Laserfiche WebLink
- <br /> eigf Residential Photovoltaic OTC. Permit Application <br /> • . <br /> Contractors can apply for an Over-The-Counter(OTC)permit where the PV system meets the requirements listed <br /> . . In this Checklist.All project plans and supporting documentation must be provided on site for the Inspector. <br /> --------TO BE COMPLETED BY APPLICANT <br /> 0 Project Information <br /> Property Owner Name: ‘X 6 •6 <br /> Project Address: X a LIL 4j (L.AVETP a mei# <br /> City: Eki I State: vm ZIP: bcDO <br /> Day Phone: 4Q 5- - 6763 tioaco <br /> Contractor Name c-TO <br /> Contractor License#: i(b 3V1E- 9- <br /> Contractor Day Phone: 3(1;‘,.% 9 574 • <br /> PV system description <br /> (include manufacturer I 41c- IS'iL 2-,Tb 6'3 <br /> and model#of PV • <br /> modules and ottke_ LIC 5k4-%(i- <br /> inverters): <br /> ®Determine if your project qualifies for expedited permitting: <br /> Yes No <br /> 1. PV system is designed and proposed for a detached one-or two-family dwelling or <br /> townhouse not more than three stories above grade or detached accessory structure that 01( <br /> 0 <br /> Is code compliant to setbacks and height, or code allows expansion of nonconformity for <br /> solar modules.[IRC 101.2] <br /> 2, Modules on pitched roofs do not exceed the highest point of the roof unless approved by od <br /> 0 <br /> the local jurisdiction. <br /> 3, Rooftop Is made from lightweight material suclias a single layer of composition shingles, rx <br /> metal roofing,lightweight masonry,or cedar Shingles. <br /> 4. The installation shall comply with the manufacturer's instructions.[IRC M2302.2] 41f 0 <br /> 5. The Installation shall meet the requirements of NFPA 70 National Electric Code,and all <br /> required electrical permit(s)must be obtained from the Authority Having Jurisdiction to <br /> administer the electrical code. [MC M2302.2] <br /> 6. The Installation shall meet the requirements of the International Fire Code as amended <br /> by WA State.[IRC M2302.2] <br /> 7. The PV system Is designed for the wind speed of the local area,and will be installed per <br /> 0 <br /> the manufacturer's specifications. [IRC M2302,2,1(1)] <br /> 8. The ground snow load does not exceed 70 pounds per square foot,[IRC M2302,2.1(2)] 0 <br /> 9. Total dead load of modules,supports,mountings,raceways and all other appurtenances <br /> weigh no more than-four pounds persquare foot.[IC M2302,2.1(3)] <br /> Enter total dead load of system (lbetz): <br /> • <br /> 10. To address uplift,modules are mounted no higher than 18"above the surface of the <br /> roofing to whit!)they are affixed.[IRC M2302,2.1(4)) rL <br />