My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020/03/18 Council Minutes
>
Council Minutes
>
2020/03/18 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2020 9:00:20 AM
Creation date
4/13/2020 9:00:06 AM
Metadata
Fields
Template:
Council Minutes
Date
3/18/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 18, 2020 <br /> RESOLUTION —PAYROLL <br /> To adopt Resolution No. 7495 authorizing payroll claims against the City of <br /> Everett in the amount of$4,315,838.75 for the period ending February 29, 2020. <br /> AGREEMENT AMENDED—3600 SMITH STREET CLEAN UP <br /> To authorize the Mayor to sign the 3600 Smith Street Clean Up - Change Order <br /> No. 1 with 10 Environmental and Infrastructure, Inc. in the amount of <br /> $72,863.42. <br /> AGREEMENT— LOCAL TRANSIT SERVICES' OPTION ANALYSIS- PHASE 2 <br /> To authorize the Mayor to sign a Professional Service Agreement with <br /> Nelson/Nygaard regarding local transit services' option analysis - Phase 2 in an <br /> amount not to exceed $164,174. <br /> AGREEMENT—PORT GARDNER STORAGE FACILITY-FACILITIES PLAN <br /> Authorize the Mayor to sign a Professional Services Agreement with HDR, Inc. <br /> to provide engineering services for the Port Gardner Storage Facility-Facilities <br /> Plan in the amount of$997,885. <br /> JOB COMPLETE— EVERGREEN BRANCH LIBRARY EXPANSION PROJECT <br /> To accept the construction of the Evergreen Branch Library Expansion Project as <br /> complete and authorize the Mayor to sign the Certificate of Completion with <br /> Faber Construction Corporation in the amount of$5,248,803.48. <br /> AGREEMENT AMENDED — SEI TO SRI INTERTIE AND SRO8 OUTFALL <br /> REHABILITATION FINAL DESIGN AND CONSTRUCTION SUPPORT <br /> To authorize the Mayor to sign Amendment No.2 with Jacobs Engineering Group <br /> Inc. for SEI to SRI Intertie and SRO8 Outfall Rehabilitation Final Design and <br /> Construction Support in the amount of$187,172. <br /> 85 <br />
The URL can be used to link to this page
Your browser does not support the video tag.