My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10307 1ST DR SE 2020-04-03
>
Address Records
>
1ST DR SE
>
10307
>
10307 1ST DR SE 2020-04-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2020 10:01:15 AM
Creation date
4/3/2020 10:00:50 AM
Metadata
Fields
Template:
Address Document
Street Name
1ST DR SE
Street Number
10307
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3/2/2020 City of Everett Page <br /> 7:42:11AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. B1911-031 Site Address 10307 1ST DR SE <br /> Applied 11/25/2019 Applicant KING LEX Lot <br /> Approved 11/25/2019 Owner BERUTTI ANDREA Block <br /> Issued 11/25/2019 Contractor SMART ENERGY TODAY INC Tract <br /> Parent Permit No. Description SOLAR PANEL INSTALL <br /> Notes **MANUFACTURERS SPECS SHOULD BE ON JOBSITE FOR THE BUILDING INSPECTORS TO <br /> REFER TO** <br /> Scheduled Completed Tvne Inspector Result Remarks Inspector's Comments <br /> 1/14/2020 1/14/2020 BLDG 15-FINAL KMK CORRECTION Complete electrical <br /> final inspection <br /> 1/21/2020 1/21/2020 BLDG 15-FINAL KMK CORRECTION see notes 1/15/2020 2:47 PM SMART ENERGY <br /> TODAY INC <br /> This is tied in with E1911-150 Electrical <br /> final which is going to be done at the same <br /> time <br /> Contact Name:Andrea Burretti <br /> Site Address: 10307 1st Dr SE,Everett, <br /> Washington 98208 <br /> Phone:8478526786 <br /> e-Mail:Hector.f@smartenergytoday.net <br /> (1/21/2020 3:56 PM KMK) <br /> Obtain an electrical final inspection before <br /> calling for a building final. <br /> 2/7/2020 2/7/2020 BLDG 15-FINAL KMK CORRECTION complete electrical (2/5/2020 3:33 PM KMK) <br /> inspections KMK changed Inspection Type from BLDG <br /> 15-FINAL to BLDG 15-FINAL <br /> KMK changed Inspection Date/Time from <br /> 02/05/2020 to 02/07/2020 <br /> 2/28/2020 2/28/2020 BLDG 15-FINAL KMK APPRVD-PERI electrical scheduled Les 360-637-4343 x2227 <br /> for today <br /> 2/28/2020 2/28/2020 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> INSP12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.