Laserfiche WebLink
4, 1, <br /> 100-Year 104.078 <br /> ***********Groundwater Recharge Summary************* <br /> Recharge is computed as input to Perind Groundwater Plus Infiltration in Structures <br /> Total Predeveloped Recharge During Simulation <br /> Model Element Recharge Amount(ac-ft) <br /> Subbasin: Subbasin 1 26.482 <br /> Link: New Copy Lnk1 Not Applicable <br /> Total: 26.482 <br /> Total Post Developed Recharge During Simulation <br /> Model Element Recharge Amount(ac-ft) <br /> Subbasin: Subbasin 1 0.000 <br /> Link: New Structure Lnk2 0.000 <br /> Total: 0.000 <br /> Total Predevelopment Recharge is Greater than Post Developed <br /> Average Recharge Per Year, (Number of Years= 158) <br /> Predeveloped: 0.168 ac-ft/year, Post Developed: 0.000 ac-ft/year <br /> ***********Water Quality Facility Data************* <br /> SCENARIO: PREDEVELOPED <br /> Number of Links: 1 <br /> SCENARIO: POSTDEVELOPED <br /> Number of Links: 1 <br /> ********** Link: New Structure Lnk2 ********** <br /> Basic Wet Pond Volume (91% Exceedance): 998. cu-ft <br /> Computed Large Wet Pond Volume, 1.5*Basic Volume: 1497. cu-ft <br /> Infiltration/Filtration Statistics <br /> Inflow Volume (ac-ft): 95.81 <br /> Inflow Volume Including PPT-Evap (ac-ft): 95.81 <br /> Total Runoff Infiltrated (ac-ft): 0.00, 0.00% <br /> Total Runoff Filtered (ac-ft): 0.00, 0.00% <br /> Primary Outflow To Downstream System (ac-ft): 95.80 <br /> Secondary Outflow To Downstream System (ac-ft): 0.00 <br /> Percent Treated (Infiltrated+Filtered)/Total Volume: 0.00% <br /> ***********Compliance Point Results************* <br />