING OFFICIAL <br /> - RENDERINGS ARE NOT TO SCALE;ALL RENDERINGS ARE FOR ARTISTIC DEPICTION ARCHITECT,ENGINEER,GENERAL CONTRACTOR AND OWNER IN A TIMELY <br /> ONLY.PLAN UPDATES MAY NOT BE REFLECTED IN RENDERINGS.RENDERINGS MANNER: <br /> SUBMIT A FINAL REPORT STATING WHETHER THE WORK REQUIRING SPECIAL <br /> SHALL NOT BE USED FOR CONSTRUCTION, <br /> INSPECTION WAS INSPECTED,AND WHETHER THE WORK IS IN CONFORMANCE <br /> THE FOLLOWING DOCUMENTS REQUIRE THAT SOME ASSUMPTIONS BE MADE WITH THE APPROVED PERMIT DRAWINGS AND SPECIFICATIONS. <br /> CONCERNING THE SITE,UTILITIES AND THE BUILDINGS.THE CONTRACTOR SHALL . <br /> - VERIFY ALL EXISTING CONDITIONS AND REPORT ANY DISCREPANCIES PRIOR TO DUTIES OF THE GENERAL CONTRACTOR INCLUDE.BUT ARE NOT LIMITED TO: <br /> I - CONTINUING WORK. NOTIFY SPECIAL INSPECTOR THAT WORK IS READY FOR INSPECTION AT LEAST 24 <br /> I HOURS BEFORE THE INSPECTION IS•REQUIRED. <br /> WRITTEN DIMENSIONS ON THESE DRAWINGS SHALL HAVE PRECEDENCE OVER I MAINTAIN ACCESS TO WORK REQUIRING SPECIAL INSPECTION UMW IT HAS BEEN <br /> • <br /> SCALED DIMENSIONS.THE GENERAL CONTRACTOR SHALL VERIFY AND IS OBSERVED AND INDICATED TO BE IN CONFORMANCE BY THE SPECIAL INSPECTOR <br /> AND APPROVED BY THE BUILDING OFFICIAL. <br /> • <br /> RESPONSIBLE FOR ALL DIMENSIONS(INCLUDING ROUGH OPENINGS)AND PROVIDE THE SPECIAL INSPECTOR WITH ACCESS TO APPROVED PERMIT <br /> CONDITIONS ON THE JOB AND MUST NOTIFY THIS OFFICE OF ANY VARIATIONS DRAWINGS AND SPECIFICATIONS AT THE JOB SITE. <br /> FROM THESE DRAWINGS.DO NOT SCALE DRAWINGS,IF A DIMENSION IS MISSING MAINTAIN JOB-SITE COPIES OF ALL REPORTS SUBMITTED BY THE SPECIAL <br /> - CONTACT ARCHITECT. <br /> - INSPECTOR: <br /> WRITTEN DIMENSIONS AND SPECIFIC NOTES SHALL TAKE PRECEDENCE OVER • <br /> SCALED DIMENSIONS AND GENERAL NOTES.THE ENGINEER/DESIGNER SHALL BE DEFINITIONS: 35885188181101819 <br /> CONTINUOUS INSPECTION:THE SPECIAL INSPECTOR IS OBSERVING THE WORKlAir <br /> CONSULTED FOR CLARIFICATION IF SITE CONDITIONS ARE ENCOUNTERED THAT• 7i <br /> ARE DIFFERENT THAN SHOWN,IF DISCREPANCIES ARE FOUND IN THE PLANS OR <br /> REQUIRING SPECIAL INSPECTION AT ALL TIMES. <br /> . NOTES,OR IF A QUESTION ARISES OVER THE INTENT OF THE PLANS OR NOTES. PERIODIC INSPECTION THE SPECIAL INSPECTOR IS ON SITE AS REQUIRED TO RtWR AB Eta B_. <br /> CONTRACTOR SHALL VERIFY AND IS RESPONSIBLE FOR ALL DIMENSIONS CONFIRM THAT THE WORK REQUIRING SPECIAL INSPECTION IS IN AROF <br /> CONFORMANCE. <br /> (INCLUDING ROUGH OPENINGS). <br /> • THIS STRUCTURE SHALL BE ADEQUATELY BRACED FOR WIND LOADS UNTIL THE <br /> THE INTENT OF THE CONSTRUCTION DOCUMENTS IS TO INCLUDE ALL ITEMS ROOF,FLOOR AND WALLS HAVE BEEN PERMANENTLY FRAMED TOGETHER AND <br /> NECESSARY FOR THE COMPLETION OF WORK.WORK NOT COVERED IN THE .SHEATHED. <br /> CONSTRUCTION DOCUMENTS WILL NOT BE REQUIRED UNLESS IT IS REASONABLY • <br /> - - • <br /> INFERRED AS BEING NECESSARY TO PROVIDE THE INTENDED RESULTS.WRITTEN <br /> THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION AND <br /> SPECIFICATIONS AND GENERAL REQUIREMENTS SHALL HAVE PRECEDENCE OVER COORDINATION OF OTHER SUB CONTRACTORS TO SECURE COMPLIANCE OF <br /> DRAWINGS.DAMAGED OR DEFECTIVE WORK OR MATERIAL SHALL BE <br /> IMMEDIATELY REPAIRED OR REPLACED TO-THE APPROVAL OF THE ARCHITECT DRAWINGS AND SPECIFICATIONS AND THE ACCURATE LOCATION OF <br /> STRUCTURAL MEMBERS AND OPENINGS FOR MECHANICALELECTRICALSTAIRS <br /> AND AT NO ADDITIONAL COST TO THE OWNER. j <br /> AND ALL OTHERS ITEMS. <br /> • <br /> • ALL DIMENSIONS ARE TO FACE OF STUDS.MASONRY OR CONCRETE UNLESS CONTRACTOR SHALL NOTIFY OWNER,ARCHITECT AND LOCAL BUILDING <br /> • <br /> NOTED OTHERWISE. OFFICIALS AT CRITICAL MILESTONES AS ESTABLISHED 8Y LOCAL MUNICIPALITY• <br /> • <br /> CROSS SECTIONS AND DETAILS SHOWN DO NOT NECESSARILY INDICATE ALL LIKE AND AS SHOWN IN THESE DOCUMENTS IN ORDER TO OBTAIN NECESSARY <br /> CONDITIONS AND DO NOT LIMIT THE APPLICATION OF ANY DRAWING,SECTION APPROVALS PRIOR TO COMMENCEMENT Of FURTHER WORK.