Laserfiche WebLink
(10 Stantec Stantec Consulting Services Inc. <br /> 4100 194th St SW Suite 400,Lynnwood,Washington 98036-4613 <br /> July 1,2019 <br /> Steve Banks <br /> City of Everett Permit Services <br /> 3200 Cedar Street <br /> Everett, Washington 98201 <br /> Subject: Providence Regional Medical Center Colby Campus-Pharmacy Metering <br /> Stantec Project Number:204821016 <br /> Dear Steve, <br /> The preliminary 7-day electrical demand reading for switchboard NC at Providence Regional <br /> Medical Center Colby Campus has been completed.The 7-day demand reading shows <br /> Switchboard NC with an electrical demand of 88.44 kVA (245.49A at 208V, 3-phase).Switchboard <br /> NC is a 208Y/120V,3-phase,4-wire board with a 1600A bus and is fed from a 300kVA transformer. <br /> With the added load from the current Pharmacy project,Switchboard NC will have a calculated <br /> load of 117.70 kVA (327A at 208V,3-phase.The updated load calculation and 7-day demand <br /> graph is attached. <br /> The meter for Switchboard NC is still recording.We will provide an updated electrical demand <br /> reading once the 30-day recording is complete. <br /> STANTEC CONSULTING SERVICES INC. <br /> O1 �! 4 <br /> v <br /> Maureen D. Jackson, PE <br /> Principal,Electrical <br /> Attachment Updated SWBD NC Load Calculation.pdf <br /> SWBD NC Graphed 7-Day.pdf <br /> an:\\US1305-F01\Workgroup\2048\active\204820849\Coordination\Sent\2019-07-01_Metering Letter to COE\PRMCE Colby Pharmacy <br /> Metering Letter.docx <br /> 0---___ <br />