Laserfiche WebLink
Beam splices to <br /> occur over posts with <br /> 1-1/2"min.bearing <br /> / 18"min. z Girder beam <br /> / / /-1x io <br /> Corrosion <br /> resistant metal \°; <br /> column cap. - `-: `�\ -. <br /> Follow <br /> manufacturer's . <br /> installation • <br /> instructions. _ 450 4 x 4 knee brace. <br /> -ao <br /> 112"diameter lag bolt <br /> top&bottom(typical) <br /> Alternate Knee Brace Detail: Pressure treat ed <br /> 2 x 4 knee brace face nailed ea. • wood post 6 <br /> side of post and beam with <br /> 4 16d nails at each face — <br /> and connection. • - <br /> 3 Knee Brace Detail NOTE: <br /> . .. Knee braces are required if <br /> distance from grade to top-of post <br /> exceeds 4 feet. <br />