Laserfiche WebLink
x <br /> NORTH MIDDLE SCHOOL <br /> The following BMPs are required for Item A5.1 per the 2010 COESWMM Volume IV: <br /> 1. Storm drain covers or a similarly effective containment device must be placed on all nearby drains to <br /> prevent dirty runoff and loose particles from entering the storm water drainage system. Covers shall be <br /> placed at the beginning of the workday and the accumulated materials collected and disposed of before <br /> removing the covers at the end of the workday. If storm drains are not present, dikes, berms, or other <br /> methods must be used to protect overland discharge paths from runoff. See BMPs S.2 and S.7 in <br /> Chapter 4 for more information on runoff control and disposal options. Street gutters, sidewalks, <br /> driveways, and other paved surfaces in the immediate area of the demolition must be swept at the end of <br /> each workday to collect and properly dispose of loose debris and garbage. <br /> 2. Check with the City's Building Department(425) 257-8810 to obtain required permits. <br /> COUGHLINPORTERLUNDEEN 6 <br /> S?Ri.,C .U?rr i, ..1,"(4 SEii.'.,.. E'v AdelS t; <br />