Laserfiche WebLink
4 <br /> Stantec r oc�::or<<;=*t g Set,' , <br /> . <br /> 4' `94th it v11' Suit. c,'),Ly rr‘r 3c -:L,<;=,rrin.r4To.ik:2;,- 613 <br /> July 24,2019 <br /> Steve Banks <br /> City of Everett Permit Services <br /> 3200 Cedar Street <br /> Everett, Washington 98201 <br /> Subject: Providence Regional Medical Center Colby Campus-Pharmacy Metering <br /> Stantec Project Number:204821016 <br /> Dear Steve, <br /> ? The preliminary 30-day electrical demand reading for Switchboard NC at Providence Regional <br /> Medical Center Colby Campus has been completed.The 30-day demand reading shows <br /> Switchboard NC with an electrical demand of 88.44 kVA (245.49A at 208V,3-phase).Switchboard <br /> NC is a 208Y/120V,3-phase,4-wire board with a 1600A bus and is fed from a 300kVA transformer. <br /> With the added load from the current Pharmacy project,Switchboard NC will have a calculated <br /> load of 117.70 kVA (327A at 208V,3-phase).The updated load calculation and 30-day demand <br /> graph is attached. <br /> STANTEC CONSULTING SERVICES INC. <br /> ,'I t Ali <br /> 4 <br /> Maureen D.Jackson, PE <br /> Principal,Electrical <br /> Attachment: Updated SWBD NC Load Calculation.pdf <br /> SWBD NC Graphed 30-Day.pdf <br /> an:\\US1305-Fal\Workgroup\2048\active\204820849\Design\Corresp\2019-07-24_30-Day Metering Letter\PRMCE Colby Pharmacy, <br /> = Metering Letter.docx <br /> i <br /> 6.,. ,(3,,y-) <br />