My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1321 COLBY AVE 2ND FLOOR 2021-02-17
>
Address Records
>
COLBY AVE
>
1321
>
2ND FLOOR
>
1321 COLBY AVE 2ND FLOOR 2021-02-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 7:38:55 AM
Creation date
4/1/2020 1:43:48 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
1321
Tenant Name
2ND FLOOR
Notes
PHARMACY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2/21/2020 Page 2 <br /> City of Everett y/,7- <br /> 11:16:27AM <br /> INSPECTION ACTIVITY REPORT <br /> 11/4/2019 11/4/2019 BLDG DWF PARTIAL APPR eTRAKiT Inspection 11/1/2019 1:23 PM Galen Smith <br /> 08-FRAMING Request <br /> Contact Name:Galen Smith <br /> Site Address: 1321 COLBY AVE <br /> Phone:2066436779 <br /> e-Mail:galen.smith@skanska.com <br /> (11/4/2019 11:43 AM DWF) <br /> Drywall,north shaft,2 layers of 5/8"type x <br /> with offset ok to cover. <br /> South shaft 1"core board install ok to cover <br /> with next layer of 5/8"drywall and will <br /> inspect offset for third layer. <br /> 11/12/2019 11/12/2019 BLDG DWF PARTIAL APPR eTRAKiT Inspection 11/8/2019 9:49 AM Galen Smith <br /> 08-FRAMING Request <br /> Contact Name:Galen Smith <br /> Site Address: 1321 COLBY AVE <br /> Phone:2066436779 <br /> e-Mail:galen.smith@skanska.com <br /> (11/12/2019 1:33 PM DWF) <br /> South Mechanical Shaft-exhaust duct <br /> leading into mechanical room, 2 layers <br /> with offset. <br /> Ok to continue with framing,drywall and <br /> ceiling <br /> grid.Note leave tile out for inspection of <br /> mechanical and fire protection. <br /> 11/13/2019 11/13/2019 BLDG DWF PARTIAL APPR eTRAKiT Inspection 11/12/2019 12:14 PM Galen Smith <br /> 08-FRAMING Request <br /> Contact Name:Galen Smith <br /> Site Address:1321 COLBY AVE <br /> Phone:2066436779 <br /> e-Mail:galen.smith@skanska.com <br /> (11/13/2019 11:26 AM DWF) <br /> South shaft,above ceiling box out for <br /> ducting. <br /> 1"core board installed- <br /> ok to continue with next layer of drywall. <br /> Fire protection for shaft. <br /> 11/20/2019 11/20/2019 BLDG 12-CEILING DWF NOT READY cancelled inspection 11/19/2019 11:56 AM Galen Smith <br /> GRID <br /> Contact Name:Galen Smith <br /> Site Address: 1321 COLBY AVE <br /> Phone:2066436779 <br /> e-Mail:galen.smith@skanska.com <br /> 11/21/2019 11/21/2019 BLDG 12-CEILING DWF APPROVAL eTRAKiT Inspection 11/20/2019 9:08 AM Galen Smith <br /> GRID Request <br /> Contact Name:Galen Smith <br /> Site Address:1321 COLBY AVE <br /> Phone:2066436779 <br /> e-Mail:galen.smith@skanska.com <br /> (11/21/2019 1:57 PM DWF) <br /> As noted-complete drywall-fire taping at <br /> smoke wall as discussed with contractor <br /> before complete cover of ceiling tile. <br /> 12/27/2019 12/27/2019 BLDG 15-FINAL DWF APPROVAL Subject to 12/20/2019 11:31 AM Galen Smith <br /> B1907-078/ <br /> K1908-007 finals. Contact Name:Galen Smith <br /> Site Address: 1321 COLBY AVE <br /> Phone:2066436779 <br /> e-Mail:galen.smith@skanska.com <br /> 2/21/2020 2/21/2020 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> 2/21/2020 2/21/2020 FIRE 02-FINAL SAG APPROVAL <br /> INSP12 CRIllfsYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.