- <br /> OR DETAILS THAT MAY APPLY TO OTHER SAME OR SIMILAR CONDITION NOT <br /> REFERENCED. GENFRAI NOTE., • <br /> • <br /> THE ARCHITECT IS NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY <br /> • <br /> PLEASE SEE ADDITIONAL NOTES CALLED OUT ON OTHER SHEETS. PRECAUTIONS:MEANS,METHODS.TECHNIQUES.SEQUENCES OR <br /> PROCEDURES.THE PERIODIC SITE VISITS BY THE ARCHITECT OR ENGINEER <br /> THE SURVEY INFORMATION HAS BEEN SUPPLIED BY UCENSED SURVEYOR. SHALL NOT BE CONSTRUED AS SUPERVISION OF CONSTRUCTION NOR <br /> WILLIAM PAGE ARCHITECTS DOES NOT TAKE ANY RESPONSIBILITY FOR ANY RESPONSIBLE FOR PROVIDING A SAFE PLACE FOR WORK BY THE <br /> ERRORS OR OMISSIONS. CONTRACTORS EMPLOYEES,OR EMPLOYEES OF SUPPLIERS OR <br /> SUBCONTRACTORS,OR FOR ACCESS,VISITS,USE,WORK,TRAVEL,OR <br /> BUILDING PERFORMANCE. - OCCUPANCY BY ANY PERSON.THE CONTRACTOR SHALL TAKE ALL <br /> REASONABLE PRECAUTIONS FOR THE SAFETY OF AND PROTECTION TO - <br /> HEAT LOSS CALCULATIONS SHALL COMPLY WITH THE REQUIREMENTS OF PREVENT DAMAGE,INJURY OR LOSS TO:EMPLOYEES AND ALL OTHER I <br /> REGIONAL AND LOCAL CODES.SEE CALCULATIONS.PORCHES,DECKS, AFFECTED PERSONS,ALL WORK,AND MATERIALS AND EQUIPMENT.OTHER <br /> FOUNDATION,FIREPLACE ENCLOSURES.AND GARAGE AREAS NOT INCLUDED IN PROPERTY AT THE SITE OR ADJACENT PROPERTY. <br /> LIVING AREA.ALL EXHAUST FANS TO BE VENTED DIRECTLY TO THE EXTERIOR.ALL <br /> PENETRATIONS OF THE BUILDING ENVELOPE SHALL BE SEALED WITH CAULK OR HOMEOWNER WILL TAKE NECESSARY PRECAUTIONS TO REMOVE OR RELOCATE - <br /> FOAM. ITEMS OF VALUE TO BE REUSED AND/OR SAVED,OR IN ANY DANGER OF BEING Copyright 2019 William Page ANN.=. DAMAGED DUE TO CONSTRUCTION PROCESS. <br /> . INSTALL FOAM TYPE INSULATION AT FLOOR AND PLATE LINES,OPENINGS IN Project <br /> PLATES,CORNER STUD CAVITIES AND AROUND DOOR AND WINDOW ROUGH Residence - <br /> OPENING CAVITIES. THESE DRAWINGS ARE THE PROPRIETARY WORK PRODUCT AND PROPERTY OF <br /> ' WILLIAM PAGE ARCHITECTSDEVELOPED FOR THE EXCLUSIVE USE OF WILLIAM 2609-Chestnut Street <br /> INSULATE ALL ACCESS DOORS/HATCHES TO ATTICS TO R48,CRAWL SPACES PAGE ARCHITECTS.USE OF THESE DRAWINGS AND CONCEPTS CONTAINED Everett,Washington <br /> ' - EQUAL THE WALLFLOOR RATING. THEREIN WITHOUT THE WRITTEN PERMISSION OF WILLIAM PAGE ARCHITECTS IS Sheet Title <br /> PROHIBITED AND MAY SUBJECT YOU TO A CLAIM FOR DAMAGES.• <br /> If GRADING NOTES: • <br /> • <br /> { CONTRACTOR TO VERIFY LOCATION OF ALL EXISTING UTILITIES. _ General Notes <br /> 11 PROVIDE POSITIVE DRAINAGE AWAY FROM BUILDING. REEF PI AN NOTED <br /> Project No. 2019-10 <br /> FINAL GRADE TO CONVEY SURFACE DRAINAGE TOWARDS DOWN HILL Date 021022019 <br /> • j Scaie AS NOTED <br /> - ! AREAS TO BE FILLED SHALL BE CLEARED.GRUBBED TO REMOVE TREES, CALL BEFORE YOU DIG: - - - I Drawn By WY <br /> I QeckeJ By WIP <br /> VEGETATION,ROOTS AND OTHER OBJECTIONABLE MATERIAL AND STRIPPED OF • 1 <br /> TOPSOIL 1 Sheet <br /> Notes Notes Notes Notes Notes A-3 /° <br /> _ _ • <br /> of lOTotaiSheets <br />