Laserfiche WebLink
INSPECTION REPORT <br /> �� Date"1 _2Q1`3 Permit: eI 5-vL iv <br /> f <br /> Contractor: —eLQ_c _ _ C <br /> Owner: K-1. i icL <br /> Site Address: I I ___ ,Lfl`__612,-_ <br /> - nVie. <br /> _____ <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑,Rooftop Units ❑Water Service <br /> ['Grounding ❑Insulation E Mechanical Final ❑Medical Gas <br /> r❑Ceiling Grid ❑Drywall Nailing II]Plumbing Final <br /> 17wlectrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> '; •PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> • OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> E--- <br /> 0 UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> Inspector: ,' 51 , Date: 9 - 2-5 "3 <br /> EIR(10/06) DATABAR.INC <br />