Laserfiche WebLink
!11111 . INSPECTION REPORT <br /> Date IS 7 Permit: <br /> I <br /> \—1� <br /> 1 <br /> Allir <br /> Contractor: A I <br /> i' -5. i.� <br /> —{ n`Owner: <br /> \4 0 J -1/ ' <br /> Site Address: wl 3 `c �_ / <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ji-of• ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> J Service ❑Framing ❑Rooftop Units ❑Water Service <br /> •Groundi•• ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> • el Ing Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OT a a.: CONSULTATION: <br /> g ••:• • ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ■ •- .• T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: - <br /> ❑��CALL(4255))257-8881 FOR REINSPECTION—24 hour notice required <br /> C1 SI FICO l LZ- <br /> C4u- PcA1 <br /> 1 <br /> Inspector: j,,I) Date: a <br /> EIR(10/06) DATABAR.INC. <br />