My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Krazan & Associates Inc. 4/2/2020
>
Contracts
>
6 Years Then Destroy
>
2020
>
Krazan & Associates Inc. 4/2/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2020 9:57:13 AM
Creation date
4/20/2020 9:56:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Krazan & Associates Inc.
Approval Date
4/2/2020
End Date
12/31/2020
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Geotechnical Investigation Water Main Repl V
Public Works WO Number
UP3730
Tracking Number
0002281
Total Compensation
$21,417.44
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A-1 <br /> KRAZAN&ASSOCIATES, INC. U P3730 <br /> Proposal No.G20165WAL <br /> Everett Water Main Replacement"V" <br /> Everett,WA <br /> March 13,2020 <br /> Page 4 <br /> • Recommendations for seismic design considerations including site <br /> coefficient and ground acceleration; <br /> • Recommendations for erosion control during construction. <br /> We plan to submit the report via email as a pdf file. Hard copies of the geotechnical <br /> report can be provided on request. The services will be performed in accordance with <br /> generally accepted standards of the geotechnical engineering profession. All reports will <br /> be signed and stamped by a State of Washington registered professional engineer. <br /> 5. Geotechnical Communications,Design Report and Meetings <br /> A Statement of Qualifications and the resumes of key personnel are attached to this <br /> proposal. Our geotechnical engineer and geologist will be available to provide a <br /> summary of the subsurface conditions encountered in the explorations and answer <br /> questions after the field work is completed. During the construction phase of the project, <br /> our representative will be available, under a separate contract, to travel to the site on an <br /> as-needed basis to observe the soil conditions to confirm that they are consistent with the <br /> findings of our geotechnical evaluation. A separate cost estimate for construction <br /> monitoring can be given at a later date, at your request. Krazan would be available to <br /> coordinate with the City's survey consultant to allow time to locate the borings and <br /> establish ground elevations. <br /> 6. Project Milestones <br /> The project schedule in Exhibit A-1 indicates the Notice to Proceed(NTP)will be March <br /> 23,2020. <br /> The fieldwork would commence as soon as possible upon receiving your authorization to <br /> proceed, upon obtaining utility clearances, and based on the availability of the <br /> subcontracted flaggers and drill rig. We will begin laboratory testing immediately upon <br /> completing the field exploration. <br /> We intend to submit a Draft Report on or before May 8, 2020. We anticipate submitting <br /> our Final Geotechnical Engineering Report by May 15,2020. <br /> 7. Prevailing Wages <br /> Our cost estimate includes prevailing wages for drilling and traffic control operations. <br /> COST ESTIMATE <br /> A detailed unit price schedule and budget estimate for the scope of a geotechnical engineering <br /> investigation and report is attached to this proposal for your review. In developing this cost estimate, <br /> we have assumed that adequate access will be available to the soil boring locations, and that permission to <br /> access the site will be provided by you. <br /> Krazan&Associates,Inc. <br /> Offices Serving The Western United States <br />
The URL can be used to link to this page
Your browser does not support the video tag.