My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Krazan & Associates Inc. 4/2/2020
>
Contracts
>
6 Years Then Destroy
>
2020
>
Krazan & Associates Inc. 4/2/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2020 9:57:13 AM
Creation date
4/20/2020 9:56:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Krazan & Associates Inc.
Approval Date
4/2/2020
End Date
12/31/2020
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Geotechnical Investigation Water Main Repl V
Public Works WO Number
UP3730
Tracking Number
0002281
Total Compensation
$21,417.44
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A-1 <br /> UP3730 <br /> -==_.„--Krazan & ASSOCIATES, INC. <br /> GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING <br /> CONSTRUCTION TESTING & INSPECTION <br /> March 13,2020 Proposal No. G20165WAL <br /> Page 1 <br /> City of Everett <br /> 3200 Cedar Street <br /> Everett,WA 98201 <br /> Attn: Mr. Richard Hefti,PE <br /> Reference: Proposal for Geotechnical Engineering Investigation <br /> UP No. 3730,Water Main Replacement"V" <br /> Everett,WA <br /> Dear Mr.Hefti: <br /> We are pleased to present our scope of work and cost estimate to conduct a geotechnical engineering <br /> investigation for the Water Main Replacement "V" project. This proposal has been developed based on <br /> the information that was provided in your email dated February 24, 2020. The email included a <br /> Geotechnical Engineering Scope of Work(Exhibit A-1) and maps showing the approximate locations of <br /> the three planned water main alignments (Parts 1, 2, and 3). We also based this proposal on a review of <br /> available topographic and geologic maps of the site areas, aerial photographs of the site areas, as well as <br /> experience with projects of similar size and scope. Exhibit A-1 also included descriptions of the new <br /> water main alignment locations as summarized in the following table: <br /> Road From To Prop.Dia. <br /> Olympic Blvd W Mukilteo Blvd Ridgemont Drive 8-inch <br /> Ridgemont Drive Olympic Blvd 4428 Ridgemont Drive 8-inch(?) <br /> Pine Street Hewitt Avenue 25th Street 8-inch <br /> Wetmore Avenue 10th Street 7th Street 8-inch <br /> It is our current understanding that the new water main will include approximately 5,300 lineal feet of 8- <br /> inch diameter ductile iron water pipe. We anticipate that the water main will be installed with 36 to 48 <br /> inches of cover using standard trench excavation techniques. The project will also include removal or <br /> abandonment of valves, fire hydrants, water service lines and installation of new water meter boxes and <br /> setters,related appurtenances and surface restoration. The water main lines will be located within City of <br /> Everett Right-Of-Way(ROW) and easements. <br /> Offices Serving The Western United States <br /> 4303—198th Street SW•Lynnwood,Washington 98036•(425)485-5519•Fax(425)485-6837 <br />
The URL can be used to link to this page
Your browser does not support the video tag.