My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Inc. 4/2/2020
>
Contracts
>
6 Years Then Destroy
>
2021
>
HDR Inc. 4/2/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2020 1:10:04 PM
Creation date
4/20/2020 1:09:01 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Inc.
Approval Date
4/2/2020
Council Approval Date
3/18/2020
End Date
9/30/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Port Gardner Storage Facility-Facilities Plan
Public Works WO Number
UT3728
Tracking Number
0002288
Total Compensation
$997,885.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Policy Number: TB2-641-444950-039 <br /> THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. <br /> DESIGNATED CONSTRUCTION PROJECT(S) <br /> GENERAL AGGREGATE LIMIT <br /> This endorsement modifies insurance provided under the following: <br /> COMMERCIAL GENERAL LIABILITY COVERAGE PART <br /> SCHEDULE <br /> Designated Construction Project(s): <br /> All construction projects not located at premises owned, leased or rented by a Named Insured <br /> Information required to complete this Schedule, if not shown above, will be shown in the Declarations. <br /> A. For all sums which the insured becomes legally 3. Any payments made under Coverage A for <br /> obligated to pay as damages caused by "occur- damages or under Coverage C for medical <br /> rences" under Section I—Coverage A, and for all expenses shall reduce the Designated Con- <br /> medical expenses caused by accidents under struction Project General Aggregate Limit for <br /> Section I — Coverage C, which can be attributed that designated construction project. Such <br /> only to ongoing operations at a single designated payments shall not reduce the General Ag- <br /> construction project shown in the Schedule gregate Limit shown in the Declarations nor <br /> above: shall they reduce any other Designated Con- <br /> t. A separate Designated Construction Project struction Project General Aggregate Limit for <br /> General Aggregate Limit applies to each des- any other designated construction project <br /> ignated construction project, and that limit is shown in the Schedule above. <br /> equal to the amount of the General Aggregate 4. The limits shown in the Declarations for Each <br /> Limit shown in the Declarations. Occurrence, Damage To Premises Rented To <br /> 2. The Designated Construction Project General You and Medical Expense continue to apply. <br /> Aggregate Limit is the most we will pay for the However, instead of being subject to the <br /> sum of all damages under Coverage A, ex- General Aggregate Limit shown in the Decla- <br /> cept damages because of "bodily injury" or rations, such limits will be subject to the appli <br /> "property damage" included in the "products- cable Designated Construction Project Gen- <br /> completed operations hazard", and for medi— <br /> cal expenses under Coverage C regardless of <br /> the number of: <br /> a. Insureds; <br /> b. Claims made or"suits" brought; or <br /> c. Persons or organizations making claims or <br /> bringing "suits". <br /> CG 25 03 05 09 © Insurance Services Office, Inc., 2008 Page 1 of 2 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.